CO Springs Fire | Splice 06/19/25 | A | 7/9/2025 | CSFIRE | CSFIRE | You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | Jacob.Watson | CO Springs Fire | 2181929 |
Construction | Splice 06/19/25 | A | 7/8/2025 | BPHILLIPS | BPHILLIPS | Minor architectural revisions | | Construction | 2181058 |
Electronic Plan | Splice 06/19/25 | / | 7/7/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2180940 |
Submittal 2 | Splice 06/19/25 | / | 7/7/2025 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2180936 |
CO Springs Fire | Splice 06/19/25 | D | 6/20/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2174535 |
Mechanical | Splice 06/19/25 | A | 6/20/2025 | TREVORH | TREVORH | Approved; clouded revisions only changing equipment from gas to electric | | Mechanical | 2174344 |
Plumbing | Splice 06/19/25 | A | 6/19/2025 | SHANEN | SHANEN | Revised sheet P1.2 and P3. | | Plumbing | 2173948 |
Electrical | Splice 06/19/25 | A | 6/19/2025 | DANIELG | DANIELG | | | Electrical | 2173934 |
Construction | Splice 06/19/25 | D | 6/19/2025 | BPHILLIPS | BPHILLIPS | Document date is the same as the originally approved plan (6/28/24). If there are changes, the architect of record needs to cloud, initial and restamp plan. Provide narrative of proposed changes. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2173851 |
Electronic Plan | Splice 06/19/25 | / | 6/19/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2173844 |
Construction | Splice 06/04/25 | A | 6/12/2025 | BPHILLIPS | BPHILLIPS | Bulkhead details, revised ramp. | | Construction | 2170458 |
Electronic Plan | Splice 06/04/25 | / | 6/12/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2170436 |
Submittal 2 | Splice 06/04/25 | / | 6/11/2025 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2170299 |
CO Springs Fire | Splice 06/04/25 | A | 6/5/2025 | CSFIRE | CSFIRE | Splice 6.4.25 approved for clouded revs.
FIRE PROTECTION SYSTEM PLANS NOT REVIEWED There were fire protection system plans attached to the construction plans, however, they were not reviewed due to lack of specification sheets, calculations, etc. The subcontractor for these systems must submit these plans for our review and obtain separate permits from the CSFD for the installation of said systems. No work is allowed to begin without proper permits. | phil.valdez | CO Springs Fire | 2167807 |
Mechanical | Splice 06/04/25 | A | 6/5/2025 | TREVORH | TREVORH | Approved; Clouded Revisions only, new drawing adding new scope of work, splice including the Engineered Refrigeration submittal sheets. | | Mechanical | 2167521 |
Electrical | Splice 06/04/25 | A | 6/5/2025 | DANIELG | DANIELG | | | Electrical | 2167184 |
Construction | Splice 06/04/25 | D | 6/5/2025 | BPHILLIPS | BPHILLIPS | Some duplicate sheets submitted in construction splice. Remove duplicates and resubmit, with sheets in order according to the index. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2167151 |
Electronic Plan | Splice 06/04/25 | / | 6/5/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2167147 |
CO Springs DRE | Splice 05/15/25 | A | 5/19/2025 | SSADLER | SSADLER | Previous approval comments still apply. Approved for clouded revisions. | | CO Springs DRE | 2160383 |
EPC Health Dept | Splice 05/15/25 | A | 5/19/2025 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. KB | KBauer | EPC Health Dept | 2160069 |
Zoning/Planning | Splice 05/15/25 | / | 5/16/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2159643 |
CO Springs Fire | Splice 05/15/25 | A | 5/16/2025 | CSFIRE | CSFIRE | FIRE PROTECTION SYSTEM PLANS NOT REVIEWED There were fire protection system plans attached to the construction plans, however, they were not reviewed due to lack of specification sheets, calculations, etc. The subcontractor for these systems must submit these plans for our review and obtain separate permits from the CSFD for the installation of said systems. No work is allowed to begin without proper permits
PERMITS AND DEFERRED SUBMITTALS: The following deferred submittals may be required depending on your scope of work:
