CO Springs Fire | Original | A | 3/22/2024 | CSFIRE | CSFIRE | You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | chiptaylor | CO Springs Fire | 1978288 |
City Engr | Original | D | 3/7/2024 | PMORRIS | PMORRIS | Upload a copy of the Stormwater Enterprise approved Grading & Erosion Control Plan (GECP) and the Permanent Control Measure (water quality facility) construction plan into the building permit. | | City Engr | 1972348 |
Mechanical | Original | A | 3/6/2024 | DALEH | DALEH | | | Mechanical | 1971689 |
Electrical | Original | D | 3/5/2024 | BERTHA | BERTHA | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1970819 |
CO Springs DRE | Original | D | 3/4/2024 | APAQUETTE | APAQUETTE | Upload recorded final plat. | | CO Springs DRE | 1970544 |
Plumbing | Original | A | 3/4/2024 | SHANEN | SHANEN | | | Plumbing | 1970538 |
Zoning/Planning | Original | / | 3/4/2024 | APAQUETTE | APAQUETTE | In Current Review by APAQUETTE | | Zoning/Planning | 1970534 |
CSU Contract Admin. | Original | D | 3/4/2024 | CSUAPPSPRM | CSUAPPSPRM | Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable utility charges/fees. Please contact our office at 719-668-8111 for additional information on charges/fees and to request an estimate.
CWMSF approved 04/11/2023
AMS | ASweet | CSU Contract Admin. | 1970503 |
CSU Water | Original | A | 3/4/2024 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings provided with permit set dated 2/13/24.MDA | malcuran | CSU Water | 1970486 |
CSU Water | Original | A | 3/4/2024 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings provided with permit set dated 2/13/24.MDA | malcuran | CSU Water | 1970485 |
CSU Waste Water | Original | A | 3/4/2024 | CSUREVIEW | CSUREVIEW | Approved development plan and utility construction drawings provided with permit set dated 2/13/2024.MDA | malcuran | CSU Waste Water | 1970484 |
Gas/Elec. Utils | Original | A | 3/4/2024 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions.MDA | malcuran | Gas/Elec. Utils | 1970482 |
Construction | Original | A | 3/4/2024 | JUSTINL | JUSTINL | | | Construction | 1970466 |
Electronic Plan | Original | / | 3/4/2024 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1970403 |
Enumeration | Original | A | 3/4/2024 | BRENT | BRENT | | | Enumeration | 1970297 |
Electronic Plan | Original | / | 3/1/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1969770 |
Submittal 3 | Original | / | 2/29/2024 | QUINTONW | QUINTONW | Submittal #3 | | Submittal 3 | 1969738 |
Enumeration | Original | A | 2/29/2024 | QUINTONW | QUINTONW | Reopened plan for resubmittal | | Enumeration | 1969296 |
Canceled Plans | Original | / | 2/29/2024 | ADMIN | ADMIN | Electronic Plan automatically cancelled due to inactivity. | | Canceled Plans | 1969245 |
CO Springs Fire | Original | D | 2/28/2023 | CSFIRE | CSFIRE | WALK OK – See our “Virtual” Walk Through process here: https://coloradosprings.gov/sites/default/files/inline-images/walk-thru_memo.pdf
You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | csfdit | CO Springs Fire | 1808509 |
CO Springs DRE | Original | D | 2/22/2023 | ACOOPER | ACOOPER | Include approved development plan | | CO Springs DRE | 1805789 |
Mechanical | Original | D | 2/14/2023 | JUSTINC | JUSTINC | As noted in the last review hoistway penetrations require Fire/Smoke dampers - Not just Fire dampers
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1802603 |
Plumbing | Original | D | 2/14/2023 | SHANEN | SHANEN | Construction and CSU comments must be addressed. Provide required water pipe size analysis data, see 2018 IPC appendix E. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. All gas and condensate piping related items shall be on the mechanical plans, remove all references to gas and condensate piping from the plumbing plans. Provide a floor drain for the backflow preventer or show how complying with section 608.15.2.1. Provide a two way fitting or two riser clean-out at the junction of the building drain and building sewer per CO state amendment to section 708.1.3. Clarify how a mop sink with a 3" trap and drain can handle the 50 gpm discharge from the elevator sump. CSU approved utility service plans required to verify water service and building drain location/sizing. Plumbing plans must correspond with CSU approved utility service plans. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plumbing | 1802460 |
