Scanned/Finished Bin | 9/27/18 | / | 9/28/2018 | | SCANNING | Location = Scanned/Finished Bin by SCANNING | | Scanned/Finished Bin | 1114706 |
Construction | 9/27/18 | N | 9/27/2018 | MICHAELA | MICHAELA | | | Construction | 1114490 |
Electrical | 9/27/18 | A | 9/27/2018 | SHELBY | SHELBY | | | Electrical | 1114467 |
Out to Review | 9/27/18 | / | 9/27/2018 | NELIDA | NELIDA | Travis 720-331-6381 | | Out to Review | 1114451 |
Out to Review | Original | / | 8/16/2018 | MATTHEWM | MATTHEWM | Dave Hannel | | Out to Review | 1100707 |
CSU Contract Admin. | Original | A | 6/8/2018 | CSUAPPSPRM | CSUAPPSPRM | Utility Charges and Fees billed 6/6/18. BML | bmludiker | CSU Contract Admin. | 1077817 |
Scanned/Finished Bin | Original | / | 5/21/2018 | | SCANNING | Location = Scanned/Finished Bin by SCANNING | | Scanned/Finished Bin | 1070929 |
To Be Scanned Bin | Original | / | 5/21/2018 | | SCANNING | Location = To Be Scanned Bin by SCANNING | | To Be Scanned Bin | 1070907 |
Plan Coordinator | Original | / | 5/21/2018 | | SDALSING | Location = Plan Coordinator by SDALSING | | Plan Coordinator | 1070880 |
CO Springs DRE | Original | A | 5/21/2018 | SDALSING | SDALSING | Exterior warming hut and LED lighting. No minor mod needed at this time per MDS (see full review) | | CO Springs DRE | 1070879 |
Zoning/Planning | Original | / | 5/21/2018 | | SCANNING | Location = Zoning/Planning by SCANNING | | Zoning/Planning | 1070589 |
Plan Coordinator | Original | / | 5/21/2018 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 1070561 |
Electrical | Original | A | 5/21/2018 | SHELBY | SHELBY | | | Electrical | 1070560 |
Electrical | Original | / | 5/21/2018 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 1070526 |
Electrical | Original | / | 5/17/2018 | | SCANNING | Location = Electrical by SCANNING | | Electrical | 1069995 |
Plan Coordinator | Original | / | 5/17/2018 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 1069991 |
Construction | Original | A | 5/17/2018 | SHELLEY | SHELLEY | | | Construction | 1069990 |
Construction | Original | / | 5/17/2018 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction | 1069985 |
Construction | Original | / | 5/17/2018 | | MATTHEWM | Location = Construction by MATTHEWM | | Construction | 1069919 |
Resubmittal 3 | Original | / | 5/17/2018 | MATTHEWM | MATTHEWM | Resubmittal #3 | | Resubmittal 3 | 1069918 |
Finished Bin | Original | / | 5/8/2018 | | SHELLEY | Location = Finished Bin by SHELLEY | | Finished Bin | 1065998 |
Construction | Original | A | 5/8/2018 | SHELLEY | SHELLEY | See AMM on file | | Construction | 1065997 |
Construction | Original | / | 5/8/2018 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction | 1065989 |
Construction | Original | / | 5/8/2018 | | SCANNING | Location = Construction by SCANNING | | Construction | 1065988 |
Finished Bin | Original | / | 5/7/2018 | | JAY | Location = Finished Bin by JAY | | Finished Bin | 1065514 |
Construction | Original | / | 5/7/2018 | | JAY | Location = Construction by JAY for AMM Review | | Construction | 1065440 |
Finished Bin | Original | / | 5/4/2018 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1064978 |
Plan Coordinator | Original | / | 5/4/2018 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 1064927 |
Electrical | Original | D | 5/4/2018 | SHELBY | SHELBY | No changes made (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1064926 |
Electrical | Original | / | 5/4/2018 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 1064907 |
Electrical | Original | / | 5/4/2018 | | SCANNING | Location = Electrical by SCANNING | | Electrical | 1064882 |
