Electrical | Original | N | 7/10/2024 | DANIELG | DANIELG | | | Electrical | 2030360 |
CO Springs DRE | Original | A | 7/10/2024 | MAMBUUL | MAMBUUL | Approved for cell tower equipment modifications. See previous approval comments. | | CO Springs DRE | 2030345 |
Zoning/Planning | Original | / | 7/9/2024 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2029721 |
Zoning/Planning | Original | / | 7/8/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2029449 |
Construction | Original | N | 7/8/2024 | BPHILLIPS | BPHILLIPS | | | Construction | 2029374 |
Enumeration | Original | A | 7/8/2024 | BECKYA | BECKYA | | | Enumeration | 2028919 |
Submittal 2 | Original | / | 7/8/2024 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 2028915 |
CO Springs Hazmat | Original | N | 7/5/2024 | CSFIRE | CSFIRE | Simple battey swap N/A Submitted By: Stanwood, Mark Antone,Submitted By: Stanwood, Mark Antone DFM-C-ES-24-00004 (see full review) | mark.stanwood@colora | CO Springs Hazmat | 2028637 |
CO Springs Fire | Original | N | 7/1/2024 | CSFIRE | CSFIRE | | chiptaylor | CO Springs Fire | 2026715 |
CO Springs DRE | Original | A | 6/10/2024 | SSADLER | SSADLER | Approved for cell tower equipment modifications | | CO Springs DRE | 2017230 |
Electrical | Original | N | 6/6/2024 | DANIELG | DANIELG | No electrical scope of work. | | Electrical | 2016465 |
Electronic Plan | Original | / | 6/6/2024 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2016462 |
Zoning/Planning | Original | / | 6/6/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2016194 |
Mechanical | Original | N | 6/6/2024 | TREVORH | TREVORH | Not Applicable; | | Mechanical | 2016164 |
Construction | Original | N | 6/6/2024 | BPHILLIPS | BPHILLIPS | | | Construction | 2015871 |
Electronic Plan | Original | / | 6/5/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2015596 |
Enumeration | Original | D | 6/3/2024 | BECKYA | BECKYA | Each carrier on a tower is assigned a separate address. The new address for Verizon is 1513 Pecan Street, Unit D. Please change all pages to this address.
Also, this is a new carrier attaching to an existing tower but the carrier is new; therefore, this is not a modification plan. Description has been changed to New Cell Site. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2014148 |
Electronic Plan | Original | / | 6/3/2024 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2014138 |
Energy | Original | N | 5/31/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2013760 |
Floodplain | Original | N | 5/31/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 7414301027) | | Floodplain | 2013759 |