CO Springs DRE | Original | D | 11/26/2024 | MAMBUUL | MAMBUUL | 1. Need to provide financial assurances for private improvements such as proposed ADA ramps and parking lot. Plans have been stamped and may be approved once financial assurances are in place. Plans are consistent will approved plan set for minor modification stamped by land use review. No CDI fees due. Cafeteria is to be used a break room with no sales for food to public. | | CO Springs DRE | 2090300 |
CO Springs DRE | Original | D | 11/26/2024 | MAMBUUL | MAMBUUL | 1. Need to provide financial assurances for private improvements such as proposed ADA ramps and parking lot. Plans have been stamped and may be approved once financial assurances are in place. Plans are consistent will approved plan set for minor modification stamped by land use review. No CDI fees due. Cafeteria is to be used a break room with no sales for food to public. | | CO Springs DRE | 2090239 |
Zoning/Planning | Original | / | 11/25/2024 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2089241 |
Energy | Original | A | 11/22/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2089088 |
Construction | Original | A | 11/22/2024 | SHELLEY | SHELLEY | | | Construction | 2089087 |
| Original | / | 11/21/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2088570 |
Submittal 5 | Original | / | 11/21/2024 | SIERRAC | SIERRAC | Submittal #5 | | Submittal 5 | 2088569 |
Construction | Original | D | 11/21/2024 | SIERRAC | SIERRAC | DISAPPROVED REMAINING DEPARTMENTS TO ALLOW SUBMITTER TO PROVIDE ALL OF THE REQUESTED DOCUMENTS FOR THE ZONING DEPARTMENT. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2088489 |
Energy | Original | D | 11/21/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2088486 |
Construction | Original | D | 11/21/2024 | SIERRAC | SIERRAC | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2088485 |
CO Springs DRE | Original | D | 11/21/2024 | SIERRAC | SIERRAC | | | CO Springs DRE | 2088483 |
| Original | / | 11/21/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2088413 |
Submittal 4 | Original | / | 11/21/2024 | QUINTONW | QUINTONW | Submittal #4 | | Submittal 4 | 2088412 |
Energy | Original | D | 9/5/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2056311 |
Mechanical | Original | A | 9/5/2024 | TCRIPPEN | TCRIPPEN | Approved | | Mechanical | 2056310 |
Energy | Original | / | 9/5/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2056297 |
CO Springs DRE | Original | D | 8/28/2024 | MAMBUUL | MAMBUUL | Previous comments not addressed. Please upload approved minor modification to the previously approved development plan stamped by land use review. Approval is required before building permit may be issued, per PRE-24-0715 | | CO Springs DRE | 2052743 |
Zoning/Planning | Original | / | 8/27/2024 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2051890 |
Energy | Original | D | 8/26/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2051747 |
Mechanical | Original | D | 8/26/2024 | TCRIPPEN | TCRIPPEN | Disapproved missing gas lines and sizes Per JE request 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2051746 |
Construction | Original | D | 8/26/2024 | JUSTINL | JUSTINL | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2051493 |
Electronic Plan | Original | / | 8/22/2024 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2050218 |
| Original | / | 8/20/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2049140 |
| Original | / | 8/16/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2048121 |
Submittal 3 | Original | / | 8/16/2024 | QUINTONW | QUINTONW | Submittal #3 | | Submittal 3 | 2048120 |
CO Springs Fire | Original | A | 8/2/2024 | CSFIRE | CSFIRE | You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | Jacob.Watson | CO Springs Fire | 2041382 |
Mechanical | Original | D | 7/25/2024 | TCRIPPEN | TCRIPPEN | Disapproved: We can work without duct lines.We will need a roof plan showing RTUS locations and schedule each and gas pipe routing and sizes, A test and balance report will be required at final, 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2037181 |
Energy | Original | D | 7/23/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2036059 |
Electrical | Original | A | 7/23/2024 | DANIELG | DANIELG | | | Electrical | 2036058 |
CO Springs DRE | Original | D | 7/22/2024 | MOBRIEN | MOBRIEN | Please upload approved minor modification to the previously approved development plan with Land Use Review stamp. Approval is required before building permit may be issued, per PRE-24-0715. | | CO Springs DRE | 2035433 |
Zoning/Planning | Original | / | 7/22/2024 | MOBRIEN | MOBRIEN | In Current Review by MOBRIEN | | Zoning/Planning | 2035282 |
Plumbing | Original | A | 7/22/2024 | SHANEN | SHANEN | | | Plumbing | 2035244 |
Mechanical | Original | D | 7/19/2024 | TCRIPPEN | TCRIPPEN | Disapproved:A change of occupancy requires supply ducts and return ducts with sizes, We need a complete set of mechanicals.See progress set, 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2035188 |
Construction | Original | D | 7/19/2024 | JUSTINL | JUSTINL | Construction type revised from V-A to V-B. IEBC LEVEL 2 ALTERATION - CHANGE OF OCCUPANCY 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2035080 |
Electronic Plan | Original | / | 7/19/2024 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2034906 |
Enumeration | Original | N | 7/19/2024 | BECKYA | BECKYA | | | Enumeration | 2034769 |
Submittal 2 | Original | / | 7/19/2024 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 2034696 |
CO Springs Fire | Original | D | 7/3/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2027925 |
CO Springs Hazmat | Original | N | 7/3/2024 | CSFIRE | CSFIRE | | chiptaylor | CO Springs Hazmat | 2027924 |
CO Springs DRE | Original | D | 6/14/2024 | MOBRIEN | MOBRIEN | Use change and exterior changes may trigger a modification to the previously approved development plan. Please request a pre-application meeting: coloradosprings.gov/preapp | | CO Springs DRE | 2020117 |
Energy | Original | D | 6/12/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2018762 |
Mechanical | Original | D | 6/12/2024 | TCRIPPEN | TCRIPPEN | Need to correct address first on plan set 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2018761 |
Zoning/Planning | Original | / | 6/12/2024 | MOBRIEN | MOBRIEN | In Current Review by MOBRIEN | | Zoning/Planning | 2018738 |
Electrical | Original | D | 6/11/2024 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2018234 |
Electronic Plan | Original | / | 6/11/2024 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2018144 |
CSU Water | Original | N | 6/11/2024 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. No new water service outside of building.MDA | malcuran | CSU Water | 2018086 |
CSU Waste Water | Original | N | 6/11/2024 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. No new wastewater service outside of building.MDA | malcuran | CSU Waste Water | 2018082 |
Plumbing | Original | D | 6/11/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2018039 |
Construction | Original | D | 6/11/2024 | JUSTINL | JUSTINL | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2017957 |
Energy | Original | / | 6/5/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2015741 |
Electronic Plan | Original | / | 6/5/2024 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2015654 |
Enumeration | Original | D | 6/5/2024 | BECKYA | BECKYA | See Mech and Plumb sheets for comment regarding the address. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2015331 |
Energy | Original | / | 6/3/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2014119 |
Floodplain | Original | N | 6/3/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6417122021) | | Floodplain | 2014118 |