CUVALA CONSTRUCTION, INC. | B= | C | 07/24/2018 | All other required Final inspections are complete. (This is a computer generated result) | LONNYS | LONNYS | | B= | C | 5912416 |
CUVALA CONSTRUCTION, INC. | B= | P | 07/03/2018 | picture of newal posts on file. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | LONNYS | LONNYS | | B= | P | 5891934 |
CUVALA CONSTRUCTION, INC. | B= | P | 06/28/2018 | spiral stair case handrail missing newel post at bottom of both flights / finished basement - front and rear deck -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | LONNYS | LONNYS | | B= | P | 5888181 |
CUVALA CONSTRUCTION, INC. | BIN | C | 02/08/2018 | | LONNYS | LONNYS | | BIN | C | 5761150 |
CUVALA CONSTRUCTION, INC. | BFR | C | 02/08/2018 | NEED TO REQUEST SPECIAL INSPECTION FOR SPIRAL STAIRS ONCE INSTALLED | LONNYS | LONNYS | | BFR | C | 5761142 |
CUVALA CONSTRUCTION, INC. | BLA | C | 02/06/2018 | lath OK / rear patio pads not poured at time of inspection | LONNYS | LONNYS | | BLA | C | 5758120 |
CUVALA CONSTRUCTION, INC. | BTR | C | 02/02/2018 | | LONNYS | LONNYS | | BTR | C | 5755559 |
CUVALA CONSTRUCTION, INC. | BFR | P | 02/01/2018 | need to install spiral stairs / OK to insulate | LONNYS | LONNYS | | BFR | P | 5754304 |
CUVALA CONSTRUCTION, INC. | BSP | P | 01/17/2018 | front porch posts , lid and deck framing OK / rear porch posts, lid and deck framing OK / rear cover at garage framing OK / narrow braced wall at garage OK / all ST22 A-note straps OK | LONNYS | LONNYS | | BSP | P | 5739656 |
CUVALA CONSTRUCTION, INC. | BFT | C | 11/06/2017 | Open hole received - 1500 PSF (Verified) / Engineer observation for piers and pads received | JUSTINL | JUSTINL | | BFT | C | 5676998 |
CUVALA CONSTRUCTION, INC. | BFI | C | 10/30/2017 | Changed from BIN to BFI - 2" R-10 ridged foam OK | JUSTINL | JUSTINL | | BFI | C | 5670945 |
CUVALA CONSTRUCTION, INC. | BFD | C | 10/30/2017 | Drain usable to daylight at South of foundation / Damp proofing OK | JUSTINL | JUSTINL | | BFD | C | 5670944 |
CUVALA CONSTRUCTION, INC. | BFN | C | 10/30/2017 | Engineer observation for foundation received / Eufer noted / Foundation design received - 1500 PSF | JUSTINL | JUSTINL | | BFN | C | 5670943 |
CUVALA CONSTRUCTION, INC. | BFT | P | 10/30/2017 | Engineer observation for footers received - Exterior piers will need to be inspected / Soils report received - 1500 PSF - Still need open hole / Drain usable / 5% | JUSTINL | JUSTINL | | BFT | P | 5670940 |
PORCH ELECTRIC, INC. | E= | C | 06/12/2018 | Corrections complete / | ROB | ROB | | E= | C | 5871477 |
PORCH ELECTRIC, INC. | E= | T | 06/11/2018 | PAID (REC#1506656) house locked again, no code given. | JOHNN | JOHNN | | E= | T | 5870112 |
PORCH ELECTRIC, INC. | E= | L | 06/08/2018 | no door code given | JOHNN | JOHNN | | E= | L | 5869104 |
PORCH ELECTRIC, INC. | E= | R | 06/06/2018 | Need AFCI for master bed recpts., main level hall, and smokes---AC: 30/2 in panel--MOP 35--MCA 23 / | ROB | ROB | | E= | R | 5865956 |
PORCH ELECTRIC, INC. | ES | C | 01/26/2018 | Residential Underground: 200-amp 3 Wire service, ok to set meter,new res,---------------------------100 amp sub,ok | JOHNN | JOHNN | | ES | C | 5748622 |
PORCH ELECTRIC, INC. | ER | C | 01/26/2018 | rough,ok-----------------------------rev ufer,no mcc, 100 amp sub ok, | JOHNN | JOHNN | | ER | C | 5748620 |
ARROW HAWK HEATING, LLC | H= | C | 06/05/2018 | | DAVIDH | DAVIDH | | H= | C | 5864997 |
HOGAN MECHANICAL, INC. | H= | P | 06/04/2018 | MISSING COOK TOP EXHAUST TERMINATION HOOD AND CONNECTIONS UNDER COUNTER. NOTE: FINISHED BASEMENT, DIRECT VENT BOILER, AIR HANDLER WITH FULL A/C, NO OUTSIDE AIR | BILLS | BILLS | | H= | P | 5863502 |
O.M.A.G.M., INC. | HC | C | 01/29/2018 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 5750151 |
O.M.A.G.M., INC. | HI | C | 01/29/2018 | 10 LB TEST OK NOTE 1 1/2" LINE 1 FURN,ON DEMAND W/H, BBQ,C/T AND 2 FIREPLACES | DAVIDH | DAVIDH | | HI | C | 5750142 |
ARROW HAWK HEATING, LLC | HRR | C | 01/26/2018 | AIR HANDLER AND LINE SET OK. LOOKED AT FIREPLACES AND BOILER VENT STUBBED INTO MECH RM, BATH FANS AND DRYER VENT OK. | DAVIDH | DAVIDH | | HRR | C | 5749417 |
HOGAN MECHANICAL, INC. | HWP | P | 01/23/2018 | 6/5/2018: CHANGED INSPECTION STATUS TO COMPLETE B,S, 65LB TEST OK (MAIN FLOOR AND TOWER),, OK TO COVER. CONCENTRIC BOILER VENT PIPING ON MAIN LEVEL OK. | BILLS | BILLS | | HWP | P | 5744745 |
HOGAN MECHANICAL, INC. | HWP | P | 11/17/2017 | 65 LB TEST OK BASEMENT | DAVIDH | DAVIDH | | HWP | P | 5688854 |
HOGAN MECHANICAL, INC. | P= | C | 06/06/2018 | Corrections made | SHANEN | SHANEN | | P= | C | 5866117 |
HOGAN MECHANICAL, INC. | P= | P | 06/04/2018 | expansion tank is not properly suppoted against wall, irrigation not complete, install trap guard in laundry room, shower heads in master and main baths are loose in wall.rest o.k | JOEL | JOEL | | P= | P | 5863803 |
HOGAN MECHANICAL, INC. | PTO | C | 01/24/2018 | corrections made. | TAYLOR | TAYLOR | | PTO | C | 5746139 |
HOGAN MECHANICAL, INC. | PTO | P | 01/23/2018 | low test DWV at laundry room, s- trap at guest bath shower, rest ok, finished basement, aav's at upstairs bar sink and lav at east bathroom. | TAYLOR | TAYLOR | | PTO | P | 5744913 |
HOGAN MECHANICAL, INC. | PB | C | 11/13/2017 | | TAYLOR | TAYLOR | | PB | C | 5682385 |
MORNING STAR ELEVATOR, LLC. | V= | C | 06/20/2018 | ELEVATOR COMPLETE SEE PERMIT L42103 | ERIC | ERIC | | V= | C | 5880319 |