ELEVATE CONSTRUCTION, INC. | B= | C | 02/08/2018 | | BERTW | BERTW | | B= | C | 5760713 |
ELEVATE CONSTRUCTION, INC. | B= | P | 01/16/2018 | Temp CO: all partial ( Expires: 2/15/2018 12:00:00 AM) | JANE | JANE | | B= | P | 5738766 |
ELEVATE CONSTRUCTION, INC. | B= | R | 01/12/2018 | House occupied without CO being issue / Contact Chief inspector Warchol prior to any further inspection requests // Final OK - no site re-inspect needed // Finished basement / Rear deck / Front upper deck. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | JUSTINL | JUSTINL | | B= | R | 5737380 |
ELEVATE CONSTRUCTION, INC. | BSP | P | 12/20/2017 | Deck frame Post to beam missing mechanical connection - Missing Joist hanger at ledger - OK to check at final // Reviewed egress requirements for sliding glass door at endless pool room requirements with contractor on site | JUSTINL | JUSTINL | | BSP | P | 5718225 |
ELEVATE CONSTRUCTION, INC. | BSP | P | 11/30/2017 | Still need to inspect front and rear deck frames - Spoke to contractor on site and decks will be inspected by or at final | JUSTINL | JUSTINL | | BSP | P | 5699114 |
ELEVATE CONSTRUCTION, INC. | BSP | P | 11/30/2017 | Rear deck piers vertical rebar OK / Lath at rear deck OK | JUSTINL | JUSTINL | | BSP | P | 5699113 |
ELEVATE CONSTRUCTION, INC. | BSP | P | 11/28/2017 | 6 rear deck piers missing vertical rebar reinforcements per foundation design - Depths and diameter OK / South porch post and base OK - Still need to inspect remaining posts once installed | JUSTINL | JUSTINL | | BSP | P | 5696328 |
ELEVATE CONSTRUCTION, INC. | BIN | C | 10/26/2017 | Insulation OK | JUSTINL | JUSTINL | | BIN | C | 5668525 |
ELEVATE CONSTRUCTION, INC. | BFR | C | 10/26/2017 | Frame corrections made | JUSTINL | JUSTINL | | BFR | C | 5668508 |
ELEVATE CONSTRUCTION, INC. | BFR | P | 10/20/2017 | Framing splice received / Finish nailing THJA26 at nook / Strap top plate above nook windows / Missing 2 2x6 posts for total of 3 at CJ01 in great room / Glue shims in beam pockets / Exposed rebar in beam pocket at mechanical room / Landing not framed per plan / Missing 4th 2x6 at double LVL at landing / Need to complete foam and firestop / Still need to inspect deck framing and piers | JUSTINL | JUSTINL | | BFR | P | 5662955 |
ELEVATE CONSTRUCTION, INC. | BFN | C | 10/20/2017 | Updated foundation design on file | JUSTINL | JUSTINL | | BFN | C | 5662954 |
ELEVATE CONSTRUCTION, INC. | BSP | T | 10/13/2017 | PAID (REC#1460602) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Minor structural revisions | MICHAELA | MICHAELA | | BSP | T | 5654831 |
ELEVATE CONSTRUCTION, INC. | BFR | T | 10/04/2017 | PAID (REC#1460602) Inspection stopped - Too many items - Will need full reinsepct of frame / Prior to recalling inspection Master plan needs to be updated to show all changes including added features, hardware and trusses used - Truss details in master plan do not reflect numerical or alphabetical configuration of trusses on site - Will need updated truss packet on file to complete inspection | JUSTINL | JUSTINL | | BFR | T | 5644525 |
ELEVATE CONSTRUCTION, INC. | BLA | C | 09/11/2017 | | RICHB | RICHB | | BLA | C | 5622115 |
ELEVATE CONSTRUCTION, INC. | BSP | P | 09/06/2017 | Exterior shear OK / plans reviewed electronically | RICHB | RICHB | | BSP | P | 5617894 |
ELEVATE CONSTRUCTION, INC. | BFN | P | 09/06/2017 | Forms & rebar for (2) walls on left side OK (see bottom left of sheet S-1) / plans reviewed electronically | RICHB | RICHB | | BFN | P | 5617860 |
ELEVATE CONSTRUCTION, INC. | BFT | C | 05/22/2017 | interior pads and exterior footings observed | LINDSEY | LINDSEY | | BFT | C | 5513084 |
