Submittal 4 | Original | / | 10/25/2024 | QUINTONW | QUINTONW | Submittal #4 | | Submittal 4 | 2077646 |
CO Springs Hazmat | Original | D | 9/26/2024 | CSFIRE | CSFIRE | See disapproved fire comments | phil.valdez | CO Springs Hazmat | 2065230 |
CO Springs Fire | Original | D | 9/26/2024 | CSFIRE | CSFIRE | (see full review) | phil.valdez | CO Springs Fire | 2065229 |
Energy | Original | A | 9/17/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2061095 |
Electrical | Original | A | 9/17/2024 | DANIELG | DANIELG | | | Electrical | 2061094 |
| Original | / | 9/16/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2060900 |
| Original | / | 9/11/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2058499 |
Submittal 3 | Original | / | 9/11/2024 | SIERRAC | SIERRAC | Submittal #3 | | Submittal 3 | 2058498 |
CO Springs Fire | Original | D | 8/26/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. (see full review) | Jacob.Watson | CO Springs Fire | 2051345 |
CO Springs Hazmat | Original | D | 8/26/2024 | CSFIRE | CSFIRE | See fire comments | Jacob.Watson | CO Springs Hazmat | 2051344 |
Energy | Original | D | 8/15/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2047172 |
Electrical | Original | D | 8/15/2024 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2047171 |
CO Springs DRE | Original | A | 8/12/2024 | MAMBUUL | MAMBUUL | Approved for commercial interior remodel and replacement of existing overhead garage doors. No change of occupancy. (see full review) | | CO Springs DRE | 2045612 |
Plumbing | Original | A | 8/12/2024 | SHANEN | SHANEN | | | Plumbing | 2045306 |
Mechanical | Original | A | 8/12/2024 | TREVORH | TREVORH | Approved; | | Mechanical | 2045004 |
Zoning/Planning | Original | / | 8/9/2024 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2044720 |
Construction | Original | A | 8/9/2024 | BPHILLIPS | BPHILLIPS | | | Construction | 2044615 |
Enumeration | Original | N | 8/9/2024 | BECKYA | BECKYA | | | Enumeration | 2044547 |
Submittal 2 | Original | / | 8/9/2024 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2044381 |
CO Springs Fire | Original | D | 7/22/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. (see full review) | Jacob.Watson | CO Springs Fire | 2035843 |
CO Springs Hazmat | Original | D | 7/22/2024 | CSFIRE | CSFIRE | See Fire Comments | Jacob.Watson | CO Springs Hazmat | 2035840 |
Energy | Original | D | 7/18/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2034592 |
Electrical | Original | D | 7/18/2024 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2034591 |
Electronic Plan | Original | / | 7/18/2024 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2034573 |
Plumbing | Original | D | 7/16/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2032724 |
CO Springs DRE | Original | D | 7/12/2024 | MAMBUUL | MAMBUUL | Need to provide site plan or map where structure is located. (see full review) | | CO Springs DRE | 2031484 |
Mechanical | Original | D | 7/10/2024 | TREVORH | TREVORH | Disapproved; 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2030533 |
Zoning/Planning | Original | / | 7/10/2024 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2030492 |
CSU Water | Original | N | 7/10/2024 | CSUREVIEW | CSUREVIEW | No new water service outside of building.MDA | malcuran | CSU Water | 2030375 |
CSU Waste Water | Original | N | 7/10/2024 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. MDA | malcuran | CSU Waste Water | 2030374 |
Construction | Original | D | 7/10/2024 | BPHILLIPS | BPHILLIPS | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2030357 |
Electronic Plan | Original | / | 7/9/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2030093 |
Enumeration | Original | D | 7/3/2024 | BECKYA | BECKYA | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2028255 |
Energy | Original | / | 7/2/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2027669 |
Floodplain | Original | N | 7/2/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6331200049) | | Floodplain | 2027668 |