Health Dept. | Original | N | 5/25/2023 | HEALTHDEPT | HEALTHDEPT | Not applicable. Per Lara Grosjean, no retail food establishment will be on-premise until a third party vendor is determined. New vendor will apply for licensing at a future date.
Construction activity permit PT1272 is valid from 2/20/23 - 8/20/23. To continue any earthmoving operations after 8/20/23, please reapply for a new permit online at https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application .
For questions, contact Environmental Health at 719-578-3199 option 3.BR | brothrock | Health Dept. | 1847727 |
CSU Contract Admin. | Original | A | 4/27/2023 | CSUAPPSPRM | CSUAPPSPRM | Commercial water meter sizing form approved and applicable development charges and fees paid. CZ | c.zani | CSU Contract Admin. | 1836852 |
Electrical | Original | A | 4/3/2023 | RICHG | RICHG | | | Electrical | 1824771 |
Electronic Plan | Original | / | 4/3/2023 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1824651 |
CSU Contract Admin. | Original | D | 4/3/2023 | CSUAPPSPRM | CSUAPPSPRM | Commercial Water Meter sizing form approved - Requires payment of applicable development fees/charges. Please contact our office at 719-668-8111 / cca@csu.org for additional information. CZ | c.zani | CSU Contract Admin. | 1824500 |
Health Dept. | Original | D | 3/31/2023 | HEALTHDEPT | HEALTHDEPT | Construction activity permit PT1272 is valid from 2/20/23 - 8/20/23.
Retail food establishment plan review is in process and not yet approved. For questions, contact Environmental Health at 719-578-3199 option 3. AB | abrannon | Health Dept. | 1824185 |
CSU Waste Water | Original | A | 3/30/2023 | CSUREVIEW | CSUREVIEW | Comments addressed. CJS | cjsavage | CSU Waste Water | 1823324 |
Plumbing | Original | A | 3/30/2023 | SHANEN | SHANEN | | | Plumbing | 1823317 |
Submittal 5 | Original | / | 3/30/2023 | SIERRAC | SIERRAC | Submittal #5 | | Submittal 5 | 1823268 |
CO Springs Fire | Original | A | 3/22/2023 | CSFIRE | CSFIRE | You are responsible for reviewing the APPROVAL comments found on the CSFD website as they contain important inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS! ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! (see full review) | csfdit | CO Springs Fire | 1819329 |
CO Springs DRE | Original | A | 3/10/2023 | ASTOCKER | ASTOCKER | Reduced ADA parking (1 stall) approved administratively. The required number of ADA parking stalls is 5, and 6 are being provided (previously 7 per Development Plan). All other aspects of the Development Plan are being met. (see full review) | | CO Springs DRE | 1814536 |
Health Dept. | Original | D | 3/7/2023 | HEALTHDEPT | HEALTHDEPT | Construction activity permit PT1272 is valid from 2/20/23 - 8/20/23.
