Electrical | Original | D | 4/20/2017 | BERTHA | BERTHA | Provide one-line diagram - conduit/wire size, type and quantity beginning at the utility transformer to include all conductors in the chain of supply for the electrical equipment in the scope of work
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 953939 | Mechanical | Original | N | 4/20/2017 | DALEH | DALEH | | | Mechanical | 953913 | Construction | Original | D | 4/20/2017 | BPHILLIPS | BPHILLIPS | Need pier and tiedown detail. Revise code study to reflect current use of structure. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 953909 | Enumeration | Original | A | 4/20/2017 | BRENT | BRENT | address assigned to separate building | | Enumeration | 953857 | Floodplain | Original | N | 4/20/2017 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 953834 |
|
| |
|