Enumeration | Original | A | 2/28/2024 | BRIANNAM | BRIANNAM | Adding comment to extend plan track expiration. Project to be resubmitted per Alejandro Lopez w/Stone Bridge | | Enumeration | 1968970 |
CO Springs Fire | Original | A | 3/13/2023 | CSFIRE | CSFIRE | You are responsible for reviewing the APPROVAL comments found on the CSFD website as they contain important inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS! ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | jt09ff | CO Springs Fire | 1815270 |
CO Springs Fire | Original | / | 3/13/2023 | CSFIRE | CSFIRE | | jt09ff | CO Springs Fire | 1815265 |
CO Springs Fire | Original | A | 3/13/2023 | CSFIRE | CSFIRE | You are responsible for reviewing the APPROVAL comments found on the CSFD website as they contain important inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS! ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | csfdit | CO Springs Fire | 1815226 |
CO Springs DRE | Original | A | 2/27/2023 | DFOXX | DFOXX | Approved per City File No. AR DP 19-00563 | | CO Springs DRE | 1807612 |
Plumbing | Original | D | 2/27/2023 | SHANEN | SHANEN | CSU comments must be addressed. P0.02: Horizontal drainage piping shall be sloped per table 704.1. Building drains shall be sloped per table 710.1(1). P2.20, P2.21: Sanitary lines serving upper level fixtures and CD serving upper level hub drains shall not discharge through the backwater valve per section 714.1. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plumbing | 1807328 |
Zoning/Planning | Original | / | 2/24/2023 | DFOXX | DFOXX | In Current Review by DFOXX | | Zoning/Planning | 1807197 |
Health Dept. | Original | D | 2/24/2023 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3.
Series: #C148492, #C148497, #C148499 BR | brothrock | Health Dept. | 1807191 |
City Engr | Original | A | 2/24/2023 | PMORRIS | PMORRIS | | | City Engr | 1806757 |
Mechanical | Original | A | 2/24/2023 | DALEH | DALEH | | | Mechanical | 1806749 |
Electrical | Original | D | 2/24/2023 | DANIELG | DANIELG | Remove mechanical sheets from electrical plans folder. Provide electrical plans.
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1806672 |
Electronic Plan | Original | / | 2/24/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1806670 |
CSU Contract Admin. | Original | D | 2/23/2023 | CSUAPPSPRM | CSUAPPSPRM | All (5) pages of the Commercial Water Meter Sizing Form must be submitted.
Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable utility charges and fees. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees and request an estimate. CWMSF available online at:
https://www.csu.org/CSUDocuments/watermetersizingforminteractive.pdf
CZ | c.zani | CSU Contract Admin. | 1806658 |
CSU Water | Original | D | 2/23/2023 | CSUREVIEW | CSUREVIEW | Approved USP entry points for water and wastewater services do not match plumbing drawings. Please coordinate with civil engineer on entry locations and revise USP and/or plumbing drawings.
Refer to 2023 Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form. Also refer to details B4-16 through B4-22 and select an appropriate meter clearance detail to include on the plumbing plans. SSM | stefanm | CSU Water | 1806637 |
CSU Waste Water | Original | D | 2/23/2023 | CSUREVIEW | CSUREVIEW | Approved USP entry points for water and wastewater services do not match plumbing drawings. Please coordinate with civil engineer on entry locations and revise USP and/or plumbing drawings. SSM | stefanm | CSU Waste Water | 1806636 |
Gas/Elec. Utils | Original | A | 2/23/2023 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings provided with permit set. SSM | stefanm | Gas/Elec. Utils | 1806633 |
Construction | Original | A | 2/23/2023 | DANM | DANM | | | Construction | 1806583 |
Electronic Plan | Original | / | 2/23/2023 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1806382 |
Enumeration | Original | A | 2/16/2023 | AMY | AMY | | | Enumeration | 1803833 |
Electronic Plan | Original | / | 2/16/2023 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1803826 |
Resubmittal 3 | Original | / | 2/16/2023 | BECKYA | BECKYA | Resubmittal #3 | | Resubmittal 3 | 1803647 |
Plan Coordinator (Main) | Original | D | 2/9/2023 | DANM | DANM | Per request of submitter, incorrect drawings were submitted.
