HAMMER HOMES, INC. | B= | C | 09/25/2019 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 6347422 | HAMMER HOMES, INC. | B= | P | 09/20/2019 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | NICK | NICK | | B= | P | 6343054 | HAMMER HOMES, INC. | BIN | C | 03/07/2019 | Thermal in walls & roof OK - batts installed in basement and some areas of main level, spray foam applied to roof and most of main level, reviewed installer certificate and ES Reports onsite | RICHB | RICHB | | BIN | C | 6127033 | HAMMER HOMES, INC. | BFR | C | 03/07/2019 | Truss repair OK per engineering / framing complete - all other Roughs complete | RICHB | RICHB | | BFR | C | 6127029 | HAMMER HOMES, INC. | BFR | P | 03/07/2019 | Engineered truss fix received - a follow-up inspection is scheduled for later today | RICHB | RICHB | | BFR | P | 6126261 | HAMMER HOMES, INC. | BTR | C | 03/06/2019 | Battens, flashing & underlayment for Boral tile roof OK | RICHB | RICHB | | BTR | C | 6126028 | HAMMER HOMES, INC. | BTR | R | 03/04/2019 | Unable to inspect due to snow cover on roof | RICHB | RICHB | | BTR | R | 6123448 | HAMMER HOMES, INC. | BFR | P | 02/27/2019 | Need truss fix for H25 (broken vertical web member near middle) - all other trusses OK per plans & engineering / rest of framing including rear deck OK / discussed BTR inspection and flashing overlap with stucco | RICHB | RICHB | | BFR | P | 6119084 | HAMMER HOMES, INC. | BLA | C | 02/27/2019 | Lath OK | RICHB | RICHB | | BLA | C | 6119076 | HAMMER HOMES, INC. | BFR | P | 02/26/2019 | Engineering received for trusses & beam repair / discussed BFR, BLA and BTR inspections | RICHB | RICHB | | BFR | P | 6117460 | HAMMER HOMES, INC. | BSP | P | 01/16/2019 | Portal walls OK / rear deck & cover posts OK / rear strapping OK | RICHB | RICHB | | BSP | P | 6079893 | HAMMER HOMES, INC. | BFN | C | 11/28/2018 | Foundation wall observation received - ufer noted | RICHB | RICHB | | BFN | C | 6036022 | HAMMER HOMES, INC. | BFT | C | 11/28/2018 | Footing observation received | RICHB | RICHB | | BFT | C | 6036021 | HAMMER HOMES, INC. | BFT | P | 11/27/2018 | Open Hole received - 2400 psf, drain usable space, floating framing at slabs // need foundation observations | RICHB | RICHB | | BFT | P | 6034636 | HAMMER HOMES, INC. | BFI | P | 11/26/2018 | Changed inspection from BIN to BFI / 2" R-10 vertical 2' OK at rear / need to complete BFT & BFN | RICHB | RICHB | | BFI | P | 6033659 | HAMMER HOMES, INC. | BFD | P | 11/26/2018 | Drain (usable) OK to daylight at rear / waterproofing on foundation OK / need to complete BFT & BFN | RICHB | RICHB | | BFD | P | 6033657 | HAMMER HOMES, INC. | BFN | R | 11/26/2018 | Waterproofing was called in as a BFN - this is inspected under the BFD inspection / need Open Hole and third party observation for all foundation elements (including ufer) | RICHB | RICHB | | BFN | R | 6033654 | HAMMER HOMES, INC. | BFT | P | 10/09/2018 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFT | P | 5990277 | HAMMER HOMES, INC. | BFN | P | 10/09/2018 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFN | P | 5990276 | DUKES ELECTRIC, INC | E= | C | 08/05/2019 | 2--a/c's, east and west--both have 30 amp breakers | GARYL | GARYL | | E= | C | 