CMS OF COLORADO SPRINGS, INC. | B= | C | 06/02/2017 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 5523776 |
CMS OF COLORADO SPRINGS, INC. | B= | P | 06/02/2017 | . Additional Inspections Required (computer generated): External Agency Inspection Z= by WOODLAND PARK is not Completed yet (Contact: Deidra Arnold at 719-687-5202 or Lisa Parnell at 719-687-5209). | NICK | NICK | | B= | P | 5523675 |
CMS OF COLORADO SPRINGS, INC. | BIN | C | 06/02/2017 | | NICK | NICK | | BIN | C | 5523674 |
CMS OF COLORADO SPRINGS, INC. | BFR | C | 06/02/2017 | | NICK | NICK | | BFR | C | 5523661 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | BSP | T | 05/03/2017 | PAID (REC#1422932): ADDITIONAL PLAN REVIEW TIME: $50 From: JUSTINC | JUSTINC | JUSTINC | | BSP | T | 5495102 |
CMS OF COLORADO SPRINGS, INC. | BIN | P | 12/14/2016 | ceiling insulation R38 OK. still need framing completed. | DAN | DAN | | BIN | P | 5368025 |
CMS OF COLORADO SPRINGS, INC. | BFR | P | 11/16/2016 | partial framing, Trusses OK. OK to rock bottom side of trusses pending MEPs. at mechanical area ceiling will be furred down to achieved insulation requirements. | DAN | DAN | | BFR | P | 5345922 |
CMS OF COLORADO SPRINGS, INC. | BBB | C | 10/11/2016 | Top of wall beam OK. completes structure. | DAN | DAN | | BBB | C | 5316003 |
CMS OF COLORADO SPRINGS, INC. | BBB | P | 10/06/2016 | Beam at 6' OK Per detail 1/5.2 | DAN | DAN | | BBB | P | 5312520 |
CMS OF COLORADO SPRINGS, INC. | BBB | P | 10/04/2016 | bond beam at 3'6" and verticals OK. | DAN | DAN | | BBB | P | 5309931 |
CMS OF COLORADO SPRINGS, INC. | BSP | P | 09/19/2016 | #5 rebar in slab OK. | DAN | DAN | | BSP | P | 5296417 |
CMS OF COLORADO SPRINGS, INC. | BFI | C | 09/09/2016 | r10 foundation wall insulation 24" depth OK. | DAN | DAN | | BFI | C | 5288911 |
CMS OF COLORADO SPRINGS, INC. | BFN | C | 08/18/2016 | Wall and footer OK to pour. | DAN | DAN | | BFN | C | 5272850 |
CMS OF COLORADO SPRINGS, INC. | BFT | C | 08/18/2016 | | DAN | DAN | | BFT | C | 5272846 |
CMS OF COLORADO SPRINGS, INC. | BFT | P | 08/10/2016 | Received excavation observation. 2,400 psf bearing. | DAN | DAN | | BFT | P | 5265668 |
CMS OF COLORADO SPRINGS, INC. | BFT | R | 08/08/2016 | remove mud and water. recall. Pour footer first and then walls. Talked with foundation guy. | DAN | DAN | | BFT | R | 5263766 |
AMPED UP ELECTRIC, LLC, DBA ACE ELECTRIC | E= | C | 05/30/2017 | | JOHNN | JOHNN | | E= | C | 5520495 |
AMPED UP ELECTRIC, LLC, DBA ACE ELECTRIC | E= | P | 05/26/2017 | | JOHNN | JOHNN | | E= | P | 5519408 |
AMPED UP ELECTRIC, LLC, DBA ACE ELECTRIC | EP | P | 05/26/2017 | at main disco:bond neutral to can,bond gutter | JOHNN | JOHNN | | EP | P | 5518946 |
AMPED UP ELECTRIC, LLC, DBA ACE ELECTRIC | EP | P | 05/10/2017 | consult with Steve, | JOHNN | JOHNN | | EP | P | 5502567 |
AMPED UP ELECTRIC, LLC, DBA ACE ELECTRIC | ER | C | 12/09/2016 | south bath rm ceilings | JOHNN | JOHNN | | ER | C | 5364567 |
AMPED UP ELECTRIC, LLC, DBA ACE ELECTRIC | ER | P | 11/02/2016 | north bath rm, | JOHNN | JOHNN | | ER | P | 5334862 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | H= | C | 05/09/2017 | | TAYLOR | TAYLOR | | H= | C | 5500610 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | H= | P | 05/01/2017 | AUTO CALL COMPLETE AT 9:00 - ARRIVED 9:48 - NO ONSITE PERSONNEL - ALL DOORS WERE LOCKED - CONTRACTOR REVIEW ALL NOTES BEFORE CALLING NEXT INSPECTION | JERRYF | JERRYF | | H= | P | 5491587 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | H= | P | 05/01/2017 | TAB REPORT AND DUCT LEAKAGE REPORT RECEIVED - NEED FINAL WALK THRU AND PLAN REVISION PER PREVIOUS NOTES | JERRYF | JERRYF | | H= | P | 5491389 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | H= | P | 04/07/2017 | CANCELED PER CONVERSATION WITH CONTRACTOR.. | LUKE | LUKE | | H= | P | 5467329 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | HD | P | 02/06/2017 | NEED DUCT LEAKAGE REPORT TEST AND BALANCE REPORT ALSO NEED TO REVISE PLANS SHOWING 80% FURNACE IN THE ATTIC... NOTE: FLEX AND AND CEILING BOOTS ARE INSTALLED ALSO BATH ROOM EXHAUST FAN AND EXHAUST DUCT WORK.. VENT FOR FURNACE IS COMPLETE.. WATER HEATER NOT INSTALLED AT THIS TIME.. OK TO WRAP.. | LUKE | LUKE | | HD | P | 5407393 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | HC | C | 02/06/2017 | RELEASE METER | LUKE | LUKE | | HC | C | 5407360 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | HI | C | 02/06/2017 | 10 LB GAS TEST GOOD RAN PER PLANS.. | LUKE | LUKE | | HI | C | 5407353 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | P= | C | 05/09/2017 | | TAYLOR | TAYLOR | | P= | C | 5500621 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | P= | P | 05/01/2017 | after installing service sink ( H2O is now undersized ), still missing T&P drain. | TAYLOR | TAYLOR | | P= | P | 5491884 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | P= | P | 04/10/2017 | revise plans to show deletion of service sink, install T&P drain, rest ok. | TAYLOR | TAYLOR | | P= | P | 5469974 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | PTO | C | 02/09/2017 | | TIM | TIM | | PTO | C | 5411231 |
WOODLAND PLUMBING, HEATING & AIR CONDITIONING LLC | PB | C | 09/09/2016 | ok. | TAYLOR | TAYLOR | | PB | C | 5289511 |