Disapprove all remaining departments to allow plan to be resubmitted PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plan Coordinator (Main) | 1801165 |
Enumeration | Original | A | 2/2/2023 | AMY | AMY | | | Enumeration | 1798321 |
Electronic Plan | Original | / | 2/2/2023 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1798287 |
Resubmittal 2 | Original | / | 2/2/2023 | ANDREAL | ANDREAL | Resubmittal #2 | | Resubmittal 2 | 1798271 |
City Engr | Original | A | 10/5/2022 | JDAGNILLO | JDAGNILLO | | | City Engr | 1751425 |
CO Springs Fire | Original | D | 10/4/2022 | CSFIRE | CSFIRE | Submitted by James Trimble: You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | csfdit | CO Springs Fire | 1750167 |
CO Springs DRE | Original | A | 10/3/2022 | DFOXX | DFOXX | Approved per City File No. AR DP 19-00563 | | CO Springs DRE | 1750078 |
Mechanical | Original | D | 10/3/2022 | DALEH | DALEH | Remove COM checks that don't apply to Mechanical See sheet M6.04 See sheet M5.02
Appears this is a sanitary line from trap to discharge need to show on Plumbing drawings. Condensate starts at unit and ends at indirect hub drain. Typical Revise all schedules that are not a part of this submittal Where is note 12 ?
Natural ventilation calculations need to be shown for each individual habitable space don't combine in total square footage of unit Indicate on drawings that all penetrations meet lot line separation or provide design that complies See Architectural comments on how to label this area Indicate these symbols on the legend Remove Plumbing references from Mechanical sheets Gas piping is a Mechanical review and Mechanical inspection typical See all sheets for comments PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1749551 |
CSU Contract Admin. | Original | D | 9/30/2022 | CSUAPPSPRM | CSUAPPSPRM | Requires approved Commercial Water Meter Sizing Form (CWMSF) for each building and payment of applicable utility charges and fees. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees and request an estimate. CWMSF available online at:
https://www.csu.org/CSUDocuments/watermetersizingforminteractive.pdf
CZ | c.zani | CSU Contract Admin. | 1749016 |
Zoning/Planning | Original | / | 9/30/2022 | DFOXX | DFOXX | In Current Review by DFOXX | | Zoning/Planning | 1748996 |
Electrical | Original | D | 9/30/2022 | DANIELG | DANIELG | 1) Approval pending enumerations. Multi meter services must include a list of secondary enumerated addresses on the one-line. Secondary addressing must be approved by enumerations.
2) Pending approval in construction. Accessibility Plan – this does not need to be part of the electrical drawing set.
3) Provide SCA and SCCR for MCU-1.
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1748915 |
Electronic Plan | Original | / | 9/30/2022 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1748913 |
Plumbing | Original | D | 9/30/2022 | SHANEN | SHANEN | Construction and CSU review comments must be addressed. P0.02: Reference correct code section in regards to solvent cementing - 705.10.2. P2.21: Water service sizing does not match referenced civil drawings. P4.04: Water riser diagrams indicate water lines for top floor units are installed in the attic space. Clarify compliance with section 305.4 Freezing. Remove HD-1 DWV piping from mechanical sheets M2.21 and M4.03 and provide on the plumbing plans. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plumbing | 1748880 |
Health Dept. | Original | D | 9/29/2022 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3.