Retail food establishment plan review is in process and not yet approved. For questions, contact Environmental Health at 719-578-3199 option 3. AB | abrannon | Health Dept. | 1813232 |
Zoning/Planning | Original | / | 3/7/2023 | ASTOCKER | ASTOCKER | In Current Review by ASTOCKER | | Zoning/Planning | 1813176 |
Plumbing | Original | A | 3/6/2023 | SHANEN | SHANEN | | | Plumbing | 1810719 |
CSU Contract Admin. | Original | D | 3/6/2023 | CSUAPPSPRM | CSUAPPSPRM | Commercial Water Meter sizing form disapproved- pending variance. Requires payment of applicable development fees/charges once CWMSF is approved. Please contact our office at 719-668-8111 / cca@csu.org for additional information. CZ | c.zani | CSU Contract Admin. | 1810665 |
CSU Water | Original | A | 3/6/2023 | CSUREVIEW | CSUREVIEW | Comments addressed. DMM | dmakings | CSU Water | 1810645 |
CSU Waste Water | Original | D | 3/6/2023 | CSUREVIEW | CSUREVIEW | The plumbing plans show 4" waste service line exiting the building. USP shows 6", revise as necessary. DMM | dmakings | CSU Waste Water | 1810642 |
Construction | Original | A | 3/6/2023 | JUSTINL | JUSTINL | | | Construction | 1810604 |
Electronic Plan | Original | / | 3/3/2023 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1810147 |
Enumeration | Original | A | 3/1/2023 | BECKYA | BECKYA | | | Enumeration | 1808999 |
Submittal 4 | Original | / | 2/28/2023 | KALLISTAJ | KALLISTAJ | Submittal #4 | | Submittal 4 | 1808433 |
CO Springs Fire | Original | D | 2/10/2023 | CSFIRE | CSFIRE | Submitted by James Trimble: You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! (see full review) | csfdit | CO Springs Fire | 1801371 |
Electrical | Original | A | 1/30/2023 | RICHG | RICHG | | | Electrical | 1796743 |
Electronic Plan | Original | / | 1/30/2023 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1796700 |
Health Dept. | Original | D | 1/27/2023 | HEALTHDEPT | HEALTHDEPT | Construction activity permit PT1272 is valid from 2/20/23 - 8/20/23.
Retail food establishment plan review required (for cold holding TCS sandwiches). Information and application may be accessed online at https://www.elpasocountyhealth.org/service/retail-food-establishment-licensing-0. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. AB | abrannon | Health Dept. | 1796365 |
City Engr | Original | A | 1/27/2023 | JDAGNILLO | JDAGNILLO | | | City Engr | 1796213 |
Mechanical | Original | A | 1/27/2023 | JUSTINC | JUSTINC | | | Mechanical | 1796088 |
CSU Contract Admin. | Original | D | 1/27/2023 | CSUAPPSPRM | CSUAPPSPRM | Same comment as previously noted:
Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable utility charges and fees. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees and request an estimate. CWMSF available online at:
https://www.csu.org/CSUDocuments/watermetersizingforminteractive.pdf
CZ | c.zani | CSU Contract Admin. | 1796083 |
Electronic Plan | Original | / | 1/27/2023 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Electronic Plan | 1796072 |
Plumbing | Original | D | 1/26/2023 | SHANEN | SHANEN | CSU comments must be addressed. P2.2: 6"FP and 4"DCW locations are reversed on utility service plans. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plumbing | 1795766 |
CO Springs DRE | Original | D | 1/26/2023 | ASTOCKER | ASTOCKER | Please revise the provided parking total called out on the Architectural Plan set to match the provided parking as approved in the Development Plan. (see full review) | | CO Springs DRE | 1795764 |
CSU Water | Original | D | 1/26/2023 | CSUREVIEW | CSUREVIEW | The pipe sizes on the plumbing sheet for the fire and domestic do not match the Utility Plan. Revised as required. Refer to 2023 Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form. Also refer to details B4-16 through B4-22 and select an appropriate meter clearance detail to include on the plumbing plans. mjg | mgackle | CSU Water | 1795753 |
CSU Waste Water | Original | D | 1/26/2023 | CSUREVIEW | CSUREVIEW | The pipe sizes on the plumbing sheet does not match the approed Utility Plan. Revise as necessary. mjg | mgackle | CSU Waste Water | 1795751 |
Elevators | Original | A | 1/26/2023 | ERIC | ERIC | Otis hydrofit mrl hydro and 1 Garaventa VPL | | Elevators | 1795744 |
Elevators | Original | D | 1/26/2023 | ERIC | ERIC | 1 Otis hydrofit machineroom-less hydraulic elevator with adjoining control closet and 1 VPL
Vertical platform lift (wheelchair lift) submittals indicate that this unit is for residential use, commercial lift required. . PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Elevators | 1795675 |
Zoning/Planning | Original | / | 1/26/2023 | ASTOCKER | ASTOCKER | In Current Review by ASTOCKER | | Zoning/Planning | 1795660 |
Construction | Original | D | 1/26/2023 | JUSTINL | JUSTINL | Clarify reason for 1 hour rating at elevator. Elevator does not penetrate rated horizontal assembly and building is not rated. Provide code path. If rated for other than IBC, note as such. Missing multiple pages for prefabricate metal building. Need full set of structural plans for review.