Plan Coordinator | Original | / | 5/4/2018 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 1064847 |
Construction | Original | D | 5/4/2018 | SHELLEY | SHELLEY | No construction review until AMM request has been reviewed and approved. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1064846 |
Construction | Original | / | 5/4/2018 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction | 1064838 |
Construction | Original | / | 5/3/2018 | | MINDY | Location = Construction by MINDY | | Construction | 1064520 |
Resubmittal 2 | Original | / | 5/3/2018 | MINDY | MINDY | Resubmittal #2 | | Resubmittal 2 | 1064368 |
Finished Bin | Original | / | 4/30/2018 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1062982 |
Plan Coordinator | Original | / | 4/30/2018 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 1062969 |
Electrical | Original | D | 4/30/2018 | SHELBY | SHELBY | Comply 225.30 , 225..31, and 225.32 NEC. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1062968 |
Electrical | Original | / | 4/30/2018 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 1062866 |
Electrical | Original | / | 4/27/2018 | | SCANNING | Location = Electrical by SCANNING | | Electrical | 1062389 |
Plan Coordinator | Original | / | 4/27/2018 | | MICHAELA | Location = Plan Coordinator by MICHAELA | | Plan Coordinator | 1062264 |
Construction | Original | D | 4/27/2018 | MICHAELA | MICHAELA | The 2017 Regional Building Code has amended the 2015 IBC sec.1809.5. The amendment requires a minimum 12" thickened edge monolithic foundation under structures such as this. Either comply with the 12" foundation or submit an "Alternate Materials and Methods" request indicating a desire to use IBC section 1809.5 un-amended. Form is on the RBD website. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1062263 |
Construction | Original | / | 4/27/2018 | MICHAELA | MICHAELA | In Current Review by MICHAELA | | Construction | 1062208 |
Construction | Original | / | 4/26/2018 | | SCANNING | Location = Construction by SCANNING | | Construction | 1062009 |
Plan Coordinator | Original | / | 4/26/2018 | | BRENT | Location = Plan Coordinator by BRENT | | Plan Coordinator | 1061949 |
Enumeration | Original | A | 4/26/2018 | BRENT | BRENT | | | Enumeration | 1061948 |
Enumeration | Original | / | 4/25/2018 | | RITA | Location = Enumeration by RITA | | Enumeration | 1061604 |
Resubmittal 1 | Original | / | 4/25/2018 | RITA | RITA | Resubmittal #1 | | Resubmittal 1 | 1061591 |
Out to Review | Original | / | 4/19/2018 | NELIDA | NELIDA | Chad 303-956-4445 | | Out to Review | 1059335 |
Finished Bin | Original | / | 2/12/2018 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1036910 |
Health Dept. | Original | N | 2/12/2018 | HEALTHDEPT | HEALTHDEPT | Not applicable | rnielsen | Health Dept. | 1036883 |
Health Dept. | Original | / | 2/12/2018 | | SCANNING | Location = Health Dept. by SCANNING | | Health Dept. | 1036591 |
Hazmat | Original | N | 2/9/2018 | CSFIRE | CSFIRE | | rpeterson | Hazmat | 1036462 |
Out to Review | Original | / | 2/9/2018 | | CSFIRE | Location = Out to Review by CSFIRE | rpeterson | Out to Review | 1036461 |
CO Springs Fire | Original | N | 2/9/2018 | CSFIRE | CSFIRE | Submitted By: Peterson, Roland Thomas | csfdit | CO Springs Fire | 1036460 |
Fire | Original | / | 2/9/2018 | | SDALSING | Location = Fire by SDALSING | | Fire | 1036192 |
CO Springs DRE | Original | A | 2/9/2018 | SDALSING | SDALSING | Exterior warming hut and LED lighting. No minor mod needed at this time per MDS (see full review) | | CO Springs DRE | 1036191 |
