County Zoning | Original | A | 11/6/2024 | DSDHOWSER | DSDHOWSER | 6658 sq ft with a fee of $8800/1000 sq ft for Convenience Commercial use. Fee due is $58590.40. | | County Zoning | 2082265 |
Enumeration | Original | A | 11/5/2024 | AMY | AMY | | | Enumeration | 2081894 |
Woodmen Hills Water | Original | A | 10/25/2024 | WOODMENHLSMETRO | WOODMENHLSMETRO | WHMD has no objection to the proposed improvements. | Cody.Ritter | Woodmen Hills Water | 2077216 |
Woodmen Hills Waste Water | Original | A | 10/25/2024 | WOODMENHLSMETRO | WOODMENHLSMETRO | WHMD has no objection to the proposed improvements. | Cody.Ritter | Woodmen Hills Waste Water | 2077215 |
EPC Health Dept | Original | D | 10/24/2024 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/.
Retail food establishment approved in plan review, but the above will be required before approval is granted. AB | abrannon | EPC Health Dept | 2077206 |
Enumeration | Original | D | 10/24/2024 | AMY | AMY | Enumerations has yet to receive the Final Recorded Plat with the Clerk & Recorders office. Once the Recorded copy is received, Enumerations can approve the plan in this department. Please email to me directly Amy@pprbd.org 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2077053 |
Submittal 7 | Original | / | 10/23/2024 | BRIANNAM | BRIANNAM | Submittal #7 | | Submittal 7 | 2076083 |
County Zoning | Original | D | 9/17/2024 | DSDHOWSER | DSDHOWSER | Project not approved by El Paso County Planning | | County Zoning | 2061555 |
Mechanical | Original | A | 9/16/2024 | DALEH | DALEH | | | Mechanical | 2060567 |
Electrical | Original | A | 9/16/2024 | BERTHA | BERTHA | No revisions. | | Electrical | 2060159 |
Health Dept. | Original | D | 9/13/2024 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted.
Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at https://www.elpasocountyhealth.org/licenses-permits-inspections-water-testing/construction-land-use/construction-activity-permit/. For questions, contact Environmental Health at 719-578-3199 option 3. AM | Amanda Furno | Health Dept. | 2059970 |
Zoning/Planning | Original | / | 9/13/2024 | DSDHOWSER | DSDHOWSER | In Current Review by DSDHOWSER | | Zoning/Planning | 2059758 |
Enumeration | Original | D | 9/13/2024 | AMY | AMY | Provide a copy of the Final Recorded Plat to this Department. Amy@pprbd.org 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2059712 |
Electronic Plan | Original | / | 9/12/2024 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2059646 |
Submittal 6 | Original | / | 9/12/2024 | BRIANNAM | BRIANNAM | Submittal #6 | | Submittal 6 | 2059643 |
Triage | Original | D | 6/6/2024 | QUINTONW | QUINTONW | To allow for resubmittal | | Triage | 2015976 |
Canceled Plans | Original | / | 6/5/2024 | ADMIN | ADMIN | Electronic Plan automatically cancelled due to inactivity. | | Canceled Plans | 2015272 |
Falcon Hazmat (CSFD) | Original | A | 6/5/2023 | CSFIRE | CSFIRE | ***Fee of $1212 to be paid directly to CSFD by calling 719-385-5978, Option 5. Refer to plan review numbers 2022-1860-HM-1 and 2022-1860-HM-2.
***SEPARATE HAZARDOUS MATERIAL PERMITS REQUIRED: The following Processes/Operations require separate permits through the Division of the Fire Marshal, 375 Printers Parkway, Colorado Springs, CO 80910:
Underground Fuel Tanks LPG Cage CO2 Beverage Dispensing System
Submit these plans via https://web1.coloradosprings.gov/ePlan
***You are responsible for reviewing the comments found on the CSFD website for any corrections to be made and/or inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION!