--X-- Fire Sprinkler
Ensure all applicable permits are obtained from the Regional Building Department and the Colorado Springs Fire Department for the work that is being done at this site. | Jacob.Watson | CO Springs Fire | 2159589 |
Construction | Splice 05/15/25 | A | 5/15/2025 | BPHILLIPS | BPHILLIPS | Numerous minor architectural changes, provided updated structural details. | | Construction | 2159397 |
Electronic Plan | Splice 05/15/25 | / | 5/15/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2159278 |
CO Springs Fire | Splice 05/06/25 | A | 5/8/2025 | CSFIRE | CSFIRE | Splice for 5-6-25 approved for clouded revisions only. | michael.davis1@color | CO Springs Fire | 2156136 |
Plumbing | Splice 05/06/25 | A | 5/7/2025 | SHANEN | SHANEN | Revised sheet P1, P1.1, P1.2, P2, P3. Added sheet P2.1 and GP1. | | Plumbing | 2155638 |
Electrical | Splice 05/06/25 | A | 5/7/2025 | DANIELG | DANIELG | | | Electrical | 2155541 |
Mechanical | Splice 05/06/25 | A | 5/7/2025 | TREVORH | TREVORH | Approved; clouded revisions only, submittal also includes new Refrigeration upload and building automation system | | Mechanical | 2155520 |
Construction | Splice 05/06/25 | A | 5/7/2025 | BPHILLIPS | BPHILLIPS | Revised six structural sheets. | | Construction | 2155372 |
Electronic Plan | Splice 05/06/25 | / | 5/7/2025 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2155370 |
CO Springs DRE | Original | A | 4/7/2025 | MAMBUUL | MAMBUUL | Financial assurances in place as of 3/14/2025. | | CO Springs DRE | 2141581 |
CO Springs DRE | Original | D | 3/25/2025 | MAMBUUL | MAMBUUL | Need to complete the financial assurance process prior to building permit approval. Plans have been stamped and may be approved once financial assurances are in place. Plans are consistent with approved plan set stamped by land use review. Re-review fee has been paid. | | CO Springs DRE | 2135461 |
Zoning/Planning | Original | / | 3/19/2025 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2133038 |
| Original | / | 3/19/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2133025 |
| Original | / | 3/18/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2132449 |
Submittal 5 | Original | / | 3/18/2025 | QUINTONW | QUINTONW | Submittal #5 | | Submittal 5 | 2132448 |
CO Springs DRE | Original | D | 2/25/2025 | CHUDSPETH | CHUDSPETH | Plans have been denied until planner review is complete. All CDI fees were paid on 2/25/2025 | | CO Springs DRE | 2124439 |
CO Springs DRE | Original | D | 1/9/2025 | MAMBUUL | MAMBUUL | 1. Need to upload recorded plat to permit. 2. Need to pay CDI fees per approval letter from land use review, DEPN-24-0117, Contact DREplanninginfo@coloradosprings.gov to pay fees. 3. Need to provide financial assurances for public and private improvements. This permit has reached the maximum allotted plan reviews, and a re-review fee has been assessed. Fees must be paid prior to further reviews. To pay fees for permit review please follow the link provided. https://aca-prod.accela.com/COSPRINGS/Default.aspx Click on “Building” tab and enter record number BLDREV-25-00021 or enter required information in fields provided. Additional fees will be assessed for each further review as needed | | CO Springs DRE | 2106926 |
Zoning/Planning | Original | / | 1/8/2025 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2106088 |
CSU Waste Water | Original | A | 1/8/2025 | CSUREVIEW | CSUREVIEW | Comments addressed. DMM | dmakings | CSU Waste Water | 2106012 |
CSU Water | Original | A | 1/8/2025 | CSUREVIEW | CSUREVIEW | Comments addressed. DMM | dmakings | CSU Water | 2106008 |
Energy | Original | A | 1/8/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2105978 |
Plumbing | Original | A | 1/8/2025 | SHANEN | SHANEN | | | Plumbing | 2105977 |
| Original | / | 1/8/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2105948 |
| Original | / | 1/8/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2105909 |
Submittal 4 | Original | / | 1/8/2025 | BRIANNAM | BRIANNAM | Submittal #4 | | Submittal 4 | 2105908 |
