WATERS CONSTRUCTION COMPANY INC | B= | C | 04/29/2016 | All other required Final inspections are complete. (This is a computer generated result) | DAN | DAN | | B= | C | 5187619 |
WATERS CONSTRUCTION COMPANY INC | B= | P | 03/23/2016 | . Additional Inspections Required (computer generated): External Agency Inspection Z= by WOODLAND PARK is not Completed yet (Contact: Deidra Arnold at 719-687-5202 or Lisa Parnell at 719-687-5209). | DAN | DAN | | B= | P | 5160973 |
WATERS CONSTRUCTION COMPANY INC | BFR | P | 09/29/2015 | side wall framing moved 16" to side to create 5' clear space. Will require relocation of closet flange and another plumbing rough. Need other roughs completed. | DAN | DAN | | BFR | P | 5046499 |
WATERS CONSTRUCTION COMPANY INC | BSP | P | 09/18/2015 | met with contractor and Architect regarding bathroom clear space correction. Revised design will be submitted for approval. | DAN | DAN | | BSP | P | 5039545 |
WATERS CONSTRUCTION COMPANY INC | BFR | R | 09/17/2015 | fire stop top of chase; missing clear space in bathroom; talked with contractor regarding egress hardware. | DAN | DAN | | BFR | R | 5038755 |
REGESTER ELECTRIC | E= | C | 11/23/2015 | | MIKEC | MIKEC | | E= | C | 5085205 |
REGESTER ELECTRIC | ER | P | 08/21/2015 | WALLS | MIKEC | MIKEC | | ER | P | 5020110 |
SERVICE FIRST PLUMBING HEATING & DRAINS LLC | H= | C | 01/26/2016 | TEST AND BALANCE GOOD. | LUKE | LUKE | | H= | C | 5123838 |
SERVICE FIRST PLUMBING HEATING & DRAINS LLC | H= | P | 01/07/2016 | NEED TEST AND BALANCE REPORT. NOTE: VENTED ATTIC. | LUKE | LUKE | | H= | P | 5112128 |
SERVICE FIRST PLUMBING HEATING & DRAINS LLC | HRR | P | 08/28/2015 | OK FOR FLEX AND DIFFUSERS CALL AGAIN BEFORE TILE. BALANCE REPORT WITH OUTSIDE AIR INDICATED BEFORE FINAL | JON | JON | | HRR | P | 5024843 |
SERVICE FIRST PLUMBING HEATING & DRAINS LLC | HD | P | 08/26/2015 | NEED THE FOLLOWING FOR NEXT INSPECTION - LADDER FOR ACCESS TO ATTIC - ADD BATH FAN AND VENT TO PERMIT - ADD ALL SA AND RA DUCT TO PERMIT - SEAL ALL SPIN INS SOME HAVE LARGE GAPS AT DUCT - WHAT IS DUCT WORK LINED WITH 1" OR 2" LINER - STOPPED INSPECTION - MAY BE MORE - LEFT MESSAGE AT 12:00 ARRIVED 12:45 | JERRYF | JERRYF | | HD | P | 5022755 |
BAIRD & SONS PLUMBING INC. | P= | C | 01/22/2016 | corrections made. | TAYLOR | TAYLOR | | P= | C | 5121286 |
BAIRD & SONS PLUMBING INC. | P= | P | 01/07/2016 | need mixing valve at lav and trap guard in floor drain in restroom, rest ok. | TAYLOR | TAYLOR | | P= | P | 5111937 |
BAIRD & SONS PLUMBING INC. | PB | C | 11/19/2015 | moved toilet over 12 inches. | TAYLOR | TAYLOR | | PB | C | 5082222 |
BAIRD & SONS PLUMBING INC. | PTO | C | 09/16/2015 | break room sink deleted, water pipe is sized as per plan, note- check water heater at final. | TAYLOR | TAYLOR | | PTO | C | 5037592 |
BAIRD & SONS PLUMBING INC. | PTO | P | 09/10/2015 | nail protection at break room sink, water pipe size issues, revise plans to show added break room sink. | TAYLOR | TAYLOR | | PTO | P | 5033705 |