Required Departments: 6
|
|
|
Log Entries: 15
|
|
Electrical | Original | A | 2/15/2018 | BERTHA | BERTHA | Per SLE | | Electrical | 1038120 | Electrical | Original | D | 11/7/2017 | SHELBY | SHELBY | Pending internal discussion with CSU
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1010982 | Scanned/Finished Bin | Original | / | 11/6/2017 | | JESSICAM | Location = Scanned/Finished Bin by JESSICAM | | Scanned/Finished Bin | 1010554 | To Be Scanned Bin | Original | / | 11/6/2017 | | RITA | Location = To Be Scanned Bin by RITA | | To Be Scanned Bin | 1010330 | Water Division | Original | N | 11/6/2017 | SHELBY | SHELBY | | | Water Division | 1010315 | Waste Water Div | Original | N | 11/6/2017 | SHELBY | SHELBY | | | Waste Water Div | 1010314 | Hazmat | Original | N | 11/6/2017 | SHELBY | SHELBY | | | Hazmat | 1010313 | CO Springs Fire | Original | N | 11/6/2017 | SHELBY | SHELBY | | | CO Springs Fire | 1010312 | Plumbing | Original | N | 11/6/2017 | SHELBY | SHELBY | | | Plumbing | 1010311 | Mechanical | Original | N | 11/6/2017 | SHELBY | SHELBY | | | Mechanical | 1010310 | Electrical | Original | A | 11/6/2017 | SHELBY | SHELBY | | | Electrical | 1010309 | Construction | Original | N | 11/6/2017 | SHELBY | SHELBY | | | Construction | 1010308 | Out to Review | Original | / | 11/6/2017 | BRENT | BRENT | | | Out to Review | 1010282 | Enumeration | Original | A | 11/6/2017 | BRENT | BRENT | | | Enumeration | 1010281 | Floodplain | Original | N | 11/6/2017 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6434207008) | | Floodplain | 1010269 |
|
| |
|