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1795633 |
Electronic Plan | Original | / | 1/26/2023 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1795482 |
Enumeration | Original | A | 1/25/2023 | BECKYA | BECKYA | | | Enumeration | 1795429 |
Submittal 3 | Original | / | 1/25/2023 | KALLISTAJ | KALLISTAJ | Submittal #3 | | Submittal 3 | 1795381 |
CSU Contract Admin. | Original | D | 12/14/2022 | CSUAPPSPRM | CSUAPPSPRM | Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable utility charges and fees. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees and request an estimate. CWMSF available online at:
https://www.csu.org/CSUDocuments/watermetersizingforminteractive.pdf
CZ | c.zani | CSU Contract Admin. | 1782180 |
Health Dept. | Original | D | 12/13/2022 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com.
Retail food establishment plan review required. Information and application may be accessed online at https://www.elpasocountyhealth.org/service/retail-food-establishment-licensing-0. Please email application and all required documents to healthinfo@elpasoco.com.
For questions, contact Environmental Health at 719-578-3199 option 3. BR | brothrock | Health Dept. | 1781807 |
Electrical | Original | D | 12/13/2022 | SHELBY | SHELBY | Pending elevator approval. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1781707 |
Electronic Plan | Original | / | 12/13/2022 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1781673 |
CO Springs Fire | Original | D | 12/13/2022 | CSFIRE | CSFIRE | We regret to inform you, this plan is disapproved. You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | csfdit | CO Springs Fire | 1781570 |
CO Springs Fire | Original | D | 12/13/2022 | CSFIRE | CSFIRE | We regret to inform you, this plan is disapproved. You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | csfdit | CO Springs Fire | 1781569 |
City Engr | Original | D | 12/13/2022 | JDAGNILLO | JDAGNILLO | Include a copy of the Stormwater Enterprise approved Grading & Erosion Control Plan in the electronic building permit set. | | City Engr | 1781451 |
CO Springs DRE | Original | A | 12/13/2022 | ASTOCKER | ASTOCKER | Request to construct new commercial building to be used as a climbing gym is consistent with the approved development plan. Rendered elevations and site configuration match those approved in the development plan. (see full review) | | CO Springs DRE | 1781372 |
Mechanical | Original | A | 12/13/2022 | JUSTINC | JUSTINC | | | Mechanical | 1781346 |
Zoning/Planning | Original | / | 12/13/2022 | ASTOCKER | ASTOCKER | In Current Review by ASTOCKER | | Zoning/Planning | 1781322 |
CSU Waste Water | Original | D | 12/12/2022 | CSUREVIEW | CSUREVIEW | Plans have originally approved utility plans; however the USP has been revised. provide the revised plans in the plan set. SSM | stefanm | CSU Waste Water | 1781265 |
CSU Water | Original | D | 12/12/2022 | CSUREVIEW | CSUREVIEW | Utility Comment Sheet P5.0: Replace Domestic Water Entry Diagram with Detail B1-11 with correct size of meter called out. Need the actual detail from CSU Water Line Extension and Service Standards, not just a reference.