ELEVATE CONSTRUCTION, INC. | BFD | C | 05/03/2017 | Drain ok // daylight to south side | LINDSEY | LINDSEY | | BFD | C | 5494583 |
ELEVATE CONSTRUCTION, INC. | BFI | C | 05/02/2017 | R10 installed at walk out area of basement | ERICR | ERICR | | BFI | C | 5493548 |
ELEVATE CONSTRUCTION, INC. | BSP | P | 04/18/2017 | updated soils report uploaded | LINDSEY | LINDSEY | | BSP | P | 5478575 |
ELEVATE CONSTRUCTION, INC. | BFN | P | 04/06/2017 | Open hole on file | LINDSEY | LINDSEY | | BFN | P | 5466058 |
ELEVATE CONSTRUCTION, INC. | BFN | P | 04/03/2017 | received stamped open hole // main foundation ok to pour // need splice for deleting front section // have not inspected pads or retaining wall at this time | LINDSEY | LINDSEY | | BFN | P | 5463410 |
ELEVATE CONSTRUCTION, INC. | BFT | P | 03/02/2017 | foundation design on file // need stamped copy of soils and open hole // site verified field copy for bearing // 2400 psf // drain usable // pour at own risk | LINDSEY | LINDSEY | | BFT | P | 5429540 |
ATOMIC ELECTRIC | E= | C | 01/11/2018 | | JOHNN | JOHNN | | E= | C | 5735316 |
ATOMIC ELECTRIC | E= | P | 01/02/2018 | need water in pool to test gfci,--------------sauna,ok | JOHNN | JOHNN | | E= | P | 5726353 |
ATOMIC ELECTRIC | E= | P | 12/21/2017 | corrections made, still need to look at pool and sauna, | JOHNN | JOHNN | | E= | P | 5719792 |
ATOMIC ELECTRIC | E= | R | 12/20/2017 | need afci:fireplace,washer,frig,igniter, need gfci:washer,wet bar frig,mech rm, hall bath :rev pol, oven not wired,need cb lock out, mech rm: broken switch plate, sauna: not wired, need listing, pool: not wired, clean bussing on disco,-------------------40 amp a/c,ok | JOHNN | JOHNN | | E= | R | 5718455 |
ATOMIC ELECTRIC | ES | C | 11/09/2017 | Residential Underground: 200-amp 3 Wire service, ok to set meter, new res, | JOHNN | JOHNN | | ES | C | 5680988 |
ATOMIC ELECTRIC | ES | R | 11/07/2017 | Residential Underground: bonding lug on meter nipple is loose, | JOHNN | JOHNN | | ES | R | 5678923 |
ATOMIC ELECTRIC | ER | C | 10/02/2017 | | JOHNN | JOHNN | | ER | C | 5641738 |
ATOMIC ELECTRIC | ER | R | 09/28/2017 | kitchen island: add outlet to serve counter, master bed rm: add outlet at pocket door, master bath: outlet needs to be less then 3' from sink, ok to upload pics,-----------------------------200 amp, no mcc, rev ufer, 100 amp sub in basement, | JOHNN | JOHNN | | ER | R | 5639506 |
T & N DESIGN LLC | H= | C | 12/21/2017 | | DAVIDH | DAVIDH | | H= | C | 5720693 |
T & N DESIGN LLC | H= | P | 12/20/2017 | DOOR IN BATH RM DOWNSTAIRS NEEDS SELF CLOSING HINGES GASKETS AND THRESHOLD INSTALL ALSO NO MANUEL ON W/H APPEARS NEEDS COMPLETED OUTSIDE NEED MANUEL | DAVIDH | DAVIDH | | H= | P | 5719155 |
WINTERROWD ENTERPRISES, INC | HC | C | 10/03/2017 | RELEASE METER | JEFFB | JEFFB | | HC | C | 5643424 |
WINTERROWD ENTERPRISES, INC | HI | C | 10/03/2017 | 10 LB TEST IS OK. 1 1/4" MAIN FOR THE FURNACE, WATER HEATER, RANGE , BBQ AND 2 - FIREPLACES. | JEFFB | JEFFB | | HI | C | 5643418 |
T & N DESIGN LLC | HRR | C | 09/08/2017 | FINISHED BASEMENT, A/C COIL, DIRECT VENT FURN, CONDITIONED CRAWLERS | DAVIDH | DAVIDH | | HRR | C | 5620093 |
BEACON PLUMBING, LLC | P= | C | 12/22/2017 | corrections made. | TAYLOR | TAYLOR | | P= | C | 5721313 |
BEACON PLUMBING, LLC | P= | P | 12/21/2017 | need hammer arrestor and hi- loop at dishwasher, crossed water lines at basement shower, rest ok, no irrigation, finished basement. | TAYLOR | TAYLOR | | P= | P | 5720035 |
BEACON PLUMBING, LLC | PTO | C | 09/20/2017 | NOTE : FINISHED BASEMENT , NO IRRIGATION , AAV AT KITCHEN AND BAR , VTR REST , TEMPERING AT WH , RECIRC IN | GABE | GABE | | PTO | C | 5631171 |
BEACON PLUMBING, LLC | PB | C | 05/16/2017 | H2o under footer. | ACE | ACE | | PB | C | 5507340 |