Zoning/Planning | Original | / | 2/14/2023 | ACOOPER | ACOOPER | In Current Review by ACOOPER | | Zoning/Planning | 1802439 |
City Engr | Original | D | 2/13/2023 | JDAGNILLO | JDAGNILLO | See previous comment - Include a copy of the approved Development Plan and a copy of both the Stormwater Enterprise approved Grading & Erosion Control Plan and Permanent Control Measure (Permanent Water Quality Facility) Plan in the electronic building permit set. (STM-REV22-1024) | | City Engr | 1802317 |
Electrical | Original | A | 2/13/2023 | RICHG | RICHG | | | Electrical | 1802303 |
CSU Water | Original | D | 2/13/2023 | CSUREVIEW | CSUREVIEW | See previous comments. mjg | mgackle | CSU Water | 1802268 |
CSU Waste Water | Original | D | 2/13/2023 | CSUREVIEW | CSUREVIEW | See previous comments. mjg | mgackle | CSU Waste Water | 1802267 |
Gas/Elec. Utils | Original | D | 2/13/2023 | CSUREVIEW | CSUREVIEW | See previous comments. mjg | mgackle | Gas/Elec. Utils | 1802265 |
CSU Contract Admin. | Original | D | 2/13/2023 | CSUAPPSPRM | CSUAPPSPRM | Same comment as previous:
Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable utility charges and fees. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees and request an estimate. CWMSF available online at:
https://www.csu.org/CSUDocuments/watermetersizingforminteractive.pdf
CZ | c.zani | CSU Contract Admin. | 1802256 |
Construction | Original | D | 2/13/2023 | JUSTINL | JUSTINL | Updated code study needs to be removed prom plans and submitted as its own file. Provide common path of travel distance per Section 1006 on life safety plan. Door swings into clear floor space at lavatory and toilet on sheet A1-11 Does not appear to have required maneuvering clearances at pull side of door at restrooms.
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1802251 |
Electronic Plan | Original | / | 2/9/2023 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 1801181 |
Elevators | Original | A | 2/9/2023 | ERIC | ERIC | Basis of design, 2 Otis Hydrofit machineroom-less hydraulic elevators with control space, no generator.
Full elevator submittals required prior to issuing elevator permit. | | Elevators | 1801174 |
Enumeration | Original | A | 2/9/2023 | BRENT | BRENT | | | Enumeration | 1801115 |
Electronic Plan | Original | / | 2/9/2023 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1801106 |
Submittal 2 | Original | / | 2/8/2023 | ANDREAL | ANDREAL | Submittal #2 | | Submittal 2 | 1800874 |
CO Springs DRE | Original | D | 12/15/2022 | RSEVIGNY | RSEVIGNY | Development Plan not yet approved, a new planner will be assigned, new submittals must be through Accela, please email at gabe.sevigny@coloradosprings.gov | | CO Springs DRE | 1782321 |
Plumbing | Original | D | 11/16/2022 | TCRIPPEN | TCRIPPEN | Your CD lines are to be on the M pages if you use plumbing pages you will need to comply with all the required clean outs. Provide CSUs water meter detail sheet. P1-01 floor plan not legible. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plumbing | 1771645 |
CO Springs Hazmat | Original | N | 11/14/2022 | CSFIRE | CSFIRE | | dwithee | CO Springs Hazmat | 1769976 |
CO Springs Fire | Original | D | 11/14/2022 | CSFIRE | CSFIRE | We regret to inform you, this plan is disapproved. You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | csfdit | CO Springs Fire | 1769975 |
Mechanical | Original | D | 11/7/2022 | JUSTINC | JUSTINC | How complying with 2015 IECC C403.2.4.3? Fire/smoke dampers - elevator shaft Provide refrigeration calculation per 2015 IMC 1103.1 Verify if within allowable limits per table on plan. If over the allowable limits indicate how protecting on plan. Add note: Provide (1) copy of test and balance report to mechanical inspector at time of heating final inspection. Add note: Damper installations for fire resistive and smoke resistive assemblies are to be listed and approved for all assemblies. Fire resistive UL floor/ceiling assemblies may have a specific damper model identified within the UL listing itself. Mechanical field inspection will verify these requirements.
