DLM ENTERPRISES | B= | C | 07/23/2014 | | JOND | JOND | | B= | C | 4782265 |
DLM ENTERPRISES | B= | P | 07/22/2014 | can't have door knobs at bathroom doors and hallway door by church area -- Schedule a new Building Final when above items are complete. | JOND | JOND | | B= | P | 4781744 |
DLM ENTERPRISES | BSP | T | 07/11/2014 | PAID (REC#1206795) ADDITIONAL PLAN REVIEW TIME: $50 From: JIMA splice changed exit doors | JIMA | JIMA | | BSP | T | 4775467 |
DLM ENTERPRISES | B= | P | 07/08/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet, HOMELAND MECHANICAL Mechanical Final Inspection is not Completed yet. phase one (west half) complete/ phase two- need closures installed at 90 minute fire doors -- Schedule a new Building Final when above items are complete. | BLAKE | BLAKE | | B= | P | 4772907 |
DLM ENTERPRISES | BSP | P | 06/24/2014 | 3 layers of drywall are all installed on church (west) side of 2 hour fire barrier wall. However, a spot check for existing single layer on east side of wall shows drywall missing in areas above ceiling. Need that single layer installed completely to deck for the entire length of the wall in order for it to comply with UL design U408. | BLAKE | BLAKE | | BSP | P | 4764767 |
DLM ENTERPRISES | BFR | P | 06/16/2014 | interior walls at bathroom and storage ok / need all other roughs signed off / 1st part of fire barrier wall 2 layers ok, need to provide headwall detail where wall meets the underside of metal deck | JOND | JOND | | BFR | P | 4758618 |
DLM ENTERPRISES | B= | R | 06/02/2014 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet, LONGO PLUMBING Plumbing Final Inspection is not Completed yet. suite 160 -- need handicap bathroom signage up / need signage above door / need all other finals signed off | JOND | JOND | | B= | R | 4749047 |
DLM ENTERPRISES | BFR | P | 05/22/2014 | "phase one" (west half) ok pending electric rough inspection | BLAKE | BLAKE | | BFR | P | 4744267 |
DLM ENTERPRISES | BSP | T | 05/08/2014 | PAID (REC#1193940) PLAN SPLICE FEE: $50 by: DANM for Construction: Relocated fire wall and added enlarged restroom plan | DANM | DANM | | BSP | T | 4735423 |
DLM ENTERPRISES | BSP | P | 05/06/2014 | inspections assigned to jon d | BLAKE | BLAKE | | BSP | P | 4733413 |
DOWNTOWN ELECTRIC COMPANY | E= | C | 07/07/2014 | | MIKEC | MIKEC | | E= | C | 4772142 |
DOWNTOWN ELECTRIC COMPANY | ER | C | 06/13/2014 | BATHROOMS AND CLOSET | MIKEC | MIKEC | | ER | C | 4758061 |
DOWNTOWN ELECTRIC COMPANY | E= | P | 05/30/2014 | | MIKEC | MIKEC | | E= | P | 4748810 |
DOWNTOWN ELECTRIC COMPANY | E= | R | 05/28/2014 | CAN'T FINAL W/O POWER | MIKEC | MIKEC | | E= | R | 4747155 |
DOWNTOWN ELECTRIC COMPANY | ER | P | 05/22/2014 | BATHROOMS AND BREAKROOM | MIKEC | MIKEC | | ER | P | 4744368 |
HOMELAND MECHANICAL LLC | H= | C | 07/08/2014 | received balance report | JON | JON | | H= | C | 4772948 |
HOMELAND MECHANICAL LLC | H= | P | 07/07/2014 | need balance report, interlocks verified | JON | JON | | H= | P | 4772050 |
HOMELAND MECHANICAL LLC | H= | R | 07/02/2014 | NEW WORK MUST BE EXPOSED FOR INSPECTION, CONTACTED CONTRACTOR AND ADVISED CONTRACTOR TO ENSURE THE FOLLOWING CODE APPLIES TO EXHAUST DUCTS IN RETURN PLENUMS. RBC304.4.9 Section 601.4 Contamination prevention. Revise the exception to “Exception 1.” Add the following exception: 2. Environmental air exhaust ducts may extend into or through ducts or plenums if the exhaust duct is constructed without joints; or the exhaust duct is serving a fan rated at 150 cfm (2,124 L/m) or less. | JON | JON | | H= | R | 4770055 |
HOMELAND MECHANICAL LLC | HD | P | 06/17/2014 | NO INSPECTION FOR OTHER EXHAUST FANS NOTES: EXHAUST FAN IN MEN'S RESTROOM IN 130 OK | KEITHW | KEITHW | | HD | P | 4760042 |
LONGO PLUMBING | P= | C | 07/08/2014 | corrections made. | DICK | DICK | | P= | C | 4772114 |
LONGO PLUMBING | P= | P | 07/07/2014 | pending tempering valves at new public lavs. | DICK | DICK | | P= | P | 4771594 |
LONGO PLUMBING | PB | C | 06/23/2014 | unit 120 dwv ok. this completes base inspection for 120 and 160. note, other units have existing plumbing that is not changed. | DICK | DICK | | PB | C | 4763090 |
LONGO PLUMBING | PTO+ | C | 06/23/2014 | 3 water closets, 4 lavs, 1 urinal, 1 mop sink. 1 drinking fountain dwv and water ok. water heater at final. unit 120. | DICK | DICK | | PTO+ | C | 4763072 |
LONGO PLUMBING | P= | P | 06/02/2014 | LEAK AT SINK IN BREAK ROOM NOTES: ALL ELSE OK | KEITHW | KEITHW | | P= | P | 4749774 |
LONGO PLUMBING | PTO | C | 05/19/2014 | OK | KEITHW | KEITHW | | PTO | C | 4741598 |
LONGO PLUMBING | PTO | P | 05/16/2014 | need to complete water lines and have on test. add mop sink and water heater to permit. 2 water closets, 2 lavs,1 mop sink, 1 sink, 1 drinking fountain and 1 water heater. | DICK | DICK | | PTO | P | 4740254 |
LONGO PLUMBING | PB | P | 05/16/2014 | unit 160 only. | DICK | DICK | | PB | P | 4740251 |