Series: #C148492, #C148497 AB | abrannon | Health Dept. | 1748804 |
CSU Water | Original | D | 9/29/2022 | CSUREVIEW | CSUREVIEW | Approved Commercial Water Meter Sizing Form required.
on plumbing plans, the domestic service line is indicated as 2.5", but on the approved utility service plan the line shows as 2". verify and correct. SSM | stefanm | CSU Water | 1748769 |
CSU Waste Water | Original | D | 9/29/2022 | CSUREVIEW | CSUREVIEW | Verify sanitary sewer connection for buildings B-1 and B-4 between the plumbing plans and approved utility service plans, they appear incorrect. SSM | stefanm | CSU Waste Water | 1748768 |
Gas/Elec. Utils | Original | A | 9/29/2022 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings provided with permit set. SSM | stefanm | Gas/Elec. Utils | 1748767 |
Construction | Original | D | 9/29/2022 | DANM | DANM | Clarify how lower level meets the definition of a basement. Occupancies areas of Code Study Form page 2 should equal total building area on page 1. Provide simple floor plans of all levels of the building type showing unit numbers and level of accessibility (Type A or Type B) as part of the Accessibility Plan. Alternative Materials & Methods application required to use footnote b of IBC Table 508.4 to separate U occupancy from R-2 instead of S-2 occupancy from R-2 in regard to private garages. Various line types used on Life Safety Plans for rated walls seem to be incorrect - all walls highlighted yellow and green should be fire barriers and all walls highlighted pink and orange should be fire partitions. Clarify how wall rating is being maintained - Provide listed assembly for 2 layers of gyp. board - if fire extinguisher cabinet is truly 1-hr rated that only provides protection from one side. IBC 722.6.2(1) does not apply to structural members - it applies to walls, floors and roofs - therefore char rating calculation does not work since 40 min. of the rating is coming from the gyp board. Individual encasement detail appears to be mis-referenced - should be K8/A5.03. Identify on framing plans all primary structure that requires individual encasement per IBC 704.2 & 704.3. COMcheck report is missing information addressing the floor slabs and the floor insulation between conditioned units and unconditioned garages.
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1748717 |
Electronic Plan | Original | / | 9/29/2022 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1748649 |
Enumeration | Original | D | 9/14/2022 | AMY | AMY | The Secondary Addressing does not follow our secondary addressing guidelines and needs to be corrected. The link to the secondary addressing guide was included in the last submittal. Again, submit a draft copy to the Enumerations prior to resubmitting.
Unless a unit is below grade, it should not be 2 digit unit numbering. ALL of the apartment buildings should start the unit numbering at 101, 102, 103, 104 and so on. Please follow the secondary addressing guide. This is a standard that is used throughout the City & County. https://www.pprbd.org/File/Resources/Downloads/Addressing/SECONDARY_ADDRESS_REQUEST_FORM.pdf
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Enumeration | 1741195 |
Electronic Plan | Original | / | 9/14/2022 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1741168 |
Resubmittal 1 | Original | / | 9/14/2022 | BPHILLIPS | BPHILLIPS | Resubmittal #1 | | Resubmittal 1 | 1740932 |
CO Springs Hazmat | Original | N | 10/3/2021 | CSFIRE | CSFIRE | | rpeterson | CO Springs Hazmat | 1572691 |
CO Springs Fire | Original | D | 10/3/2021 | CSFIRE | CSFIRE | You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | rpeterson | CO Springs Fire | 1572690 |
City Engr | Original | D | 9/7/2021 | PMORRIS | PMORRIS | The Grading & Erosion Control Plan (GECP) and the Permanent Control Measure (PCM) construction plan in the building permit are not approved by the Stormwater Enterprise team. Remove these plans and replace with a copy of both the Stormwater Enterprise approved Grading & Erosion Control Plan (GECP) and the Permanent Control Measure (PCM) construction plan. | | City Engr | 1558597 |
