CUVALA CONSTRUCTION, INC. | B= | C | 04/14/2015 | items corrected | DANE | DANE | | B= | C | 4935726 |
CUVALA CONSTRUCTION, INC. | B= | P | 04/13/2015 | need wired CO alarms outside of each of the bedrooms/will need to add one outside of the bedroom off of the hall from the bottom of the stairs -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | DANE | DANE | | B= | P | 4934723 |
CUVALA CONSTRUCTION, INC. | BIN | C | 02/02/2015 | | DANE | DANE | | BIN | C | 4894742 |
CUVALA CONSTRUCTION, INC. | BFR | C | 02/02/2015 | items complete from previous inspection | DANE | DANE | | BFR | C | 4894738 |
CUVALA CONSTRUCTION, INC. | BFR | P | 01/28/2015 | OK to insulate/attach structural gable to side walls at living room | DANE | DANE | | BFR | P | 4891978 |
CUVALA CONSTRUCTION, INC. | BLA | C | 01/26/2015 | | DANE | DANE | | BLA | C | 4890433 |
CUVALA CONSTRUCTION, INC. | BSP | P | 01/16/2015 | PLAN SPLICE: (No Fee) by: MICHAEL for Construction: Substitute boiler at furnace location | MICHAELA | MICHAELA | | BSP | P | 4886023 |
CUVALA CONSTRUCTION, INC. | BSP | T | 01/16/2015 | PAID (REC#1241328) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: chnaged to boiler | DALEH | DALEH | | BSP | T | 4886014 |
CUVALA CONSTRUCTION, INC. | BSP | P | 01/05/2015 | narrow braced wall ok, front porch ok, deck posts ok | JOND | JOND | | BSP | P | 4880461 |
CUVALA CONSTRUCTION, INC. | BFD | C | 11/24/2014 | | JIMA | JIMA | | BFD | C | 4859450 |
CUVALA CONSTRUCTION, INC. | BFN | C | 11/10/2014 | design and open hole letter on file / drain usable area / ufer rod in | JOND | JOND | | BFN | C | 4851604 |
CUVALA CONSTRUCTION, INC. | BFT | C | 11/03/2014 | | JOND | JOND | | BFT | C | 4847429 |
PORCH ELECTRIC, INC. | E= | C | 04/09/2015 | 30 AMP A.C | MIKEC | MIKEC | | E= | C | 4932712 |
PORCH ELECTRIC, INC. | ES | C | 01/08/2015 | Residential Underground: NEW 200 AMP SERVICE | MIKEC | MIKEC | | ES | C | 4882274 |
PORCH ELECTRIC, INC. | ER | C | 01/08/2015 | CENTRAL VAC. INSTALLED | MIKEC | MIKEC | | ER | C | 4882241 |
HOMEOWNER | H= | C | 04/10/2015 | Note: venting corrections made at condenser rest o.k. | STEVEC | STEVEC | | H= | C | 4933716 |
ARROW HAWK HEATING, LLC | HC | C | 01/28/2015 | RELEASE METER | KEITHW | KEITHW | | HC | C | 4891786 |
ARROW HAWK HEATING, LLC | HRR | C | 01/28/2015 | OK NOTES: DIRECT VENT BOILER, AIR HANDLER WITH NO HEAT IN ATTIC, PRIMARY DRAIN OK, SECONDARY DRAIN OUT BACK OF HOUSE IN EVE, DUCT LEAKAGE TO SCANNING | KEITHW | KEITHW | | HRR | C | 4891785 |
O.M.A.G.M., INC. | HI | C | 01/09/2015 | 10 PSI TEST OK NOTES: 1 1/2" GAS LINE, BOILER, RANGE, 2-FIREPLACE, DRYER, BBQ | KEITHW | KEITHW | | HI | C | 4883153 |
ARROW HAWK HEATING, LLC | HRR | R | 01/07/2015 | No plans on site. Plans on file show duct design for both floors with two furnaces. Current set up is infloor heat both floors with air handler in attic for A/C. A plan splice showing new equipment schedule and heat calc's is required. No boiler/water heater vent installed, missing framing on main level fireplace and need ladder in place for air handler on next inspection. Re inspect all. JON ADDED NOTE 1-16-15, LET HOMEOWNER KNOW THIS PROJECT WILL REQUIRE DUCT LEAKAGE TEST FOR ATTIC SYSTEM ALSO. | MARKB | MARKB | | HRR | R | 4881916 |
HOMEOWNER | HWP | C | 12/01/2014 | 60 PSI TEST OK FOR BASEMENT HWP NOTES: OK TO COVER ON MECHANICAL | KEITHW | KEITHW | | HWP | C | 4862278 |
HOMEOWNER | P= | C | 04/09/2015 | RP back flow installed, finished basement. | DICK | DICK | | P= | C | 4932618 |
HOMEOWNER | PTO | C | 01/27/2015 | TWO ITEMS CORRECTED | LEE | LEE | | PTO | C | 4891617 |
HOMEOWNER | PTO | P | 01/26/2015 | test and vent master tub trap. anchor closet flanges in basement. | DICK | DICK | | PTO | P | 4890816 |
HOMEOWNER | PB | C | 11/24/2014 | | GABE | GABE | | PB | C | 4859579 |