6288579 | DUKES ELECTRIC, INC | ER | C | 02/22/2019 | | JOHNN | JOHNN | | ER | C | 6114539 | DUKES ELECTRIC, INC | ES | C | 02/19/2019 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | JOHNN | JOHNN | | ES | C | 6110675 | DUKES ELECTRIC, INC | ER | R | 02/19/2019 | need nail plates above main panel, master bath rm closet doorway: framing has changed or is not complete,move switch and outlet inside wall, can not have 2 kitchens: remove 240 v stove line in bev center in basement, ------------------------------------notes: main panel:rev ufer, 3#8cu, no mcc, 100 amp sub panel in basement,ok, no mcc,#8cu, no floor heat | JOHNN | JOHNN | | ER | R | 6110663 | MILLER HEATING & AIR CONDITIONING, INC. | H= | C | 08/07/2019 | HI/LO transfer see image | DAVIDH | DAVIDH | | H= | C | 6291231 | MILLER HEATING & AIR CONDITIONING, INC. | H= | P | 08/05/2019 | mechanical room lacks combustion air will accept pictures of repair note finished basement, a/c x 2, direct vent furnace x2 | DAVIDH | DAVIDH | | H= | P | 6289049 | MILLER HEATING & AIR CONDITIONING, INC. | HC | C | 02/21/2019 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 6112654 | MILLER HEATING & AIR CONDITIONING, INC. | HRR | C | 02/21/2019 | corrections made finished basement note 6"osa x 2 | DAVIDH | DAVIDH | | HRR | C | 6112652 | MILLER HEATING & AIR CONDITIONING, INC. | HRR | P | 02/19/2019 | need to know what cfm of kitchen hood is exhausting (12" exhaust hood?) 6"osa to r/a of furnace not sealed ,also 6"s/a run basement unfinished area support strap broken note a/c x 2 line set and coil , direct vent furnaces, 6"osa x 2 | DAVIDH | DAVIDH | | HRR | P | 6110987 | PLATINUM PLUMBING INC | HI | C | 02/05/2019 | 10 lb test ok note 1 1/2 " main cook top,2 fireplaces,2 bbqs,2 furnaces, 2 water heaters , 2 dryers and garage heater | DAVIDH | DAVIDH | | HI | C | 6097617 | B & L PLUMBING, INC. | P= | C | 08/30/2019 | see images | JOHNS | JOHNS | | P= | C | 6319724 | B & L PLUMBING, INC. | P= | P | 08/27/2019 | need trap guard @ kitchen pantry drain, leak @ lav @ bsmnt bath (left of stairs), uploaded image to complete, rest ok. NOTE: finished bsmnt, pvb ok, tempering @ mech (above water htr in floor joists) | JOHNS | JOHNS | | P= | P | 6315231 | B & L PLUMBING, INC. | PTO | C | 02/06/2019 | Corrections made. | SAMH | SAMH | | PTO | C | 6098960 | B & L PLUMBING, INC. | PTO | P | 02/05/2019 | Secure both basement flanges, Secure basement tub, Need nail protection at bar DWV. Rest OK. | SAMH | SAMH | | PTO | P | 6098432 | B & L PLUMBING, INC. | PTO | P | 02/04/2019 | low test kitchen sink dwv, need nail protection on vent between master shower and tub, hall bath lav, and basement bathroom LH side lav, need to anchor both basement floor flanges, need to see basement lav drain reconnected, rest ok note: finished basement(2 bathroom finished), irrigation stub, aav @ wet bar | JOSEPHD | JOSEPHD | | PTO | P | 6097304 | B & L PLUMBING, INC. | PB | C | 12/06/2018 | | MALYNDA | MALYNDA | | PB | C | 6045418 | HAMMER HOMES, INC. | XBS | T | 01/10/2019 | PAID (REC#1569796) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise foundation design and framing to revise crawlspace to basement. | MICHAELA | MICHAELA | | XBS | T | 6074158 |
|
|