Note that it may take upwards of an hour for the comments to appear. | smitty91 | Falcon Hazmat (CSFD) | 1851956 |
Falcon Fire (CSFD) | Original | A | 6/2/2023 | CSFIRE | CSFIRE | We are pleased to inform you this plan is approved You are responsible for reviewing the APPROVAL comments found on the CSFD website as they contain important inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS! ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | csfdit | Falcon Fire (CSFD) | 1850926 |
Health Dept. | Original | D | 5/26/2023 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review per AF. A pre-operational inspection will be required before final approval for opening is granted.
Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. BR | brothrock | Health Dept. | 1848474 |
Mechanical | Original | D | 5/25/2023 | DALEH | DALEH | No response to previous comments PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1847707 |
County Zoning | Original | D | 5/24/2023 | DSDRANGEL | DSDRANGEL | The site development plan must be approved in EDARP. Upload an approved copy of your site development plan when approved. | | County Zoning | 1847023 |
Enumeration | Original | D | 5/24/2023 | AMY | AMY | See same comments from 3/23/23 PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Enumeration | 1846960 |
Electronic Plan | Original | / | 5/24/2023 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1846954 |
Submittal 5 | Original | / | 5/23/2023 | KALLISTAJ | KALLISTAJ | Submittal #5 | | Submittal 5 | 1846628 |
Falcon Hazmat (CSFD) | Original | D | 5/12/2023 | CSFIRE | CSFIRE | PENDING RECEIPT OF INVENTORY OF CAR WASH CHEMICALS | dwithee | Falcon Hazmat (CSFD) | 1843126 |
Falcon Fire (CSFD) | Original | D | 5/12/2023 | CSFIRE | CSFIRE | (DISAPPROVED) HAZARDOUS MATERIALS:
Provide an inventory list, including their uses and amounts, for all chemicals and/or compressed gases, you indicated Yes to on the HazMat Triage Form. List of chemicals to be categorized according to 2009 IFC Table 105.6.20. SPECIFICALLY CAR WASH CHEMICALS
PLEASE INSURE YOU ANSWER ALL QUESTIONS AT THE BOTTOM OF THE FORMS, AND FILL OUT THE REQUESTED INFORMATION.
All forms and packets are available at https://coloradosprings.gov/hazmat
PROVIDE CHEMICALS USED WITHIN THE CAR WASH! ALL OTHER HAZMAT INFORMATION HAS BEEN PROVIDED. | dwithee | Falcon Fire (CSFD) | 1843125 |
Mechanical | Original | D | 5/10/2023 | DALEH | DALEH | No response to previous comments PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1842019 |
Health Dept. | Original | D | 5/8/2023 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review per AF. A pre-operational inspection will be required before final approval for opening is granted.
Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. TG | tguerrero | Health Dept. | 1840812 |
County Zoning | Original | D | 5/8/2023 | DSDRANGEL | DSDRANGEL | The site development plan must be approved in EDARP. Upload an approved copy of your site development plan when approved. | | County Zoning | 1840631 |
Enumeration | Original | D | 5/8/2023 | AMY | AMY | See comments from 3/23/23, same comments apply. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Enumeration | 1840541 |
Electronic Plan | Original | / | 5/8/2023 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1840538 |
Submittal 4 | Original | / | 5/5/2023 | SIERRAC | SIERRAC | Submittal #4 | | Submittal 4 | 1840408 |
Falcon Hazmat (CSFD) | Original | D | 4/3/2023 | CSFIRE | CSFIRE | pending receipt of hazmat triage form for car wash | dwithee | Falcon Hazmat (CSFD) | 1824833 |
Falcon Fire (CSFD) | Original | D | 4/3/2023 | CSFIRE | CSFIRE | Walk OK
CAR Wash(DISAPPROVED) HAZARDOUS MATERIALS:
Provide completed Hazarous Materials Operations Triage form for all Use/Dispensing/Storage of Hazardous Materials and Flammable Liquids that will be used within this facility.
