Required Departments: 2
|
|
|
Log Entries: 5
|
|
Construction | Original | A | 2/12/2018 | BECKYA | BECKYA | | | Construction | 1036672 | Resubmittal 1 | Original | / | 2/12/2018 | BECKYA | BECKYA | Resubmittal #1 | | Resubmittal 1 | 1036607 | Construction | Original | D | 2/7/2018 | BECKYA | BECKYA | Please provide referenced drill logs. Piers proposed for use do not meet the requirements of the design - either use piers required by design (Ramjack) or have design modified. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1035466 | Electronic Plan | Original | / | 2/7/2018 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 1035368 | Floodplain | Original | N | 2/7/2018 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7313116022) | | Floodplain | 1035365 |
|
| |
|