Monument Zoning | Original | A | 10/3/2023 | TOWNOFMON | TOWNOFMON | Plan conditionally approved by Town of Monument. Permit Fees are due within 10 days of permit authorization. Note that no final Monument Inspection for C/O can be completed unless all permit fees are paid, Development items/requests are completed and inspection requirements are met which could include the Monument Water Department. Any change to the approved plot plan or variations in the model as depicted on the plot plan requires a plot plan modification and re-review. For more information you may email the Planning Department at planning@tomgov.org. Thank you | Rey Medina | Monument Zoning | 1908275 |
Energy | Original | A | 8/28/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1891286 |
Electrical | Original | A | 8/28/2023 | SHELBY | SHELBY | | | Electrical | 1891285 |
Electronic Plan | Original | / | 8/28/2023 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1891276 |
Enumeration | Original | A | 8/23/2023 | BRENT | BRENT | | | Enumeration | 1889357 |
Electronic Plan | Original | / | 8/23/2023 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1889349 |
Energy | Original | / | 8/23/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1888805 |
Submittal 2 | Original | / | 8/23/2023 | SIERRAC | SIERRAC | Submittal #2: Pushed through per Shelby E. | | Submittal 2 | 1888804 |
Monument Zoning | Original | D | 5/31/2023 | TOWNOFMON | TOWNOFMON | DECLINED-This project is not completed in Planning yet. Cannot review without all of the items needed for the Development project. | lukejameskerr | Monument Zoning | 1849178 |
Energy | Original | A | 5/25/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1848093 |
Electrical | Original | A | 5/25/2023 | SHELBY | SHELBY | | | Electrical | 1848092 |
Electronic Plan | Original | / | 5/25/2023 | SHELBY | SHELBY | In Current Review by SHELBY | | Electronic Plan | 1848091 |
Tri-Lakes Fire (CSFD) | Original | A | 5/25/2023 | CSFIRE | CSFIRE | You are responsible for reviewing the APPROVAL comments found on the CSFD website as they contain important inspection information: https://web1.coloradosprings.gov/PreventionPlanReview/FPS_WebFPS.asp
PLEASE ALLOW UP TO AN HOUR FOR COMMENTS TO LOAD TO THE SERVERS – NOTE COMMENTS ARE AVAILABLE FOR 30 DAYS! ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | Jacob.Watson | Tri-Lakes Fire (CSFD) | 1847938 |
Construction | Original | N | 5/24/2023 | SHELLEY | SHELLEY | No construction work. EV chargers. | | Construction | 1847410 |
Enumeration | Original | A | 5/19/2023 | BRENT | BRENT | | | Enumeration | 1845663 |
Electronic Plan | Original | / | 5/19/2023 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1845612 |
Energy | Original | / | 5/17/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1844735 |
Floodplain | Original | N | 5/17/2023 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7125301003) | | Floodplain | 1844733 |