Scanned/Finished Bin | Omit Overhead Door From Plan | / | 5/25/2017 | | SCANNING | Location = Scanned/Finished Bin by SCANNING | | Scanned/Finished Bin | 963280 |
To Be Scanned Bin | Omit Overhead Door From Plan | / | 5/24/2017 | | SCANNING | Location = To Be Scanned Bin by SCANNING | | To Be Scanned Bin | 963242 |
Plan Coordinator | Omit Overhead Door From Plan | / | 5/24/2017 | | MICHAELA | Location = Plan Coordinator by MICHAELA | | Plan Coordinator | 963211 |
Construction | Omit Overhead Door From Plan | A | 5/24/2017 | MICHAELA | MICHAELA | Delete overhead door from scope of work | | Construction | 963210 |
Construction | Omit Overhead Door From Plan | / | 5/24/2017 | | SCANNING | Location = Construction by SCANNING | | Construction | 962785 |
Woodland Park | Omit Overhead Door From Plan | / | 5/18/2017 | | DBURGESS | Location = En route to PPRBD by Nick M. | | Woodland Park | 961457 |
WP Zoning | Omit Overhead Door From Plan | A | 5/18/2017 | DBURGESS | DBURGESS | | | WP Zoning | 961456 |
Out to Review | Original | / | 4/27/2017 | DBURGESS | DBURGESS | Picked up by Larry Fosburgh for onsite construction | | Out to Review | 955837 |
Woodland Park | Original | / | 4/27/2017 | | DBURGESS | Location = Woodland Park by DBURGESS | | Woodland Park | 955659 |
Hazmat | Original | A | 4/26/2017 | CSFIRE | CSFIRE | Plans approved. Please read approval comments. Fee paid through CSFD. (see full review) | smanning | Hazmat | 955535 |
Construction | Original | A | 4/26/2017 | SHELLEY | SHELLEY | | | Construction | 955432 |
WP Fire | Original | A | 4/26/2017 | CSFIRE | CSFIRE | | rpeterson | WP Fire | 955408 |
WP Fire | Original | D | 4/24/2017 | CSFIRE | CSFIRE | Submitted By: Taylor II, Wyman L (see full review) | csfdit | WP Fire | 954557 |
Fire | Original | / | 4/10/2017 | | MINDY | Location = Fire by MINDY | | Fire | 950887 |
Woodland Park Bin | Original | / | 4/7/2017 | | RITA | Location = Woodland Park Bin by RITA. Waiting for Woodland Park Fire to call with approval for plan. | | Woodland Park Bin | 950701 |
Water Division | Original | A | 4/7/2017 | RITA | RITA | Per SWR 04/03/17 | | Water Division | 950694 |
Waste Water Div | Original | A | 4/7/2017 | RITA | RITA | SWR 04/03/17 | | Waste Water Div | 950693 |
Electrical | Original | A | 4/7/2017 | SHELBY | SHELBY | | | Electrical | 950691 |
Mechanical | Original | A | 4/7/2017 | JUSTINC | JUSTINC | | | Mechanical | 950672 |
Plumbing | Original | A | 4/7/2017 | DALEH | DALEH | | | Plumbing | 950652 |
Out to Review | Original | / | 4/3/2017 | DBURGESS | DBURGESS | Picked up by Chuck Severance / CRS Architects. | | Out to Review | 949139 |
WP Zoning | Original | A | 4/3/2017 | DBURGESS | DBURGESS | Per Sally Riley on 3/28/2017. WP Planning & Zoning takes no exception to the existing lot line bisecting this structure. | | WP Zoning | 948913 |
WP Floodplain | Original | N | 4/3/2017 | DBURGESS | DBURGESS | | | WP Floodplain | 948912 |
Woodland Park | Original | / | 4/3/2017 | | DBURGESS | Location = Woodland Park by DBURGESS | | Woodland Park | 948911 |
WP Enumeration | Original | A | 4/3/2017 | DBURGESS | DBURGESS | | | WP Enumeration | 948910 |
Woodland Park Bin | Original | / | 3/31/2017 | | JESSICAM | Location = Woodland Park Bin by JESSICAM | | Woodland Park Bin | 948490 |
Plan Coordinator | Original | / | 3/30/2017 | | JUSTINC | Location = Plan Coordinator by JUSTINC | | Plan Coordinator | 948469 |
Mechanical | Original | D | 3/30/2017 | JUSTINC | JUSTINC | Indicate all new work with bold line weights Provide GRD schedule for all new grills and diffusers Indicate all existing equipment with (E) or something similiar
MECHANICAL REVIEW INCOMPLETE
WALK OK
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 948468 |
Mechanical | Original | / | 3/30/2017 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Mechanical | 948326 |
Mechanical | Original | / | 3/28/2017 | | MINDY | Location = Mechanical by MINDY | | Mechanical | 947250 |
Plan Coordinator | Original | / | 3/28/2017 | | SHELBY | Location = Plan Coordinator by SHELBY | | Plan Coordinator | 947142 |
Electrical | Original | D | 3/28/2017 | SHELBY | SHELBY | 1. Show all service gear on the electrical floor plan ( gutter, disconnects etc). 2. Comply ANSI 308.3.1 for counter top receptacles ( see note sheet E 2). (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 947141 |
Electrical | Original | / | 3/27/2017 | SHELBY | SHELBY | In Current Review by SHELBY | | Electrical | 947120 |
Electrical | Original | / | 3/24/2017 | | TCRIPPEN | Location = Electrical by TCRIPPEN | | Electrical | 946475 |
Plumbing | Original | D | 3/24/2017 | TCRIPPEN | TCRIPPEN | floor drain required for water meter and back flow device. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plumbing | 946474 |
Plumbing | Original | / | 3/24/2017 | TCRIPPEN | TCRIPPEN | In Current Review by TCRIPPEN | | Plumbing | 946470 |
Plumbing | Original | / | 3/24/2017 | | TCRIPPEN | Location = Plumbing by TCRIPPEN | | Plumbing | 946469 |
Electrical | Original | / | 3/23/2017 | | JLANE | Location = Electrical by JLANE | | Electrical | 946122 |
Construction | Original | D | 3/23/2017 | MICHAELA | MICHAELA | Clarify treatment of the property line between lots 16 and 17 Full change of occupancy must comply with IEBC section 912.8.2 items 1-6 Provide the cost estimate for accessibility spending under a contractors letterhead. Walk-through OK (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 946084 |
Construction | Original | / | 3/21/2017 | MICHAELA | MICHAELA | In Current Review by MICHAELA | | Construction | 945281 |
Construction | Original | / | 3/17/2017 | | RITA | Location = Construction by RITA | | Construction | 944477 |