CO Springs Fire | Original | D | 11/16/2023 | CSFIRE | CSFIRE | INCOMPLETE SUBMITTAL
WALK OK – See our “Virtual” Walk Through process here: https://coloradosprings.gov/fire-department/page/plan-and-construction-review-status | dwithee | CO Springs Fire | 1929484 |
CO Springs Hazmat | Original | N | 11/16/2023 | CSFIRE | CSFIRE | | dwithee | CO Springs Hazmat | 1929481 |
Energy | Original | D | 11/9/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1926336 |
Plumbing | Original | D | 11/9/2023 | SHANEN | SHANEN | B occupancy with an occupant load of 23 requires compliance with section 403.1 Minimum number of fixtures. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 1926335 |
CO Springs DRE | Original | D | 11/9/2023 | MOBRIEN | MOBRIEN | Modification to existing development plan may be required for scope of changes. Please request a pre-application meeting here: coloradosprings.gov/preapp | | CO Springs DRE | 1926053 |
Zoning/Planning | Original | / | 11/8/2023 | MOBRIEN | MOBRIEN | In Current Review by MOBRIEN | | Zoning/Planning | 1925587 |
CSU Water | Original | N | 11/8/2023 | CSUREVIEW | CSUREVIEW | No apparent conflicts. SSM | stefanm | CSU Water | 1925549 |
CSU Waste Water | Original | N | 11/8/2023 | CSUREVIEW | CSUREVIEW | No apparent conflicts. SSM | stefanm | CSU Waste Water | 1925547 |
Mechanical | Original | N | 11/8/2023 | JUSTINC | JUSTINC | | | Mechanical | 1925415 |
Electrical | Original | N | 11/8/2023 | BERTHA | BERTHA | | | Electrical | 1925380 |
Electronic Plan | Original | / | 11/8/2023 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 1925377 |
Construction | Original | D | 11/8/2023 | DANM | DANM | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 1925350 |
Electronic Plan | Original | / | 11/8/2023 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 1925313 |
Enumeration | Original | D | 11/6/2023 | AMY | AMY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 1923431 |
Electronic Plan | Original | / | 11/6/2023 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 1923423 |
Energy | Original | / | 11/2/2023 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1922348 |
Floodplain | Original | N | 11/2/2023 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6419127001) | | Floodplain | 1922345 |