SADDLETREE INC. | B= | C | 12/17/2013 | | JOND | JOND | | B= | C | 4658281 |
SADDLETREE INC. | B= | P | 12/16/2013 | need sump pump in outside pit and piped out / finished basement / insulation certificate on file -- Schedule a new Building Final when above items are complete. | JOND | JOND | | B= | P | 4657654 |
SADDLETREE INC. | BSP | P | 10/22/2013 | pad in furnace room ok | JOND | JOND | | BSP | P | 4627166 |
SADDLETREE INC. | BLA | C | 10/17/2013 | | JOND | JOND | | BLA | C | 4624410 |
SADDLETREE INC. | BFR | C | 09/25/2013 | engineer letters on file for truss fix | JOND | JOND | | BFR | C | 4610427 |
SADDLETREE INC. | BFR | R | 09/17/2013 | need HRR signed off / will need wood burning fireplace put on plans or pull its own permit / need engineer fix for trusses G3 - G6 / firestop throughout / lateral missing at C1 / missing header in bearing wall in mother in law bedroom / 2-2x4's under ml beam and hts20 strap by kitchen / fha strap plumbing pipes in bearing wall / can't see post connection at rear porch / need truss connection at girder at front of garage / can't have window in garage at wall by front porch / bring pt loads down at front wall / shoot down t-posts / ? on pad under 2 t-posts in furnace room / need tempered window by stairs or guardrail / ok to insulate | JOND | JOND | | BFR | R | 4605634 |
SADDLETREE INC. | BSP | T | 08/30/2013 | PAID (REC#1151724) PLAN SPLICE FEE: $50 by: DALEH for Mechanical | DALEH | DALEH | | BSP | T | 4595990 |
SADDLETREE INC. | BSP | T | 08/29/2013 | PAID (REC#1151724) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: removed dampers | DALEH | DALEH | | BSP | T | 4595206 |
SADDLETREE INC. | BFD | C | 06/21/2013 | | JOND | JOND | | BFD | C | 4548112 |
SADDLETREE INC. | BFT | C | 06/21/2013 | engineer letter on file | JOND | JOND | | BFT | C | 4548111 |
SADDLETREE INC. | BFN | C | 06/21/2013 | engineer letter on file / design and soils on file / drain usable area | JOND | JOND | | BFN | C | 4548109 |
SADDLETREE INC. | BFN | P | 06/11/2013 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFN | P | 4540645 |
SADDLETREE INC. | BFT | P | 06/11/2013 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFT | P | 4540644 |
D & J QUALITY ELECTRIC INC | E= | C | 12/12/2013 | 2-30 AMP A.C'S | MIKEC | MIKEC | | E= | C | 4655792 |
D & J QUALITY ELECTRIC INC | ES | C | 09/12/2013 | Residential Underground: NEW 200 AMP SERVICE | MIKEC | MIKEC | | ES | C | 4603855 |
D & J QUALITY ELECTRIC INC | ER | C | 09/12/2013 | | MIKEC | MIKEC | | ER | C | 4603852 |
BROWN'S HEATING & COOLING, INC | H= | C | 12/13/2013 | WILL SCAN DUCT LEAKAGE REPORT | KEITHW | KEITHW | | H= | C | 4656303 |
BROWN'S HEATING & COOLING, INC | H= | P | 12/02/2013 | NEED DUCT LEAKAGE REPORT NOTES: ALL OTHER ISSUES RESOLVED | KEITHW | KEITHW | | H= | P | 4650123 |
BROWN'S HEATING & COOLING, INC | H= | P | 11/27/2013 | NEED DUCT LEAKAGE REPORT, NEED LADDER FOR ATTIC ACCESS, MISSING SUPPLY RUN IN FRONT BEDROOM NOTES: A/C INSTALLED ON BOTH UNITS, LOUVER DOOR FOR BASEMENT FURNACE | KEITHW | KEITHW | | H= | P | 4649095 |
BROWN'S HEATING & COOLING, INC | HC | C | 09/20/2013 | RELEASE METER | JERRYF | JERRYF | | HC | C | 4608533 |
BROWN'S HEATING & COOLING, INC | HRR | C | 09/20/2013 | CONFIRM ATTIC FURNACE FLUE CONNECTIONS AT FINAL- REST OK. NOTES: DUCT AND FURNACES OK - 6" OSA TO FURNACE - FINISHED BASEMENT - AC ROUGH x 2 - MASTER FIREPLACE FRAME OK - BY FINAL - CONFIRM ATTIC CONDENSATE DRAINS - MAIN FLOOR FIREPLACE NOT INSTALLED AT THIS TIME | JERRYF | JERRYF | | HRR | C | 4608141 |
BROWN'S HEATING & COOLING, INC | HRR | P | 09/17/2013 | REPLACE R6 SUPPLY FLEX IN ATTIC WITH R8- NEED LADDER FOR ACCESS TO ATTIC FURNACE - RECONNECT MASTER BATH FAN FLEX x 2 - IS MAIN FIREPLACE BEING INSTALLED - MAY BE MORE | JERRYF | JERRYF | | HRR | P | 4605789 |
BROWN'S HEATING & COOLING, INC | HRR | P | 09/16/2013 | Need stamped mechanical plans on site for inspection. | MICHAELS | MICHAELS | | HRR | P | 4604910 |
KAMPP-L ENTERPRISES, INC. | HI | C | 09/13/2013 | 10# OK. NOTES: 11/2" MAIN - 125' DESIGN - GOOD FOR 532000 BTU - 11/4" GOOD FOR 355000 BTU - 2 FURN - 2 WH - 2 FP RNG - BBQ | JERRYF | JERRYF | | HI | C | 4604431 |
KAMPP-L ENTERPRISES, INC. | P= | C | 11/22/2013 | finished basement, pvb installed. | DICK | DICK | | P= | C | 4646952 |
KAMPP-L ENTERPRISES, INC. | PTO | C | 09/13/2013 | | LEE | LEE | | PTO | C | 4604590 |
KAMPP-L ENTERPRISES, INC. | PTO | P | 09/12/2013 | LEAK AT GARAGE SINK VENT TEE. NOTE:FINISHED BASEMENT | JOEL | JOEL | | PTO | P | 4603582 |
KAMPP-L ENTERPRISES, INC. | PB | C | 07/01/2013 | | LEE | LEE | | PB | C | 4555064 |