Provide an inventory list, including their uses and amounts, for all chemicals and/or compressed gases, you indicated Yes to on the HazMat Triage Form. List of chemicals to be categorized according to 2009 IFC Table 105.6.20.
PLEASE INSURE YOU ANSWER ALL QUESTIONS AT THE BOTTOM OF THE FORMS, AND FILL OUT THE REQUESTED INFORMATION.
All forms and packets are available at https://coloradosprings.gov/hazmat
I am unable to approve the c-store since it is part of the same plan submittal as car wash which is still missing info | csfdit | Falcon Fire (CSFD) | 1824824 |
Plumbing | Original | A | 3/28/2023 | SHANEN | SHANEN | | | Plumbing | 1821343 |
County Zoning | Original | D | 3/27/2023 | DSDRANGEL | DSDRANGEL | The site development plan is not yet approved. Once it is approved upload a copy of the approved site development plan. | | County Zoning | 1821064 |
Plumbing | Original | D | 3/24/2023 | SHANEN | SHANEN | Pending completed drinking fountain alternate. Fee must be paid prior to processing. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plumbing | 1820516 |
County Waste Water | Original | D | 3/24/2023 | CSUREVIEW | CSUREVIEW | Not in Colorado Springs Utilities wastewater service territory. CJS | cjsavage | County Waste Water | 1820419 |
County Water | Original | D | 3/24/2023 | CSUREVIEW | CSUREVIEW | Not in Colorado Springs Utilities water service territory. CJS | cjsavage | County Water | 1820418 |
Health Dept. | Original | D | 3/24/2023 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted.
Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. AF | Amanda Furno | Health Dept. | 1820373 |
Mechanical | Original | D | 3/24/2023 | DALEH | DALEH | Still need to provide a Mechanical site plan showing complete gas routing from car wash to main building meter location. Show meter location on main building PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1820305 |
Construction | Original | A | 3/24/2023 | BPHILLIPS | BPHILLIPS | | | Construction | 1820243 |
Electronic Plan | Original | / | 3/23/2023 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1820178 |
Enumeration | Original | D | 3/23/2023 | AMY | AMY | 1. FINAL PLAT IS PENDING: a. . Enumerations will review the mylar prior to plat for address placement, street names, and title block. b. A $10.00 per lot and tract platting fee will be due at the time of the review of the mylar, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of September 28th, 2022, an additional over the phone transaction fee of 2.95% of the total transaction will apply for any credit card payment. c. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Amy@pprbd.org; d. Mylar reviews can be reviewed via “pdf”. The mylar will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations receiving payment. If you would like an in-person review, please make an appointment on our website. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Enumeration | 1820099 |
Electronic Plan | Original | / | 3/23/2023 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1820085 |
Submittal 3 | Original | / | 3/23/2023 | SIERRAC | SIERRAC | Submittal #3 | | Submittal 3 | 1819913 |
Falcon Fire (CSFD) | Original | D | 2/27/2023 | CSFIRE | CSFIRE | Walk OK
(DISAPPROVED) COMPRESSED GASSES - CARBON DIOXIDE, NITROGEN, OXYGEN, ETC
It appears that a compressed gas will be used in this facility. Prior to approval of these plans we will need a compressed gas questionnaire completed, signed, dated, and returned with construction set of plans.