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1767532 |
Electronic Plan | Original | / | 11/7/2022 | JUSTINC | JUSTINC | In Current Review by JUSTINC | | Electronic Plan | 1767506 |
Health Dept. | Original | N | 11/4/2022 | HEALTHDEPT | HEALTHDEPT | Not applicable. Climate control self storage conditioned building. MT | mtemple | Health Dept. | 1766914 |
City Engr | Original | D | 11/4/2022 | PMORRIS | PMORRIS | Upload a copy of both the Stormwater Enterprise approved Grading & Erosion Control Plan (GECP) and the Permanent Control Measure (permanent water quality facility) construction plan into the building permit. Contact Erin Powers (erin.powers@coloradosprings.gov) or Jonathan Scherer (jonathan.scherer@coloradosprings.gov) with the Stormwater Enterprise questions.
Upload a copy of the approved Development Plan into the building permit. | | City Engr | 1766222 |
Electrical | Original | D | 11/3/2022 | SHELBY | SHELBY | 1. Electrical approval is not possible without elevator comments being addressed.
2. Remove Equipment ground from service lateral.
3. Show T1 secondary conductor size, type, and quantity.
4. Selective coordination study per 620.62 NEC is required prior to final inspection.
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1766167 |
Electronic Plan | Original | / | 11/3/2022 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 1766161 |
CSU Contract Admin. | Original | D | 11/2/2022 | CSUAPPSPRM | CSUAPPSPRM | Requires approved Commercial Water Meter Sizing Form (CWMSF) and payment of applicable utility charges and fees. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees and request an estimate. CWMSF available online at:
https://www.csu.org/CSUDocuments/watermetersizingforminteractive.pdf
CZ | c.zani | CSU Contract Admin. | 1764848 |
Zoning/Planning | Original | / | 11/2/2022 | RSEVIGNY | RSEVIGNY | In Current Review by RSEVIGNY | | Zoning/Planning | 1764827 |
Gas/Elec. Utils | Original | D | 11/2/2022 | CSUREVIEW | CSUREVIEW | - An approved development by the city of Colorado Springs is needed. CM | CoreyM | Gas/Elec. Utils | 1764664 |
CSU Waste Water | Original | D | 11/2/2022 | CSUREVIEW | CSUREVIEW | - An approved development by the city of Colorado Springs is needed.
- The on-site utilities plan must be reviewed and approved by CS Utilities. CM | CoreyM | CSU Waste Water | 1764662 |
CSU Water | Original | D | 11/2/2022 | CSUREVIEW | CSUREVIEW | - An approved development by the city of Colorado Springs is needed.
- The on-site utilities plan must be reviewed and approved by CS Utilities.
- The plumbing plan must match the approved civil plans and show an approved CSU water meter detail.
- CWMSF must be approved by CS Utilities as well. CM | CoreyM | CSU Water | 1764661 |
Construction | Original | D | 11/2/2022 | MICHAELA | MICHAELA | Occupant Load factor for warehouse use is 1:500 GROSS. That means total SF of the floor, not "occupiable areas". Revise occupant load. RBD permits a reduction to the prescriptive occupant load of 10% without requiring a variance. Min occupant load 195 occupants. Locate required clear floor spaces in all toilet rooms. Provide detailed a section view of the Fire Barrier showing vertical continuity at intersection of the structural steel beams supporting the floor system. Clarify why exterior door 108 is listed as rated. Revise COMcheck using the 2015 IECC. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1764582 |
Elevators | Original | D | 10/31/2022 | ERIC | ERIC | Basis of design, 2 Otis Hydrofit machineroom-less hydraulic elevators with control space, no generator.
Full elevator submittals required prior to issuing elevator permit.
E1-05 Elevator pit lighting, provide 10 fc of lighting in each pit, individual circuits and switches. Provide 19 fc lighting at control spaces, dedicated circuits required for each. . PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Elevators | 1763270 |
Electronic Plan | Original | / | 10/31/2022 | MICHAELA | MICHAELA | In Current Review by MICHAELA | | Electronic Plan | 1763202 |
Enumeration | Original | A | 10/28/2022 | BRENT | BRENT | | | Enumeration | 1763114 |
Electronic Plan | Original | / | 10/28/2022 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1763105 |
Floodplain | Original | N | 10/27/2022 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6421310001) | | Floodplain | 1762568 |