Out to Review | Original | / | 4/17/2017 | MINDY | MINDY | Fred 719 660 5141 | | Out to Review | 952704 |
Finished Bin | Original | / | 4/14/2017 | | JESSICAM | Location = Finished Bin by JESSICAM | | Finished Bin | 952592 |
Plan Coordinator | Original | / | 4/14/2017 | | GSANDERS | Location = Plan Coordinator by GSANDERS | | Plan Coordinator | 952589 |
CO Springs DRE | Original | A | 4/14/2017 | GSANDERS | GSANDERS | Lot meets minimum square footage. House is now a duplex. No ADU allowed (see full review) | | CO Springs DRE | 952588 |
Zoning/Planning | Original | / | 4/13/2017 | | MINDY | Location = Zoning/Planning by MINDY | | Zoning/Planning | 952187 |
Plan Coordinator | Original | / | 4/13/2017 | | DALEH | Location = Plan Coordinator by DALEH | | Plan Coordinator | 952180 |
Mechanical | Original | D | 4/13/2017 | DALEH | DALEH | show how complying with separate heating systems from one unit to the other. cant share r/a from one dwelling unit to another (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 952179 |
Mechanical | Original | / | 4/13/2017 | DALEH | DALEH | In Current Review by DALEH | | Mechanical | 952172 |
Mechanical | Original | / | 4/13/2017 | | MINDY | Location = Mechanical by MINDY | | Mechanical | 952156 |
Plan Coordinator | Original | / | 4/13/2017 | AMY | AMY | In Current Review by AMY | | Plan Coordinator | 952155 |
Plan Coordinator | Original | / | 4/13/2017 | | SHELLEY | Location = Plan Coordinator by SHELLEY | | Plan Coordinator | 952151 |
Construction | Original | D | 4/13/2017 | SHELLEY | SHELLEY | Reconcile window sizes between plan and engineering as size stating in PE letter is not egress compliant; PE letter needs to specify if IRC or ASCE32 is being used to obtain a Frost Protected Shallow Foundation (FPSF) at new door; show full compliance with R302.3 and provide all listed assemblies; clarify if mechanical room will also serve upper unit - separation required; see plans; no walk. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 952150 |
Construction | Original | / | 4/13/2017 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Construction | 952142 |
Construction | Original | / | 4/11/2017 | | JESSICAM | Location = Construction by JESSICAM | | Construction | 951225 |
Floodplain | Original | N | 4/10/2017 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 950844 |
Floodplain | Original | N | 4/10/2017 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain | | Floodplain | 950843 |