Energy | Original | A | 5/24/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2011250 |
Construction | Original | N | 5/24/2024 | DANM | DANM | As noted previously: Fixture and finish replacements only. No reconfiguration of space. | | Construction | 2011249 |
Electronic Plan | Original | / | 5/24/2024 | DANM | DANM | In Current Review by DANM | | Electronic Plan | 2011245 |
Enumeration | Original | N | 5/24/2024 | BRENT | BRENT | | | Enumeration | 2011158 |
Electronic Plan | Original | / | 5/24/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2011152 |
| Original | / | 5/24/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2010863 |
| Original | / | 5/24/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2010819 |
Energy | Original | / | 5/24/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2010818 |
Submittal 3 | Original | / | 5/24/2024 | SIERRAC | SIERRAC | Submittal #3 | | Submittal 3 | 2010817 |
Energy | Original | A | 5/16/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2005139 |
Construction | Original | N | 5/16/2024 | DANM | DANM | As noted previously: Fixture and finish replacements only. No reconfiguration of space. | | Construction | 2005138 |
Enumeration | Original | D | 5/16/2024 | BRENT | BRENT | The note on the key plan on page A0.0 states that the "area of remodel to become part of Suite 250", implying that it is not a part of Suite 250 now. I did not find any permit history combining Suites 200 and 250. Update plan pages to show current suite number for this plan. Show all tenant suite numbers on this key plan. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2004925 |
Electronic Plan | Original | / | 5/16/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2004897 |
Energy | Original | / | 5/15/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2004598 |
Submittal 2 | Original | / | 5/15/2024 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 2004597 |
CO Springs Fire | Original | N | 5/6/2024 | CSFIRE | CSFIRE | No Fire Final | Jacob.Watson | CO Springs Fire | 1998943 |
CO Springs Hazmat | Original | N | 5/6/2024 | CSFIRE | CSFIRE | No Fire Final | Jacob.Watson | CO Springs Hazmat | 1998942 |
Energy | Original | A | 4/30/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1996171 |
Electrical | Original | A | 4/30/2024 | BERTHA | BERTHA | | | Electrical | 1996170 |
Electronic Plan | Original | / | 4/30/2024 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 1996132 |
Plumbing | Original | A | 4/26/2024 | SHANEN | SHANEN | | | Plumbing | 1995005 |
Mechanical | Original | A | 4/25/2024 | DALEH | DALEH | | | Mechanical | 1994365 |
CO Springs DRE | Original | N | 4/18/2024 | CHUDSPETH | CHUDSPETH | Interior commercial remodel, no change of use or occupancy. Restroom remodel | | CO Springs DRE | 1991027 |
Zoning/Planning | Original | / | 4/18/2024 | CHUDSPETH | CHUDSPETH | In Current Review by CHUDSPETH | | Zoning/Planning | 1991016 |
CSU Water | Original | N | 4/18/2024 | CSUREVIEW | CSUREVIEW | No new water service outside of building. mjg | mgackle | CSU Water | 1990904 |
CSU Waste Water | Original | N | 4/18/2024 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. mjg | mgackle | CSU Waste Water | 1990902 |
Construction | Original | N | 4/18/2024 | SHELLEY | SHELLEY | Fixture and finish replacements only. No reconfiguration of space. | | Construction | 1990762 |
Electronic Plan | Original | / | 4/17/2024 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 1990611 |
Enumeration | Original | D | 4/17/2024 | BRENT | BRENT | This scope of work looks to be in Suite 200. Verify suite number and update all places where the address is shown to show the suite number, including the code study form. Show suite numbers for all tenant spaces shown on all key plan diagrams in this plan. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 1990570 |
Electronic Plan | Original | / | 4/17/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 1990558 |
Energy | Original | / | 4/16/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 1989594 |
Floodplain | Original | N | 4/16/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6228009004) | | Floodplain | 1989593 |