Mechanical | Original | D | 9/3/2021 | DALEH | DALEH | Remove units from plan that are not associated to this plan submittal. No review until proper pages submitted Remove all references to Florida. Current adopted codes are 2015 Remove general notes that do not apply to this plan submittal Provide use of each room Remove Plumbing drawings from Mechanical sheets Only show condensate piping from Furnace to floor drain Appears fans will be mounted in sidewall Provide a detail showing fan and duct routing Indicate on plans how furnace blower motor will shut down upon closure of the supply plenum radiation damper It appears furnace is located in bathroom Bathroom a return air plenum ? If so how possible Building is VA construction supply plenum will be penetrating a rated floor/ceiling assembly Remove any details that do not apply to this submittal See plans for comments (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1557744 |
CO Springs DRE | Original | D | 9/2/2021 | KCARLEO | KCARLEO | Must include a stamped approved copy of the development plan. The Park, School, Police and Fire fees also due. This fee is due prior to building permit approval and can be paid by bringing a check to the Development Review Enterprise offices at 2880 International Circle Suite 200-7 or by calling 385-5982 | | CO Springs DRE | 1557346 |
Electronic Plan | Original | / | 9/1/2021 | DALEH | DALEH | In Current Review by DALEH | | Electronic Plan | 1556642 |
CSU Contract Admin. | Original | D | 9/1/2021 | CSUAPPSPRM | CSUAPPSPRM | Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable development fees/charges. Please contact our office at 719-668-8111 for additional information and to request an estimate. AG
CWMSF available online at: https://www.csu.org/CSUDocuments/commercialwatermetersizingform.pdf | aguerin | CSU Contract Admin. | 1556261 |
Electrical | Original | D | 8/31/2021 | DANIELG | DANIELG | 1) Approval pending enumerations. Multi meter services must include a list of secondary enumerated addresses on the one-line. Secondary addressing must be approved by enumerations.
2) Pending approval in construction. Accessibility Plan – this does not need to be part of the electrical drawing set.
3) Comply with 240.87 2017 NEC including verification that the method chosen to reduce clearing time is set to operate at less than the available arcing current.
4) Provide fault current information (SCA, SCCR, AIC), in tabular form, for all new and re-fed electrical equipment including; panel boards, switchboards, service equipment, transfer equipment, elevator control panel, fire pump control panel, industrial control panels, air conditioning and refrigeration equipment. AC and refrigeration information are not required for dwelling units.
5) Volt amps for all branch circuit, feeder and service loads. (Meter Center #2).
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Electrical | 1555762 |
Health Dept. | Original | D | 8/30/2021 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application For questions, contact Environmental Health at 719-578-3199 option 3.CM | cmille96 | Health Dept. | 1555280 |
Plumbing | Original | D | 8/30/2021 | SHANEN | SHANEN | Construction review comments must be addressed. All plumbing shall comply with 2018 IPC. P2.20: Clarify how water line to HB-1 complies with section 305.4 Freezing. P2.21: Provided water pipe size analysis data is incomplete. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. Provide drainage fixture units served by the building drain and each section of the building drain.Provide water supply fixture units served by each main, branch and riser of the water distribution system. Provide a floor drain in the water entry/meter room per CSU requirements. P3.01: Remove all unit plans that do not apply to this building. P5.02: Plumbing materials shall be listed and approved in compliance with sections 303 Materials. and 702.4 Fittings.Provide referenced standard for expansion fitting to show compliance with sections 303 and 702.4. Plans in this series: 148492, 148497, 148499, 148500, 148720 (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plumbing | 1555004 |
Zoning/Planning | Original | / | 8/30/2021 | KCARLEO | KCARLEO | In Current Review by KCARLEO | | Zoning/Planning | 1554962 |
Electronic Plan | Original | / | 8/30/2021 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1554949 |
Gas/Elec. Utils | Original | D | 8/30/2021 | CSUREVIEW | CSUREVIEW | Approved CSU Construction Drawings must be attached to the permit set prior to our approval on Water Division and Wastewater Div. Contact Utilities Development Services at 719-668-8259 with any questions. DMM | dmakings | Gas/Elec. Utils | 1554926 |
