Out to Review | Splice 4/27/2018 | / | 2/11/2020 | DBURGESS | DBURGESS | Picked up by Jim Zarich w/ Charis Bible College | | Out to Review | 1285399 |
Woodland Park | Splice 4/27/2018 | / | 2/4/2020 | | DBURGESS | Location = Woodland Park by DBURGESS | | Woodland Park | 1283049 |
Woodland Park Bin | Splice 4/27/2018 | / | 2/3/2020 | | SCANNING | Location = Woodland Park Bin by SCANNING - Plan is EXPIRED, Sent to Woodland Park. | | Woodland Park Bin | 1282528 |
- Not Set - | Splice 4/27/2018 | / | 10/11/2019 | SCANNING | SCANNING | EXPIRED PLAN - Plan is over 365 days old and is expired. IF not picked up by 10/31/19 plan will be disposed of. Plan has been scanned into the permit for record note by JLANE | | - Not Set - | 1245104 |
Scanned/Finished Bin | Splice 4/27/2018 | / | 5/14/2018 | | SCANNING | Location = Scanned/Finished Bin by SCANNING | | Scanned/Finished Bin | 1068112 |
To Be Scanned Bin | Splice 4/27/2018 | / | 5/14/2018 | | SCANNING | Location = To Be Scanned Bin by SCANNING | | To Be Scanned Bin | 1068000 |
WP Fire | Splice 4/27/2018 | A | 5/10/2018 | CSFIRE | CSFIRE | Submitted By: Withee, Doreen E (see full review) | csfdit | WP Fire | 1067150 |
Fire | Splice 4/27/2018 | / | 5/2/2018 | | SCANNING | Location = Fire by SCANNING | | Fire | 1063852 |
Plan Coordinator | Splice 4/27/2018 | / | 5/2/2018 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 1063804 |
Plumbing | Splice 4/27/2018 | A | 5/2/2018 | TCRIPPEN | TCRIPPEN | see clouded notes on plumbing pages re routing of sprinkler pipe and plumbing for server room, relocation of drinking fountains, re rote condensate line see plans for all new work | | Plumbing | 1063802 |
Plumbing | Splice 4/27/2018 | / | 5/2/2018 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 1063781 |
Plumbing | Splice 4/27/2018 | / | 5/1/2018 | | SCANNING | Location = Plumbing by SCANNING | | Plumbing | 1063696 |
Plan Coordinator | Splice 4/27/2018 | / | 5/1/2018 | | JUSTINC | Location = Plan Coordinator by JUSTINC | | Plan Coordinator | 1063675 |
Mechanical | Splice 4/27/2018 | A | 5/1/2018 | JUSTINC | JUSTINC | Revised CRAC unit schedule and layout revisions | | Mechanical | 1063674 |
Mechanical | Splice 4/27/2018 | / | 5/1/2018 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Mechanical | 1063504 |
Mechanical | Splice 4/27/2018 | / | 5/1/2018 | | SCANNING | Location = Mechanical by SCANNING | | Mechanical | 1063200 |
Plan Coordinator | Splice 4/27/2018 | / | 4/30/2018 | | BERTHA | Location = Plan Coordinator by BERTHA | | Plan Coordinator | 1063156 |
Electrical | Splice 4/27/2018 | A | 4/30/2018 | BERTHA | BERTHA | Numerous power and lighting revisions. Updated panel schedules. | | Electrical | 1063154 |
Electrical | Splice 4/27/2018 | / | 4/27/2018 | | SCANNING | Location = Electrical by SCANNING | | Electrical | 1062667 |
Plan Coordinator | Splice 4/27/2018 | / | 4/27/2018 | | MICHAELA | Location = Plan Coordinator by MICHAELA | | Plan Coordinator | 1062655 |
Construction | Splice 4/27/2018 | N | 4/27/2018 | MICHAELA | MICHAELA | | | Construction | 1062654 |
Construction | Splice 4/27/2018 | / | 4/27/2018 | MICHAELA | MICHAELA | In Current Review by MICHAELA | | Construction | 1062650 |
Construction | Splice 4/27/2018 | / | 4/27/2018 | | GITA | Location = Construction by GITA | | Construction | 1062644 |
Out to Review | Original | / | 4/2/2018 | RITA | RITA | Ben 719-221-9758 | | Out to Review | 1052773 |
Scanned/Finished Bin | Original | / | 4/2/2018 | | SCANNING | Location = Scanned/Finished Bin by SCANNING | | Scanned/Finished Bin | 1052725 |
To Be Scanned Bin | Original | / | 3/30/2018 | | JANE | Location = To Be Scanned Bin by JANE | | To Be Scanned Bin | 1052535 |
Waste Water Div | Original | A | 3/30/2018 | DBURGESS | DBURGESS | Per SWR on 3/30/2018 | | Waste Water Div | 1052520 |
Water Division | Original | A | 3/30/2018 | DBURGESS | DBURGESS | Per SWR on 3/30/2018 | | Water Division | 1052519 |
WP Zoning | Original | A | 3/30/2018 | DBURGESS | DBURGESS | Per SWR on 3/30/2018 | | WP Zoning | 1052517 |
WP Floodplain | Original | N | 3/30/2018 | DBURGESS | DBURGESS | Per SWR on 3/30/2018 | | WP Floodplain | 1052516 |
WP Enumeration | Original | A | 3/30/2018 | DBURGESS | DBURGESS | Per SWR on 3/30/2018 | | WP Enumeration | 1052515 |
Woodland Park | Original | / | 3/29/2018 | | DBURGESS | Location = Woodland Park by DBURGESS | | Woodland Park | 1052098 |
Woodland Park Bin | Original | / | 3/28/2018 | | SCANNING | Location = Woodland Park Bin by SCANNING | | Woodland Park Bin | 1051255 |
Plan Coordinator | Original | / | 3/28/2018 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 1051187 |
Electrical | Original | A | 3/28/2018 | SHELBY | SHELBY | | | Electrical | 1051186 |