Plans have originally approved utility plans; however the USP has been revised. provide the revised plans in the plan set. SSM | stefanm | CSU Water | 1781264 |
Gas/Elec. Utils | Original | A | 12/12/2022 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. SSM | stefanm | Gas/Elec. Utils | 1781261 |
Construction | Original | D | 12/12/2022 | JUSTINL | JUSTINL | Life safety plan to include: -Common path of travel to be measured and indicated rectilinear and not at angles. -Longest exit access travel distance. -Provide directional arrows at stairs. -Indicate if spaces are open to below or above. -Exit capacity needs to be defined. -Walls at electrical room - fire riser room - Elevator appear to be rated per A1.02 and wall types on A7.02 and A7.10. Clarify reason for rating. If rated for other than IBC, note as such. Indicate if any other exterior doors are intended to be public entrance doors on A1.02. verify requirements of 1105 for accessible entrances are met. Door 100C opens to grade for future addition per site plan and may not meet requirements of accessible entrance and egress. Additional vestibule may be required Plywood does not comply with section 603 for Type II construction. See sheet A7.10 for additional information Bench at employee bathroom impedes maneuvering clearances and clear floor space for roll in shower - bench indicator of 15 does not appear to be a fold up bench. Baby changing station appears to encroach on accessible rout - Permitted to be reduced to 32" for a maximum length of 24" Indicate if space is open below grand stands - May require protection per 10.29.1.1.1 of 2015 IBC Indicate on plans that grand stand designed per the 2015 ICC 300 Indicate cane rails for reduced head clearance per 307.4 of the 2009 ANSI or if under stairs will be closed off Provide ESR - 1792 for plan set and review. Noted on S2.1 IECC calls for exterior walls and ceilings to have continuous insulation - Do not see where continuous insulation is indicated on sectional sheets PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1781208 |
Plumbing | Original | D | 12/9/2022 | SHANEN | SHANEN | P1.1: There are no doors on the men's and women's restrooms per current architectural floor plans. Employee restroom door swing does not match current architectural floor plans. P1.2: Three separate building drains are not shown on the utility service plans and it appears that one serving a restroom is discharging to a grease interceptor which is prohibited. Building drain locations must match the utility service plans. Show venting for the grease interceptor if applicable. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plumbing | 1780325 |
Electronic Plan | Original | / | 12/6/2022 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1779010 |
Elevators | Original | D | 12/5/2022 | ERIC | ERIC | 1 Otis hydrofit machineroom-less hydraulic elevator with adjoining control closet and 1 VPL
E1.0 Basement electrical plans indicate a machineroom for the elevator, per basis of design this is a machineroom-less hydraulic elevator with adjoining control closet, please refer to architectural and elevator plans.
M6.0 Basement mechanical plans indicate a machineroom for the elevator, per basis of design this is a machineroom-less hydraulic elevator with adjoining control closet, please refer to architectural and elevator plans.
Wheelchair Lift plans indicate that this unit is for residential application, please clarify. . PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Elevators | 1778121 |
Enumeration | Original | A | 12/5/2022 | BECKYA | BECKYA | | | Enumeration | 1777938 |
Submittal 2 | Original | / | 12/5/2022 | SHELLEY | SHELLEY | Submittal #2 | | Submittal 2 | 1777923 |
CO Springs Hazmat | Original | N | 9/29/2022 | CSFIRE | CSFIRE | | dwithee | CO Springs Hazmat | 1748168 |
CO Springs Fire | Original | D | 9/29/2022 | CSFIRE | CSFIRE | WALK OK – See our “Virtual” Walk Through process here: https://coloradosprings.gov/sites/default/files/inline-images/walk-thru_memo.pdf We regret to inform you, this plan is disapproved. You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! (see full review) | csfdit | CO Springs Fire | 1748167 |
Electrical | Original | D | 9/17/2022 | SHELBY | SHELBY | 1. Specify AL or CU conductors on one line. 2. Services under 1200 amps require a C/T can. One line requires review on re submittal. | | Electrical | 1742605 |
Electronic Plan | Original | / | 9/17/2022 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1742604 |