You can access this form on our website. https://coloradosprings.gov/fire-department | dwithee | Falcon Fire (CSFD) | 1807373 |
Falcon Fire (CSFD) | Original | / | 2/27/2023 | CSFIRE | CSFIRE | | dwithee | Falcon Fire (CSFD) | 1807372 |
Falcon Fire (CSFD) | Original | D | 2/24/2023 | CSFIRE | CSFIRE | Disapproved per applicant request | Jacob.Watson | Falcon Fire (CSFD) | 1807100 |
Falcon Hazmat (CSFD) | Original | D | 2/24/2023 | CSFIRE | CSFIRE | Disapproved per applicant request | Jacob.Watson | Falcon Hazmat (CSFD) | 1807098 |
Electrical | Original | A | 2/10/2023 | SHELBY | SHELBY | | | Electrical | 1801579 |
Electronic Plan | Original | / | 2/10/2023 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1801575 |
Mechanical | Original | D | 2/7/2023 | DALEH | DALEH | Provide a Mechanical site plan showing complete underground gas pipe routing form car wash to main building meter PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1800313 |
County Zoning | Original | D | 2/7/2023 | DSDRANGEL | DSDRANGEL | Final Plat must be recorded prior to site development plan approval. Once site development plan is approved upload a copy of the approved site development plan. | | County Zoning | 1800229 |
Plumbing | Original | D | 2/6/2023 | SHANEN | SHANEN | P1.1: Provide roof drain and overflow scupper through the wall opening dimensions (W x H) as only the height is provided on referenced sheet A8.3. P1.2 DFU for grease trap: Reference 2018 IPC code sections. P1.3: Alternate materials and methods application form required to provide drinking water from an accessible height counter mounted beverage dispenser in lieu of required high/low drinking fountain.See link. https://www.pprbd.org/Downloads/Permit/Alternate_M%20AND%20M.pdf Provide cut sheets to show beverage dispenser is ANSI A117.1 compliant. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plumbing | 1799426 |
County Water | Original | D | 2/6/2023 | CSUREVIEW | CSUREVIEW | Not in Colorado Springs Utilities water service territory. CJS | cjsavage | County Water | 1799328 |
County Waste Water | Original | D | 2/6/2023 | CSUREVIEW | CSUREVIEW | Not in Colorado Springs Utilities wastewater service territory. CJS | cjsavage | County Waste Water | 1799326 |
Health Dept. | Original | D | 2/6/2023 | HEALTHDEPT | HEALTHDEPT | Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. CM | cmille96 | Health Dept. | 1799325 |
Construction | Original | D | 2/6/2023 | BPHILLIPS | BPHILLIPS | Received Comcheck for car wash building, but now the previously submitted Comcheck form is missing for the convenience store. Upon resubmittal, provide both of these documents for review. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1799305 |
Electronic Plan | Original | / | 2/6/2023 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1799254 |
Enumeration | Original | D | 2/6/2023 | AMY | AMY | 1.The Hazmat document Fire Flow Report has the incorrect address. 2. Enumerations approval is pending Final Plat Comments, see prior review comments.
PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Enumeration | 1799039 |
Electronic Plan | Original | / | 2/6/2023 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1799037 |
Submittal 2 | Original | / | 2/3/2023 | KALLISTAJ | KALLISTAJ | Submittal #2 | | Submittal 2 | 1798792 |
Health Dept. | Original | D | 12/15/2022 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted.
Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. AF | Amanda Furno | Health Dept. | 1782544 |
Mechanical | Original | D | 12/2/2022 | DALEH | DALEH | Remove outlines of RTU's from floor plans only show locations of duct drops Show all new work in bold line weight Smoke damper on roof ? Combine sheets CW into the M sheets Do not provide separate roof plans and separate duct layout plans Do not provide two separate gas piping drawings combine all into one gas plan The complete Mechanical design to be shown on one plan Do not provide two floor plans showing different scopes of work See plans for better clarity to comments PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Mechanical | 1777490 |
Falcon Fire (CSFD) | Original | D | 11/30/2022 | CSFIRE | CSFIRE | You are responsible for reviewing the DISAPPROVAL comments found on the CSFD website and responding to them in your resubmittal: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – COMMENTS ARE AVAILABLE FOR ONLY 30 DAYS! | rpeterson | Falcon Fire (CSFD) | 1776297 |
Falcon Hazmat (CSFD) | Original | D | 11/30/2022 | CSFIRE | CSFIRE | | rpeterson | Falcon Hazmat (CSFD) | 1776296 |
Electrical | Original | D | 11/28/2022 | SHELBY | SHELBY | 1. Include refrigeration and cooling equipment on fault schedule. 2. Show SCCR and SCA as appropriate on fault schedule. See https://www.pprbd.org/File/Resources/Downloads/CommercialHandout/Com%20Elect%20reqs%202020%20NEC.pdf for fault current terms and methodologies. 3. Include manufacturers list of series rated components. 4. Include column seal off access detail. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Electrical | 1775598 |
Health Dept. | Original | D | 11/23/2022 | HEALTHDEPT | HEALTHDEPT | Retail food establishment plan review is in process and not yet approved.