Electrical | Original | / | 3/26/2018 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 1050386 |
Electrical | Original | / | 3/26/2018 | | GITA | Location = Electrical by GITA | | Electrical | 1050379 |
Resubmittal 2 | Original | / | 3/26/2018 | GITA | GITA | Resubmittal #2 ELECTRICAL ONLY- DONT SEND TO WP PLEASE. MIKE WILL PICK UP FROM FB. | | Resubmittal 2 | 1050375 |
Construction | Original | A | 3/26/2018 | LBENNETT | LBENNETT | | | Construction | 1050372 |
Out to Review | Original | / | 3/22/2018 | DBURGESS | DBURGESS | Picked up by Mike Richardson w/ HB&A for revs. | | Out to Review | 1049643 |
Woodland Park | Original | / | 3/22/2018 | | DBURGESS | Location = Woodland Park by DBURGESS | | Woodland Park | 1049568 |
Woodland Park Bin | Original | / | 3/21/2018 | | SCANNING | Location = Woodland Park Bin by SCANNING | | Woodland Park Bin | 1049319 |
Plan Coordinator | Original | / | 3/21/2018 | | BERTHA | Location = Plan Coordinator by BERTHA | | Plan Coordinator | 1049262 |
Electrical | Original | D | 3/21/2018 | BERTHA | BERTHA | 1. Provide location of all electrical equipment. (New TSTUDIO transformer, etc.) 2. Supply Side Bonding Jumper (TSTUDIO transformer) undersized. 3. Homogenize one-line and Fault Current Calculations - FC Calculations do not match points indicated on one-line. 4. Provide volt amps on all branch circuits and calculated load of panel for all panels utilized/revised in this scope. (L1D7, L2D3, L3D6, R3D6, R2D5, R4D5, etc.)
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1049261 |
Electrical | Original | / | 3/15/2018 | BERTHA | BERTHA | In Current Review by BERTHA | | Electrical | 1047573 |
Electrical | Original | / | 3/15/2018 | | SCANNING | Location = Electrical by SCANNING | | Electrical | 1047263 |
Plan Coordinator | Original | / | 3/15/2018 | | MICHAELA | Location = Plan Coordinator by MICHAELA | | Plan Coordinator | 1047234 |
Construction | Original | D | 3/15/2018 | MICHAELA | MICHAELA | Missing Code Study form Show sinks as accessible at kitchen and break room Walk-through OK (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1047233 |
Construction | Original | / | 3/15/2018 | MICHAEL | MICHAEL | In Current Review by MICHAEL | | Construction | 1047217 |
Construction | Original | / | 3/14/2018 | | RITA | Location = Construction by RITA | | Construction | 1047082 |
Resubmittal 1 | Original | / | 3/14/2018 | RITA | RITA | Resubmittal #1 | | Resubmittal 1 | 1047081 |
Out to Review | Original | / | 3/7/2018 | DBURGESS | DBURGESS | Mike Richardson with HB&A, Architects & Planning picked up the plans to take down to PPRBD himself. | | Out to Review | 1044278 |
WP Fire | Original | A | 2/6/2018 | CSFIRE | CSFIRE | FEES DUE TO CSFD CONSTRUCTION SERVICES $766.60; REFERENCE REVIEW REPORT FOR INSPECTION REQUIREMENTS (see full review) | csfdit | WP Fire | 1035334 |
Fire | Original | / | 2/2/2018 | | SCANNING | Location = Fire by SCANNING | | Fire | 1034387 |
Plan Coordinator | Original | / | 2/2/2018 | | JUSTINC | Location = Plan Coordinator by JUSTINC | | Plan Coordinator | 1034366 |
Mechanical | Original | A | 2/2/2018 | JUSTINC | JUSTINC | | | Mechanical | 1034365 |
Mechanical | Original | / | 2/1/2018 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Mechanical | 1034013 |
Mechanical | Original | / | 1/31/2018 | | SCANNING | Location = Mechanical by SCANNING | | Mechanical | 1033424 |
Electrical | Original | D | 1/31/2018 | SHELBY | SHELBY | Review stopped. There is no one line showing new panels. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1033344 |
Electrical | Original | / | 1/30/2018 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 1033211 |
Plumbing | Original | A | 1/29/2018 | TCRIPPEN | TCRIPPEN | okay, | | Plumbing | 1032462 |
Electrical | Original | / | 1/29/2018 | | SCANNING | Location = Electrical by SCANNING | | Electrical | 1032371 |
Plan Coordinator | Original | / | 1/29/2018 | | MICHAELA | Location = Plan Coordinator by MICHAELA | | Plan Coordinator | 1032346 |
Construction | Original | D | 1/29/2018 | MICHAELA | MICHAELA | Rename levels according to the IBC, stories and mezzanines Provide a section through the structure clarifying mezzanine vs. stories Revise occupant load Provide floor plan of entire structure Common path of travel is exceeded Clarify use of S-1 area - egress is not permitted through storage rooms Provide wall type for stair infill No walk-through
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1032345 |
Construction | Original | / | 1/24/2018 | MICHAELA | MICHAELA | In Current Review by MICHAELA | | Construction | 1031352 |
Construction | Original | / | 1/19/2018 | | JANE | Location = Construction by JANE | | Construction | 1030030 |