Mechanical | Splice 06/20/19 | A | 6/21/2019 | TCRIPPEN | TCRIPPEN | new splice page revised gas piping added second water heater | | Mechanical | 1205144 |
Out to Review | Splice 06/20/19 | / | 6/21/2019 | SHANEN | SHANEN | | | Out to Review | 1205117 |
Plumbing | Splice 06/20/19 | A | 6/20/2019 | SHANEN | SHANEN | Delta 5 revision adjusted water heater schedule, delta 6 revision changed to two tankless water heaters | | Plumbing | 1204958 |
Plumbing | Splice 06/20/19 | / | 6/20/2019 | | TCRIPPEN | Location = Plumbing by TCRIPPEN | | Plumbing | 1204943 |
Mechanical | Splice 06/20/19 | D | 6/20/2019 | TCRIPPEN | TCRIPPEN | revise gas piping 1/2 wont carry the load (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1204942 |
Mechanical | Splice 06/04/19 | A | 6/4/2019 | TCRIPPEN | TCRIPPEN | new splice re routed ducts, added note remove co sensor | | Mechanical | 1198356 |
Mechanical | Splice 03/15/19 | A | 3/15/2019 | JUSTINC | JUSTINC | Revised gas | | Mechanical | 1167703 |
Plumbing | Splice 03/15/19 | A | 3/15/2019 | SHANEN | SHANEN | Delta 4 revisions - Tankless water heater schedule,changed to tankless water heater, relocated mop sink and hand sink. | | Plumbing | 1167663 |
Out to Review | Splice 03/15/19 | / | 3/15/2019 | BECKYA | BECKYA | | | Out to Review | 1167630 |
Mechanical | Splice 02/19/19 | A | 2/19/2019 | JUSTINC | JUSTINC | Revised gas | | Mechanical | 1160398 |
Scanned/Finished Bin | Splice 9/17/18 | / | 11/16/2018 | | SCANNING | Location = Scanned/Finished Bin by SCANNING | | Scanned/Finished Bin | 1131878 |
To Be Scanned Bin | Splice 9/17/18 | / | 11/14/2018 | | JANE | Location = To Be Scanned Bin by JANE | | To Be Scanned Bin | 1130526 |
Health Dept. | Splice 9/17/18 | A | 11/14/2018 | HEALTHDEPT | HEALTHDEPT | Approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. | Aparikh | Health Dept. | 1130418 |
Fountain Waste Water | Splice 9/17/18 | A | 11/9/2018 | JANE | JANE | | | Fountain Waste Water | 1129103 |
Construction | Splice 9/17/18 | A | 10/2/2018 | DANM | DANM | Reconfigured kitchen and moved MAU on roof | | Construction | 1115589 |
Mechanical | Splice 9/17/18 | A | 10/2/2018 | DALEH | DALEH | re approved relocated mua unit | | Mechanical | 1115570 |
Electrical | Splice 9/17/18 | A | 9/20/2018 | SHELBY | SHELBY | | | Electrical | 1112114 |
Mechanical | Splice 9/17/18 | A | 9/20/2018 | JUSTINC | JUSTINC | | | Mechanical | 1112094 |
Out to Review | Splice 9/17/18 | / | 9/19/2018 | RITA | RITA | C?lint 719-659-6755 | | Out to Review | 1111495 |
Finished Bin | Splice 9/17/18 | / | 9/18/2018 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1111371 |
Plan Coordinator | Splice 9/17/18 | / | 9/18/2018 | | DALEH | Location = Plan Coordinator by DALEH | | Plan Coordinator | 1111321 |
Mechanical | Splice 9/17/18 | D | 9/18/2018 | DALEH | DALEH | balance schedule needs to be within 10% provide interlock schedule provide structural letter see plans for complete red lines
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1111318 |
Mechanical | Splice 9/17/18 | / | 9/18/2018 | DALEH | DALEH | In Current Review by DALEH | | Mechanical | 1110983 |
Mechanical | Splice 9/17/18 | / | 9/17/2018 | | RITA | Location = Mechanical by RITA For Dale | | Mechanical | 1110833 |
