Enumeration | Original | N | 8/30/2023 | AMY | AMY | 2218, 2220, 2224, 2226 E WILLAMETTE. | | Enumeration | 1893261 |
Finished Bin (North) | Original | / | 8/30/2023 | | SCANNING | Location = Finished Bin (North) by SCANNING | | Finished Bin (North) | 1893227 |
Plan Coordinator (North) | Original | / | 8/30/2023 | | RICHG | Location = Plan Coordinator (North) by RICHG | | Plan Coordinator (North) | 1893208 |
Energy | Original | A | 8/30/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1893207 |
Electrical | Original | A | 8/30/2023 | RICHG | RICHG | | | Electrical | 1893206 |
Energy | Original | / | 8/30/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1893205 |
Enumeration | Original | N | 8/30/2023 | AMY | AMY | 1 plan 4 permits -4 new meters. | | Enumeration | 1893145 |
Energy | Original | D | 8/17/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1886326 |
Electrical | Original | D | 8/17/2023 | DANIELG | DANIELG | 1. Provide code study.
2. Provide site-plan.
3. Provide fault current information.
4. Provide company letterhead on the one-line diagram. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1886325 |
Enumeration | Original | D | 8/17/2023 | BRENT | BRENT | Needs a site plan and code study form 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 1886308 |
Out to Review | Original | / | 8/17/2023 | AMYP | AMYP | ian walking | | Out to Review | 1886267 |
Energy | Original | / | 8/17/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1886265 |
Floodplain | Original | N | 8/17/2023 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6409326012) | | Floodplain | 1886264 |