Construction activity permit required for projects earthmoving > 1 acre. If the entire project is > 1 acre earthmoving, regardless of being submitted in phases and/or separate building permits, a construction activity permit will be required. Information and application may be accessed online at: https://www.elpasocountyhealth.org/service/air-quality/construction-activity-application. Please email application and all required documents to healthinfo@elpasoco.com.
For questions, contact Environmental Health at 719-578-3199 option 3. AB | abrannon | Health Dept. | 1775043 |
Electronic Plan | Original | / | 11/23/2022 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1775014 |
County Zoning | Original | D | 11/21/2022 | DSDRANGEL | DSDRANGEL | The site development plan is not approved in EDARP yet. Please upload the approved SDP once received. | | County Zoning | 1773347 |
Plumbing | Original | D | 11/18/2022 | SHANEN | SHANEN | All gas piping related items shall be on the mechanical plans. Remove all references to gas piping from the plumbing plans. P1.1: Reference 2018 IPC. Plumbing roof plan must show compliance with section 1108 Secondary (emergency) roof drains. Architectural plans indicate overflow scuppers. Show the location of each overflow scupper and provide the opening dimensions. P1.1.1: Embolden kitchen equipment tags for clarity. Discharge plumbing fixtures in prep area to the grease waste. P1.1.2: Show water service extending beyond the exterior of the building. Exposed water service piping is strictly limited upstream of the water meter/backflow preventer. Water service entry shall comply with section 606.1. Water service piping installed in exterior wall shall show compliance with section 305.4 Freezing. PPRBD note: In this jurisdiction all water lines subject to freezing conditions require both insulation and heat. Embolden text for clarity in the RPZ assembly detail. P1.2: Show water pipe sizing for each branch, each section and to each fixture. Show DWV sizing for each branch, each section and to each fixture. P1.3: Occupancy type and occupant load requires a drinking fountain. Alternate materials and methods application form required to provide drinking water from an accessible height counter mounted beverage dispenser in lieu of required drinking fountain. See link.https://www.pprbd.org/Downloads/Permit/Alternate_M%20AND%20M.pdfProvide cut sheets to show beverage dispenser is ANSI A117.1 compliant.Remove drinking fountain from the fixture schedule or show it on the plumbing plans. P2.0-CW: Water service size and entry location does not match the civil drawings. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Plumbing | 1773027 |
Zoning/Planning | Original | / | 11/17/2022 | DSDRANGEL | DSDRANGEL | In Current Review by DSDRANGEL | | Zoning/Planning | 1772617 |
County Water | Original | D | 11/17/2022 | CSUREVIEW | CSUREVIEW | Not in Colorado Springs Utilities water service territory. mjg | mgackle | County Water | 1772432 |
County Waste Water | Original | D | 11/17/2022 | CSUREVIEW | CSUREVIEW | Not in Colorado Springs Utilities wastewater service territory. mjg | mgackle | County Waste Water | 1772430 |
Gas/Elec. Utils | Original | A | 11/17/2022 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. mjg | mgackle | Gas/Elec. Utils | 1772428 |
Construction | Original | D | 11/17/2022 | BPHILLIPS | BPHILLIPS | Revise code references where noted by reviewer. Revise wind speed design to 130 mph (Vult) where noted on structural sheets. Provide IECC/ Comcheck for car wash building. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Construction | 1772415 |
