Fountain Fire | Splice 09/18/25 | A | 9/23/2025 | CSFIRE | CSFIRE | Splice dated 9.18.25 approved for clouded Arch/MEP revs.
This review is limited to areas clouded and/or indicated as changed. Permit release for this splice does not include other plan elements even if revised from prior submissions. All revisions shall be code compliant and are subject to final inspection. | phil.valdez | Fountain Fire | 2214705 |
Electrical | Splice 09/18/25 | A | 9/23/2025 | DANIELG | DANIELG | | | Electrical | 2214673 |
Plumbing | Splice 09/18/25 | A | 9/22/2025 | TCRIPPEN | TCRIPPEN | Approved:See clouded areas | | Plumbing | 2214428 |
Mechanical | Splice 09/18/25 | A | 9/22/2025 | TCRIPPEN | TCRIPPEN | Approved:Shifted RCU5 Cases | | Mechanical | 2214418 |
Construction | Splice 09/18/25 | A | 9/22/2025 | DANM | DANM | Minor revisions throughout architectural drawings | | Construction | 2213990 |
Electronic Plan | Splice 09/18/25 | / | 9/18/2025 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 2213178 |
Fountain Fire | Splice 08/07/25 | A | 8/11/2025 | CSFIRE | CSFIRE | Splice dated 8.7.25 approved for clouded revs.
FIRE PROTECTION SYSTEM PLANS NOT REVIEWED There were fire protection system plans attached to the construction plans, however, they were not reviewed due to lack of specification sheets, calculations, etc. The subcontractor for these systems must submit these plans for our review and obtain separate permits from the CSFD for the installation of said systems. No work is allowed to begin without proper permits | phil.valdez | Fountain Fire | 2195809 |
EPC Health Dept | Splice 08/07/25 | A | 8/11/2025 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. MT | mtemple | EPC Health Dept | 2195724 |
Construction | Splice 08/07/25 | A | 8/8/2025 | DANM | DANM | Minor revisions on architectural | | Construction | 2195206 |
Electronic Plan | Splice 08/07/25 | / | 8/8/2025 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 2195181 |
Fountain Zoning | Splice 05/12/25 | A | 7/11/2025 | ZONINGF | ZONINGF | Splice approved. use tax previously paid. KM | KMartinez | Fountain Zoning | 2183391 |
Electrical | Splice 05/12/25 | A | 5/13/2025 | DANIELG | DANIELG | | | Electrical | 2157964 |
Plumbing | Splice 05/12/25 | A | 5/13/2025 | SHANEN | SHANEN | Revised sheet P1, P1.2 and P3. | | Plumbing | 2157959 |
Construction | Splice 05/12/25 | A | 5/13/2025 | DANM | DANM | minor architectural and structural revisions including installation of trench drain | | Construction | 2157929 |
Construction | Original | A | 12/17/2024 | DANM | DANM | | | Construction | 2099599 |
Energy | Original | A | 12/17/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2099600 |
Electronic Plan | Original | / | 12/17/2024 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 2099598 |
| Original | / | 12/16/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2099553 |
Fountain Zoning | Original | A | 12/16/2024 | ZONINGF | ZONINGF | Ok to release for permitting. Use tax 24-078F. KM | KMartinez | Fountain Zoning | 2099004 |
| Original | / | 12/13/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2098836 |
Energy | Original | / | 12/13/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2098835 |
Submittal 5 | Original | / | 12/13/2024 | SIERRAC | SIERRAC | Submittal #5 | | Submittal 5 | 2098834 |
Fountain Zoning | Original | D | 12/12/2024 | ZONINGF | ZONINGF | Applicant must upload City of Fountain stamped approved plans. KM | KMartinez | Fountain Zoning | 2098130 |
Zoning/Planning | Original | / | 1/23/2024 | SYSTEM | SYSTEM | Contact Zoning/Planning department for approval prior to permit | | Zoning/Planning | 1954072 |
Security Water | Original | A | 1/23/2024 | SECURITYWSD | SECURITYWSD | | b.bernard-swsd | Security Water | 1954003 |
Energy | Original | A | 1/22/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1953740 |
Electrical | Original | A | 1/22/2024 | DANIELG | DANIELG | | | Electrical | 1953739 |
Mechanical | Original | A | 1/22/2024 | JUSTINC | JUSTINC | | | Mechanical | 1953657 |
Plumbing | Original | A | 1/22/2024 | SHANEN | SHANEN | | | Plumbing | 1953651 |
| Original | / | 1/22/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 1953600 |
| Original | / | 1/22/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 1953575 |
Submittal 4 | Original | / | 1/22/2024 | BRIANNAM | BRIANNAM | Submittal #4 | | Submittal 4 | 1953574 |
