MASTER BILT HOMES, INC. | B= | C | 07/17/2017 | | SHAUN | SHAUN | | B= | C | 5566819 |
MASTER BILT HOMES, INC. | BLA | C | 05/25/2017 | | LINDSEY | LINDSEY | | BLA | C | 5517197 |
MASTER BILT HOMES, INC. | BFR | C | 05/12/2017 | | LINDSEY | LINDSEY | | BFR | C | 5504572 |
MASTER BILT HOMES, INC. | BIN | C | 05/12/2017 | | LINDSEY | LINDSEY | | BIN | C | 5504563 |
MASTER BILT HOMES, INC. | BIN | P | 05/08/2017 | Still have temporary garage doors // please recall when permanent doors are installed | LINDSEY | LINDSEY | | BIN | P | 5499000 |
MASTER BILT HOMES, INC. | BFR | P | 05/08/2017 | Other corrections made // temporary garage doors at this time | LINDSEY | LINDSEY | | BFR | P | 5498987 |
MASTER BILT HOMES, INC. | BFR | P | 05/04/2017 | Complete Foam and Firestop / Need other rough inspections completed / please provide letter for missing post at stair landing / ok to insulate | LINDSEY | LINDSEY | | BFR | P | 5496013 |
MASTER BILT HOMES, INC. | BSP | P | 05/03/2017 | (1) new 24" pier for rear deck ok | LINDSEY | LINDSEY | | BSP | P | 5494604 |
MASTER BILT HOMES, INC. | BSP | P | 04/24/2017 | front and rear porch ok | LINDSEY | LINDSEY | | BSP | P | 5484953 |
MASTER BILT HOMES, INC. | BFD | C | 03/23/2017 | | ERICR | ERICR | | BFD | C | 5454072 |
MASTER BILT HOMES, INC. | BFD | P | 03/23/2017 | photo of daylight | ERICR | ERICR | | BFD | P | 5453337 |
MASTER BILT HOMES, INC. | BFD | P | 03/22/2017 | drain observation on file / need to see daylight of drain | ERICR | ERICR | | BFD | P | 5452129 |
MASTER BILT HOMES, INC. | BFN | C | 03/22/2017 | Engineers observation Letter on file / Eufer OK / Foundation design on file / Soils report on file / | ERICR | ERICR | | BFN | C | 5452128 |
MASTER BILT HOMES, INC. | BFT | C | 03/22/2017 | Engineers observation Letter on file / Soils report on file / 2400 psf bearing open hole / drain around useable | ERICR | ERICR | | BFT | C | 5452124 |
MASTER BILT HOMES, INC. | BFT | P | 03/21/2017 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFT | P | 5451223 |
MASTER BILT HOMES, INC. | BFD | P | 03/21/2017 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFD | P | 5451224 |
MASTER BILT HOMES, INC. | BFN | P | 03/21/2017 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFN | P | 5451222 |
FIRST RATE ELECTRICAL SERVICES, INC. | E= | C | 07/07/2017 | final,ok----------------------------------prewire:hot tub,a/c | JOHNN | JOHNN | | E= | C | 5556957 |
FIRST RATE ELECTRICAL SERVICES, INC. | ES | C | 05/04/2017 | Residential Underground: 200-amp 3 Wire service, ok to set meter / -----------------------notes:200 amp:ir uer,1#10,1#6al, basement:100 amp,2#6al,14/3, | JOHNN | JOHNN | | ES | C | 5495919 |
FIRST RATE ELECTRICAL SERVICES, INC. | ER | C | 05/03/2017 | ER ok, make corrections for ES inspection | DEAN | DEAN | | ER | C | 5494732 |
FIRST RATE ELECTRICAL SERVICES, INC. | ER | R | 05/03/2017 | ufer connection is loose, everything else ,ok,did not look at panels, | JOHNN | JOHNN | | ER | R | 5494609 |
AMERINE HEATING & COOLING LLC | H= | C | 07/14/2017 | equipment change letter sent to scanning. | TAYLOR | TAYLOR | | H= | C | 5564807 |
AMERINE HEATING & COOLING LLC | H= | P | 07/07/2017 | PENDING EQUIP CHANGE LETTER FINISHED BASEMENT,LINE SET ONLY, OSA TO FURN ,W/H MEETS 50/1 | DAVIDH | DAVIDH | | H= | P | 5557637 |
AMERINE HEATING & COOLING LLC | HRR | C | 05/03/2017 | FINISHED BASEMENT, 6"OSA , LINE SET ONLY | DAVIDH | DAVIDH | | HRR | C | 5494814 |
SPRINGS GAS, INC. | HC | C | 05/03/2017 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 5494791 |
SPRINGS GAS, INC. | HI | C | 05/03/2017 | 10 LB TEST OK NOTE 1 1/4" LINE 1 FURN,W/H AND FIREPLACE | DAVIDH | DAVIDH | | HI | C | 5494763 |
JOLLY PLUMBING & HEATING INC. | P= | C | 07/07/2017 | correction made. | TAYLOR | TAYLOR | | P= | C | 5557051 |
JOLLY PLUMBING & HEATING INC. | P= | P | 07/06/2017 | pvb needs to be 1 foot above highest ground level, rest ok, finished basement ( 1 bathroom only ). | TAYLOR | TAYLOR | | P= | P | 5555937 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 05/02/2017 | NOTE : PARTIAL FINISHED BASEMENT , AAV AT ALL BASEMENT LAVS , LEFT SIDE MASTER AND HALL BATH LAV AND LAUNDRY SINK , IRRIGATION STUB . | GABE | GABE | | PTO | C | 5493574 |
JOLLY PLUMBING & HEATING INC. | PB | C | 03/16/2017 | | TAYLOR | TAYLOR | | PB | C | 5442812 |