City Engr | Original | D | 9/9/2022 | PMORRIS | PMORRIS | Upload a copy of the Stormwater Enterprise approved Grading & Erosion Control Plan (GECP) into the building permit. Upload a copy of the approved Development Plan into the building permit. | | City Engr | 1739479 |
Mechanical | Original | D | 9/7/2022 | JUSTINC | JUSTINC | How will this air be relieved? Clarify how this will comply 2015 IMC 306.1- 306.5.2 Clarify platform (A) sheets indicate enclosure?Verify height and service access Provide refrigeration calculation per 2015 IMC 1103.1 Verify if within allowable limits per table on plan. If over the allowable limits indicate how protecting on plan.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Mechanical | 1738477 |
Plumbing | Original | D | 9/7/2022 | SHANEN | SHANEN | Construction, CSU and enumeration comments must be addressed. Restroom door swings do not match the architectural plans. Correct throughout. P1.1: SP2 serving the basement plumbing fixtures and elevator sump discharge does not comply with section 712.1 Building subdrains. The sump shall not receive drainage from any piping within the building capable of being discharged by gravity to the building sewer. WB-2 installed in elevator machine room does not comply with section 301.6 Prohibited locations. P1.2: 6" SAN not shown on waste water utility service plan.Waste water utility service plan shows 4" SAN discharging to a grease interceptor. Clarify as the connected restroom fixtures are prohibited from discharging to the grease waste. Show venting for the grease interceptor if applicable. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Plumbing | 1738271 |
CSU Contract Admin. | Original | D | 9/7/2022 | CSUAPPSPRM | CSUAPPSPRM | Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable utility charges/fees. Please contact our office at 719-668-8111 for additional information on charges/fees and to request an estimate.
CWMSF available online at: https://www.csu.org/Documents/CommercialWaterMeterSizing.pdf?csf=1&e=WVWzT5
AMS | ASweet | CSU Contract Admin. | 1738264 |
Elevators | Original | D | 9/6/2022 | ERIC | ERIC | Please provide elevator submittals.
(NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Elevators | 1738047 |
Health Dept. | Original | D | 9/2/2022 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3.
Retail food establishment plan review required. Information and application may be accessed online at https://www.elpasocountyhealth.org/service/retail-food-establishment-licensing-0. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. AF | Amanda Furno | Health Dept. | 1737659 |
CSU Water | Original | D | 9/2/2022 | CSUREVIEW | CSUREVIEW | Approved Development Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. Also add the appropriate CSU LESS water meter detail to the plumbing sheet. Verify water service size and meter according to the approved Commercial Meter Sizing Form. mjg | mgackle | CSU Water | 1737290 |
CSU Waste Water | Original | D | 9/2/2022 | CSUREVIEW | CSUREVIEW | Approved Development Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. mjg | mgackle | CSU Waste Water | 1737284 |
Gas/Elec. Utils | Original | D | 9/2/2022 | CSUREVIEW | CSUREVIEW | Approved Development Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. mjg | mgackle | Gas/Elec. Utils | 1737283 |
CO Springs DRE | Original | D | 9/2/2022 | APAQUETTE | APAQUETTE | Please provide APPROVED development plan entitlement. No approval stamp from City Planning is located on submitted DP. (see full review) | | CO Springs DRE | 1737267 |
Construction | Original | D | 9/2/2022 | JUSTINL | JUSTINL | Plan review stopped See plans - Need to review code study - architectural plans - rated assemblies in order to continue Construction plan check (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Construction | 1737241 |
Electronic Plan | Original | / | 9/1/2022 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1736966 |
Enumeration | Original | D | 9/1/2022 | BECKYA | BECKYA | Please provide a site plan in the Architectural Plans of the entire lot to include building location, the surrounding streets and north arrow. (NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF COMMENTS. FOR ALL COMMENTS, THE DESIGNER SHALL CONDUCT A FULL EXAMINATION OF THE DISAPPROVED SET, WHICH WILL BE ACCESSIBLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. AFTER THE DESIGNER’S EXAMINATION, INDIVIDUAL REVIEWERS ARE AVAILABLE FOR DISCUSSION ON COMMENTS VIA PHONE, EMAIL, OR IN PERSON.) | | Enumeration | 1736864 |
Electronic Plan | Original | / | 9/1/2022 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 1736842 |
Floodplain | Original | N | 8/31/2022 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6220201035) | | Floodplain | 1736212 |