Electrical | Splice 9/17/18 | D | 9/17/2018 | BERTHA | BERTHA | 1. Remove parallel neutral (gnd) from service conductor. 2. Provide all conductor size, type and quantity (disconnect to House Panel). 3. Comply 210.25(B) - common area receptacles. 4. Comply 240.24(B) - patio lighting (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1110813 |
Plumbing | Splice 9/17/18 | A | 9/17/2018 | TCRIPPEN | TCRIPPEN | New splice page adding outside grease trap | | Plumbing | 1110773 |
Fountain Zoning | Original | A | 8/13/2018 | RITA | RITA | per Gaby 05/18/18 | | Fountain Zoning | 1099234 |
Fountain Waste Water | Original | A | 8/13/2018 | RITA | RITA | per G Murray | | Fountain Waste Water | 1099231 |
Fountain Water | Original | A | 8/13/2018 | RITA | RITA | per Sandra Phelps | | Fountain Water | 1099230 |
Electrical | Original | A | 6/26/2018 | BERTHA | BERTHA | Re-approved for revisions prior to permitting. | | Electrical | 1083602 |
Fountain Fire | Original | A | 5/29/2018 | FNTNFIRE | FNTNFIRE | Fountain Fire Department OK MAS | mstanwood | Fountain Fire | 1073382 |
Health Dept. | Original | A | 5/25/2018 | HEALTHDEPT | HEALTHDEPT | Approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. | Aparikh | Health Dept. | 1072661 |
Plumbing | Original | A | 5/21/2018 | JUSTINC | JUSTINC | Revised before permit for additional grease interceptor and revised associated schedule | | Plumbing | 1070620 |
Electrical | Original | A | 3/13/2018 | BERTHA | BERTHA | | | Electrical | 1046049 |
Electrical | Original | D | 3/12/2018 | BERTHA | BERTHA | 1. Clearly indicate what is part of this scope of work. 2. Remove all plans that are not in this scope of work (car wash) 3. Provide conduit/wire size, type and quantity beginning at the utility transformer to include all conductors in the chain of supply for the electrical equipment in the scope of work (conductors between CT and disconnect.) 4. Comply 250.122 NEC 5. Comply 110.26(D) NEC 6. Provide footprint (site plan) showing all electrical service equipment and disconnects serving the structure (panels)
Call for consultation Bertha 719-327-2911
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1045822 |
Construction | Original | A | 3/12/2018 | LBENNETT | LBENNETT | | | Construction | 1045792 |
Mechanical | Original | A | 3/9/2018 | JUSTINC | JUSTINC | | | Mechanical | 1045277 |
Plumbing | Original | A | 3/9/2018 | TCRIPPEN | TCRIPPEN | okay | | Plumbing | 1045268 |
Out to Review | Original | / | 3/2/2018 | MATTHEWM | MATTHEWM | Clint Darnell 719 659 6755 | | Out to Review | 1042696 |
Finished Bin | Original | / | 3/1/2018 | | SCANNING | Location = Finished Bin by SCANNING | | Finished Bin | 1042364 |
Health Dept. | Original | D | 3/1/2018 | HEALTHDEPT | HEALTHDEPT | Retail food establishment plan review required. Information and application may be accessed online at https://www.elpasocountyhealth.org/service/retail-food-establishment-licensing-0 For questions contact Environmental Health at 719-578-3199 option 3. | Aparikh | Health Dept. | 1042293 |
Health Dept. | Original | / | 2/27/2018 | | SCANNING | Location = Health Dept. by SCANNING | | Health Dept. | 1041286 |
Plan Coordinator | Original | / | 2/27/2018 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 1041188 |
Plumbing | Original | D | 2/27/2018 | TCRIPPEN | TCRIPPEN | see red lines for water pipe analysis data and fix, show vent sizes, add more sizes to water lines, future work not reviewed add water meter detail add detail for water heater.where is WH 2 , (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plumbing | 1041187 |