Security Water | Original | D | 1/16/2024 | SECURITYWSD | SECURITYWSD | Please update the Utility Trench and Bedding drawings to Security Water District's specification. | b.bernard-swsd | Security Water | 1951577 |
Energy | Original | D | 1/2/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1946135 |
Plumbing | Original | D | 1/2/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 1946134 |
Electrical | Original | D | 12/27/2023 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1944340 |
Electronic Plan | Original | / | 12/27/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1944305 |
Mechanical | Original | A | 12/21/2023 | JUSTINC | JUSTINC | | | Mechanical | 1943759 |
Construction | Original | A | 12/21/2023 | DANM | DANM | | | Construction | 1943728 |
Electronic Plan | Original | / | 12/21/2023 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1943719 |
| Original | / | 12/21/2023 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 1943562 |
| Original | / | 12/20/2023 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 1943204 |
Submittal 3 | Original | / | 12/20/2023 | BRIANNAM | BRIANNAM | Submittal #3 | | Submittal 3 | 1943203 |
Security Water | Original | D | 11/21/2023 | SECURITYWSD | SECURITYWSD | Please update the revised water main drawings for approval. | b.bernard-swsd | Security Water | 1930944 |
Energy | Original | D | 11/9/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1926306 |
Electrical | Original | D | 11/9/2023 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1926305 |
Electronic Plan | Original | / | 11/9/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1926278 |
Construction | Original | A | 11/8/2023 | DANM | DANM | | | Construction | 1925653 |
Electronic Plan | Original | / | 11/8/2023 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1925582 |
Submittal 2 | Original | / | 11/8/2023 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 1925257 |
Health Dept. | Original | A | 11/3/2023 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. MT | mtemple | Health Dept. | 1922917 |
Security Water | Original | D | 9/28/2023 | SECURITYWSD | SECURITYWSD | Utility Plan needs to reference Security Water District and not CSU. I've also emailed the engineers with other recommendations. | b.bernard-swsd | Security Water | 1906017 |
Security Waste Water | Original | A | 9/28/2023 | SECURITYWSD | SECURITYWSD | | b.bernard-swsd | Security Waste Water | 1906003 |
Electrical | Original | D | 9/25/2023 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 1903940 |
Energy | Original | D | 9/25/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1903941 |
Electronic Plan | Original | / | 9/25/2023 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 1903902 |
Plumbing | Original | A | 9/18/2023 | SHANEN | SHANEN | | | Plumbing | 1900739 |
Fountain Fire | Original | A | 9/18/2023 | FNTNFIRE | FNTNFIRE | Fountain FD approves. All fire protection systems, to include fire line, require submittal to FD. See Fountain FD Website for more information. | mgates | Fountain Fire | 1900737 |
Health Dept. | Original | D | 9/14/2023 | HEALTHDEPT | HEALTHDEPT | Retail food establishment plan review required. Information and application may be accessed online at https://www.elpasocountyhealth.org/service/retail-food-establishment-licensing-0. Please email application and all required documents to healthinfo@elpasoco.com. For questions, contact Environmental Health at 719-578-3199 option 3. MT | mtemple | Health Dept. | 1899718 |
Mechanical | Original | A | 9/14/2023 | JUSTINC | JUSTINC | | | Mechanical | 1899629 |
Construction | Original | D | 9/13/2023 | DANM | DANM | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1899438 |
Energy | Original | / | 9/13/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1899273 |
Electronic Plan | Original | / | 9/13/2023 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1899018 |
Enumeration | Original | N | 9/7/2023 | BECKYA | BECKYA | | | Enumeration | 1896719 |
Electronic Plan | Original | / | 9/7/2023 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1896713 |
Zoning/Planning | Original | / | 9/1/2023 | SYSTEM | SYSTEM | You will need to contact Zoning/Planning department for approval prior to permit. This department will not review the plan electronically. | | Zoning/Planning | 1894368 |
Energy | Original | / | 9/1/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1894367 |
Floodplain | Original | N | 9/1/2023 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6513314014) | | Floodplain | 1894366 |