Out to Review | Original | / | 7/31/2015 | NELIDA | NELIDA | Mike Daly 719-382-7575 | | Out to Review | 804289 |
Finished Bin | Original | / | 5/1/2015 | | KENYATTA | Location = Finished Bin by KENYATTA | | Finished Bin | 781240 |
Plan Coordinator | Original | / | 5/1/2015 | | TCRIPPEN | Location = Plan Coordinator by TCRIPPEN | | Plan Coordinator | 781185 |
Plumbing | Original | D | 5/1/2015 | TCRIPPEN | TCRIPPEN | Provide more details of the 4 inch drain waste line show connection to the sanitary waste line. show more details of the 1.5 potable water line. vents required for floor drains. site plan with utility`s ? | | Plumbing | 781184 |
Plumbing | Original | / | 5/1/2015 | | KENYATTA | Location = Plumbing by KENYATTA | | Plumbing | 781117 |
Plan Coordinator | Original | / | 5/1/2015 | | RUSSELL | Location = Plan Coordinator by RUSSELL | | Plan Coordinator | 781097 |
Mechanical | Original | D | 5/1/2015 | RUSSELL | RUSSELL | Mechanical plan, sheet WF-06?, is this a mechanical plan or a plumbing plan, are there any mechanical pieces of equipment, ie: boilers, furnaces, unit heaters, etc, or are all the pieces of equipment plumbing items? | | Mechanical | 781096 |
Mechanical | Original | / | 4/30/2015 | RUSSELL | RUSSELL | In Current Review by RUSSELL | | Mechanical | 780846 |
Mechanical | Original | / | 4/30/2015 | | RITA | Location = Mechanical by RITA | | Mechanical | 780795 |
Plan Coordinator | Original | / | 4/30/2015 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 780755 |
Electrical | Original | D | 4/30/2015 | SHELBY | SHELBY | 1. Provide electrical ( see check list at pprbd.org or call 719 327 2974). 2. Include pool bonding per 680.26 NEC. | | Electrical | 780754 |
Electrical | Original | / | 4/30/2015 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 780659 |
Electrical | Original | / | 4/28/2015 | | KENYATTA | Location = Electrical by KENYATTA | | Electrical | 780085 |
Plan Coordinator | Original | / | 4/28/2015 | | JIMA | Location = Plan Coordinator by JIMA | | Plan Coordinator | 780076 |
Construction | Original | D | 4/28/2015 | JIMA | JIMA | see plans / no walk clarify scope of work , plans submitted as pump house, code study says something different / clarify type of construction on code study and plans / provide the new version of the code study form ( PPRBD.ORG ) and fill it out / provide site plan with measurements and fire separation / shape of pump house on page WF-02 not matching WF-06 / stamp soils / SEE PLANS FOR ALL NOTES /// WF-02 - WF-06 - WF-09 | | Construction | 780074 |
Construction | Original | / | 4/28/2015 | JIMA | JIMA | In Current Review by JIMA | | Construction | 779878 |
Construction | Original | / | 4/24/2015 | | KENYATTA | Location = Construction by KENYATTA | | Construction | 779347 |
Plan Coordinator | Original | / | 4/24/2015 | | AMY | Location = Plan Coordinator by AMY | | Plan Coordinator | 779327 |
Floodplain | Original | D | 4/24/2015 | AMY | AMY | show entire parcel with Floodplain overlay on lot drawn in. 100 Floodplain on the property. | | Floodplain | 779326 |
Enumeration | Original | D | 4/24/2015 | AMY | AMY | submit a site plan showing the entire parcel, show location of pump house, north arrow, access into the lot, label road name. What is the addresses to the pump house-we show no permit history. | | Enumeration | 779325 |