Zoning/Planning | Original | / | 2/2/2018 | | SCANNING | Location = Zoning/Planning by SCANNING | | Zoning/Planning | 1034482 |
City Engr | Original | N | 2/2/2018 | CSENGINEER | CSENGINEER | Plan set routed to RBD. jad | csengineer | City Engr | 1034433 |
Water Division | Original | N | 2/2/2018 | CSUREVIEW | CSUREVIEW | No new water required for this structure. | ajuvera | Water Division | 1034216 |
Waste Water Div | Original | N | 2/2/2018 | CSUREVIEW | CSUREVIEW | No new wastewater required for this structure. | ajuvera | Waste Water Div | 1034214 |
Gas/Elec. Utils | Original | A | 2/2/2018 | CSUREVIEW | CSUREVIEW | | ajuvera | Gas/Elec. Utils | 1034209 |
CSU Utilities | Original | / | 2/1/2018 | | CSUAPPSPRM | Location = CSU Utilities by CSUAPPSPRM | lmpope | CSU Utilities | 1033990 |
CSU Contract Admin. | Original | D | 2/1/2018 | CSUAPPSPRM | CSUAPPSPRM | Requires payment of Electric Design Fee. LMP | lmpope | CSU Contract Admin. | 1033989 |
CSU Contract Admin. | Original | / | 1/31/2018 | | SCANNING | Location = CSU Contract Admin. by SCANNING | | CSU Contract Admin. | 1033527 |
Plumbing | Original | N | 1/31/2018 | TCRIPPEN | TCRIPPEN | no plumbing work issue no permit. | | Plumbing | 1033494 |
Plumbing | Original | / | 1/31/2018 | | SCANNING | Location = Plumbing by SCANNING | | Plumbing | 1033422 |
Plan Coordinator | Original | / | 1/31/2018 | | DALEH | Location = Plan Coordinator by DALEH | | Plan Coordinator | 1033354 |
Mechanical | Original | N | 1/31/2018 | DALEH | DALEH | | | Mechanical | 1033353 |
Mechanical | Original | / | 1/31/2018 | DALEH | DALEH | In Current Review by DALEH | | Mechanical | 1033336 |
Mechanical | Original | / | 1/31/2018 | | SCANNING | Location = Mechanical by SCANNING | | Mechanical | 1033216 |
Plan Coordinator | Original | / | 1/30/2018 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 1033182 |
Electrical | Original | D | 1/30/2018 | SHELBY | SHELBY | 1. For structure stamped by the state of colorado ( see construction review comments) provide one line. 2. For site built structure provide complete electrical See https://www.pprbd.org/plancheck/PLCK%20Com%20Elec%20List%202016.pdf for requirements and sheet 6 of seven for a incomplete example of missing information. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1033181 |
Electrical | Original | / | 1/29/2018 | | SCANNING | Location = Electrical by SCANNING | | Electrical | 1032619 |
Plan Coordinator | Original | / | 1/29/2018 | | MICHAELA | Location = Plan Coordinator by MICHAELA | | Plan Coordinator | 1032585 |
Construction | Original | D | 1/29/2018 | MICHAELA | MICHAELA | Provide a soils report and foundation design for this structure If structure is site built the plans need to be stamped by a Colorado licensed design professional If pre-manufactured the plans must be stamped by the State of Colorado Not a walk-through (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1032584 |
Construction | Original | / | 1/25/2018 | | SCANNING | Location = Construction by SCANNING | | Construction | 1031818 |
Plan Coordinator | Original | / | 1/25/2018 | | BRENT | Location = Plan Coordinator by BRENT | | Plan Coordinator | 1031774 |
Enumeration | Original | A | 1/25/2018 | BRENT | BRENT | Per construction, no separate address issued since this small structure uses the same electric service as the gas canopy | | Enumeration | 1031773 |
Floodplain | Original | N | 1/24/2018 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5330202008) | | Floodplain | 1031408 |