Required Departments: 3
|
|
|
Log Entries: 5
|
|
Electrical | Original | A | 10/13/2015 | SHELBY | SHELBY | | | Electrical | 822720 | Resubmittal 1 | Original | / | 10/13/2015 | MINDY | MINDY | Resubmittal #1 | | Resubmittal 1 | 822701 | Electrical | Original | D | 10/9/2015 | DOUG | DOUG | 1. Put one line on letterhead. 2. Show all wire sizes. 3. Show fault current available SCA and SCCR of panel and breakers. May need to coordinate with meter socket if over 10,000A 4. Show main disconnect. 5. Provide description of work on code study form. | | Electrical | 822244 | Enumeration | Original | A | 10/8/2015 | JEANNINE | JEANNINE | | | Enumeration | 821826 | Floodplain | Original | N | 10/8/2015 | JEANNINE | JEANNINE | | | Floodplain | 821825 |
|
| |
|