CSU Waste Water | Original | D | 8/30/2021 | CSUREVIEW | CSUREVIEW | Approved CSU Construction Drawings must be attached to the permit set prior to our approval on Water Division and Wastewater Div. Contact Utilities Development Services at 719-668-8259 with any questions. DMM | dmakings | CSU Waste Water | 1554925 |
CSU Water | Original | D | 8/30/2021 | CSUREVIEW | CSUREVIEW | Approved CSU Construction Drawings must be attached to the permit set prior to our approval on Water Division and Wastewater Div. Contact Utilities Development Services at 719-668-8259 with any questions. DMM | dmakings | CSU Water | 1554920 |
Elevators | Original | N | 8/30/2021 | ERIC | ERIC | No conveyances indicated | | Elevators | 1554864 |
Construction | Original | D | 8/30/2021 | DANM | DANM | Level labeled basement on the Code Study Form and the drawings does not appear to meet the definition of a basement - this should be considered a 4-story building. The occupancy areas on page 2 of the Code Study Form should equal the total building area on page 1. Provide simple floor plans of all levels of the building type on the accessibility plan showing unit numbers and level of accessibility - no accessibility review completed. Alternative Materials & Methods request required to use footnote b of IBC table 508.4 to separate U occupancy from R-2. Since this is a 4-story building commercial COMcheck report must be submitted. Indicate fire separation distances for all sides of the building on the site plan. Wall Assembly U305 appears to be a fire partition, fire barrier, bearing wall and exterior wall on the plan - somehow distinguish between them. Occupant load factor for residential is 200 gross so there should not be any spaces with zero occupants. Building section R-values do not seem to match REScheck report - clarify. Clarify how wall rating behind fire extinguisher cabinet is being maintained - provide listed assembly for 2 layers of gyp. board. A majority of the UL listed assemblies appear to be outdated - please replace with up-to-date listings that match the UL website. Clarify location of GA floor/ceiling assembly. Specify which system is being used for UL574. Clarify if Option A or Option B bathroom is being used for all Type B units. Provide wall detail or note(s) to specify construction for all non-rated walls. Some doors are located in 1-hr fire barriers and have a 1-hr rating requirement. Address all red comments on drawings and remove from all pages. Clarify how reduced vertical clearance requirements are being met under the stair. Provide section through stair showing continuity of fire barriers through floor intersections. Provide detail of fire barrier at garage showing vertical continuity to floor sheathing above. Breezeway should be labeled as corridor throughout drawings. Allowable bearing capacity list on Sheet S0-1A does not seem to match submitted soils report. Identify all primary framing that requires individual encasement per IBC 704.2 & 704.3. 2015 IECC should be used for COMcheck report. There should only be one COMcheck report for the entire building - not for individual units.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1554850 |
Electronic Plan | Original | / | 8/30/2021 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1554439 |
Enumeration | Original | D | 8/18/2021 | AMY | AMY | The same address was submitted on all plans. Enumerations has corrected this plan to the correct address based on page A0.03-2,in our BDA screen. These buildings are 10471, 10481 & 10491 Clingman Heights, & 10412, 10452 Scarp View. 10471 Clingman Hts will be in the BDA screen and the other addresses will be added to the plan label below the other address.
The Zip Code on the Code Study for is incorrect, correct to show 80924.
The Secondary Addressing on page A0.04-2, cannot be placed on the top of the buildings, each floor needs to be shown with the floor plan. The Secondary Addressing does not follow our secondary addressing guidelines and needs to be corrected. Submit a draft copy to the Enumerations prior to resubmittal. Unless a unit is below grade, it should not be 2 digit unit numbering. Here is our secondary addressing guide. https://www.pprbd.org/File/Resources/Downloads/Addressing/SECONDARY_ADDRESS_REQUEST_FORM.pdf Email to Amy@pprbd.org
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Enumeration | 1548941 |
Electronic Plan | Original | / | 8/18/2021 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1548927 |
Floodplain | Original | N | 7/14/2021 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6227114004) | | Floodplain | 1530368 |