Electronic Plan | Original | / | 11/16/2022 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 1771980 |
Elevators | Original | N | 11/14/2022 | ERIC | ERIC | No conveyance | | Elevators | 1769859 |
Enumeration | Original | D | 11/14/2022 | AMY | AMY | 1. FINAL PLAT IS PENDING: a. . Enumerations will review the mylar prior to plat for address placement, street names, and title block. b. A $10.00 per lot and tract platting fee will be due at the time of the review of the mylar, (two addresses per lot and tract). If an address is not needed on a tract then no fee applies. Check should be made out to PIKES PEAK REGIONAL BUILDING DEPARTMENT or PPRBD. Paid directly to the Enumerations Department. As of September 28th, 2022, an additional over the phone transaction fee of 2.95% of the total transaction will apply for any credit card payment. c. A copy of the final recorded plat is required prior to plan submittal for RESIDENTIAL. A copy of the final recorded plat is required prior to approval in the Enumerations department on any COMMERCIAL plan submittal. Amy@pprbd.org; d. Mylar reviews can be reviewed via “pdf”. The mylar will be stamped by Enumerations for accuracy and returned to the applicant and the planner. All payments to be mailed to RBD via a check or credit card payment over the phone. Plats should not be recorded prior to Enumerations receiving payment. If you would like an in-person review, please make an appointment on our website. 2. NOTE: Official Address change has been completed from 11769 E Hwy 24 to 6970 Meridian Sol Drive. Official street name change completed by El Paso County Public Works from Meridian Road to Meridian Sol Drive. 3. NOTE-1 PLAN 3 PERMITS ARE REQUIRED. PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Enumeration | 1769740 |
Enumeration | Original | D | 11/14/2022 | AMY | AMY | PLEASE NOTE - THE DISAPPROVAL COMMENTS ABOVE MAY NOT REPRESENT THE COMPLETE LIST OF CORRECTIONS REQUIRED ON THE PLAN 1. FOR ELECTRONIC SUBMITTALS, A "PROGRESS SET" IS NOW AVAILABLE FOR REVIEW OF REQUIRED CORRECTIONS. 2. FOR ALL SUBMITTALS, A "REVIEW SET" WILL BE AVAILABLE UPON COMPLETION OF ALL DEPARTMENT REVIEWS. 3. PLANS CANNOT BE RE-SUBMITTED UNTIL EVERY DEPARTMENT HAS COMPLETED THIS CURRENT ROUND OF REVIEW. | | Enumeration | 1769739 |
Electronic Plan | Original | / | 11/14/2022 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1769737 |
Plumbing | Original | / | 11/10/2022 | ANDREAL | ANDREAL | Overtime approved for Plumbing by Sofia Hernandez | | Plumbing | 1769248 |
Mechanical | Original | / | 11/10/2022 | ANDREAL | ANDREAL | Overtime approved for Mechanical by Sofia Hernandez | | Mechanical | 1769247 |
Electrical | Original | / | 11/10/2022 | ANDREAL | ANDREAL | Overtime approved for Electrical by Sofia Hernandez | | Electrical | 1769246 |
Elevators | Original | / | 11/10/2022 | ANDREAL | ANDREAL | Overtime approved for Elevators by Sofia Hernandez | | Elevators | 1769245 |
Construction | Original | / | 11/10/2022 | ANDREAL | ANDREAL | Overtime approved for Construction by Sofia Hernandez | | Construction | 1769244 |
Enumeration | Original | / | 11/10/2022 | ANDREAL | ANDREAL | Overtime approved for Enumeration by Sofia Hernandez | | Enumeration | 1769243 |
Floodplain | Original | N | 11/10/2022 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5312402016) | | Floodplain | 1769242 |