Plumbing | Original | / | 2/27/2018 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 1041072 |
Plumbing | Original | / | 2/26/2018 | | SCANNING | Location = Plumbing by SCANNING | | Plumbing | 1040966 |
Plan Coordinator | Original | / | 2/26/2018 | | DALEH | Location = Plan Coordinator by DALEH | | Plan Coordinator | 1040848 |
Mechanical | Original | D | 2/26/2018 | DALEH | DALEH | remove sheet M-2.1 see M0.1 fo red lines to ventilation schedule and equipment schedules see M1.1 for notes,,,co2 tanks?? see M2.1 captive air drawing see plans for complete red lines return red lines (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1040847 |
Mechanical | Original | / | 2/26/2018 | DALEH | DALEH | In Current Review by DALEH | | Mechanical | 1040826 |
Mechanical | Original | / | 2/22/2018 | | SCANNING | Location = Mechanical by SCANNING | | Mechanical | 1040100 |
Plan Coordinator | Original | / | 2/22/2018 | | BERTHA | Location = Plan Coordinator by BERTHA | | Plan Coordinator | 1040087 |
Electrical | Original | D | 2/22/2018 | BERTHA | BERTHA | 1. Homogenize one-line and panel schedules (indicate all panels/panel sections) 2. Provide all panel schedules with volt amps on all branch circuits and calculated load of panel 3. Provide location of EPO to scale. 4. Provide location of all required seal-off. 5. Provide extent of classified area around dispensers and vents. 6. Comply 514.11(A) 7. Comply 514.11(B)
Complete re-review necessary.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1040086 |
Electrical | Original | / | 2/21/2018 | BERTHA | BERTHA | In Current Review by BERTHA | | Electrical | 1039718 |
Electrical | Original | / | 2/20/2018 | | SCANNING | Location = Electrical by SCANNING | | Electrical | 1039123 |
Plan Coordinator | Original | / | 2/20/2018 | | DANM | Location = Plan Coordinator by DANM | | Plan Coordinator | 1039107 |
Construction | Original | D | 2/20/2018 | DANM | DANM | Reference attached Soils Report and soil bearing capacity on Sheet S0.1 Walk-through review OK (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1039106 |
Construction | Original | / | 2/20/2018 | | DANM | Location = Construction by DANM | | Construction | 1038916 |
Out to Review | Original | / | 2/16/2018 | AMY | AMY | | | Out to Review | 1038669 |
Enumeration | Original | A | 2/16/2018 | AMY | AMY | SINGLE ADDRESS FOR WHAT WAS TO BE A CORE & SHELL WITH INTERIOR FINISH PERMITS LATER. THE ENTIRE BUILDING WILL BE BUILT WITH AN INTERIOR FINISH ON 8005 FOUNTAIN MESA ROAD. 8017 FOUNTAIN MESA ROAD TO FOLLOW WITH AN INTERIOR FINISH SEPARATLY | | Enumeration | 1038668 |
Construction | Original | / | 2/16/2018 | DANM | DANM | In Current Review by DANM | | Construction | 1038601 |
Construction | Original | / | 2/12/2018 | | SCANNING | Location = Construction by SCANNING | | Construction | 1036621 |
Plan Coordinator | Original | / | 2/12/2018 | | AMY | Location = Plan Coordinator by AMY | | Plan Coordinator | 1036600 |
Enumeration | Original | A | 2/12/2018 | AMY | AMY | CORE & SHELL PLAN MUST BE WITH THE RANGE OF ADDRESSING 8005-8017 FOUNTAIN MESA RD. INTERIOR FINISH WILL BE WITH SINGLE ADDRESS. | | Enumeration | 1036599 |
Enumeration | Original | / | 2/12/2018 | AMY | AMY | In Current Review by AMY | | Enumeration | 1036593 |
Floodplain | Original | N | 2/8/2018 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5529310043) | | Floodplain | 1035845 |