Required Departments: 3
|
|
|
Log Entries: 2
|
|
CO Springs DRE | Original | D | 2/23/2024 | KSCHMITT | KSCHMITT | Denied New Construction Sign Applications not ready for review prior to site development:
Thank you for your submittal. Formal review of application requires structural framing of walls and all buildings in the construction phase on the development prior to permitting. Upon inspection site is currently in the grading phase of construction. In addition, all site plans require a minimum of (2) indicated setback dimensions identifying the location of all ground and freestanding signage. Sign plan #2 does not reflect the site plan set backs included in the site plan as these are indicated as sign #3.
Please contact this department if you have any questions. Thank you. 719-385-5072 | | CO Springs DRE | 1967047 | Zoning/Planning | Original | / | 2/16/2024 | KSCHMITT | KSCHMITT | In Current Review by KSCHMITT | | Zoning/Planning | 1964814 |
|
| |
|