CO Springs DRE | Original | D | 10/24/2024 | MAMBUUL | MAMBUUL | Please upload approved development plan set stamped by land use review as well as recorded plat to permit. | | CO Springs DRE | 2077021 |
Energy | Original | D | 10/23/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2076076 |
Plumbing | Original | D | 10/23/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2076075 |
Zoning/Planning | Original | / | 10/22/2024 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2076005 |
Mechanical | Original | A | 10/22/2024 | TREVORH | TREVORH | Approved; | | Mechanical | 2075911 |
Electrical | Original | A | 10/22/2024 | DANIELG | DANIELG | | | Electrical | 2075806 |
CSU Water | Original | D | 10/22/2024 | CSUREVIEW | CSUREVIEW | Approved Development Plan and CSU-approved Utility Service Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions.MDA | malcuran | CSU Water | 2075796 |
CSU Waste Water | Original | D | 10/22/2024 | CSUREVIEW | CSUREVIEW | Approved Development Plan and CSU-approved Utility Service Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions.MDA | malcuran | CSU Waste Water | 2075795 |
Construction | Original | A | 10/22/2024 | BPHILLIPS | BPHILLIPS | | | Construction | 2075786 |
| Original | / | 10/22/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2075503 |
| Original | / | 10/21/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2075361 |
Submittal 3 | Original | / | 10/21/2024 | BRIANNAM | BRIANNAM | Submittal #3 | | Submittal 3 | 2075360 |
CO Springs Fire | Original | A | 10/10/2024 | CSFIRE | CSFIRE | You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! | rpeterson | CO Springs Fire | 2070795 |
CO Springs Hazmat | Original | N | 10/10/2024 | CSFIRE | CSFIRE | | rpeterson | CO Springs Hazmat | 2070794 |
CO Springs DRE | Original | D | 9/30/2024 | SSADLER | SSADLER | Previous comments not addressed. The approved stamped development plan must be uploaded. | | CO Springs DRE | 2065955 |
Energy | Original | D | 9/30/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2065835 |
Plumbing | Original | D | 9/30/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2065834 |
Mechanical | Original | A | 9/26/2024 | TREVORH | TREVORH | Approved; | | Mechanical | 2065037 |
Electrical | Original | D | 9/26/2024 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2064962 |
CSU Water | Original | D | 9/26/2024 | CSUREVIEW | CSUREVIEW | See previous comments. Approved Development Plan (if Necessary)and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. mjg | mgackle | CSU Water | 2064708 |
CSU Waste Water | Original | D | 9/26/2024 | CSUREVIEW | CSUREVIEW | See previous comments. Approved Development Plan (if Necessary)and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. mjg | mgackle | CSU Waste Water | 2064706 |
Zoning/Planning | Original | / | 9/26/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2064691 |
Construction | Original | A | 9/26/2024 | BPHILLIPS | BPHILLIPS | | | Construction | 2064686 |
Electronic Plan | Original | / | 9/26/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2064658 |
Enumeration | Original | N | 9/25/2024 | BECKYA | BECKYA | | | Enumeration | 2064596 |
Submittal 2 | Original | / | 9/25/2024 | BRIANNAM | BRIANNAM | Submittal #2 | | Submittal 2 | 2064542 |
CO Springs Fire | Original | D | 8/27/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | Jacob.Watson | CO Springs Fire | 2051921 |
CO Springs Hazmat | Original | D | 8/27/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | Jacob.Watson | CO Springs Hazmat | 2051920 |
Energy | Original | D | 8/21/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2049680 |
Electrical | Original | D | 8/21/2024 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2049679 |
Electronic Plan | Original | / | 8/21/2024 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2049614 |
Energy | Original | / | 8/19/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2048409 |
Energy | Original | D | 8/19/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2048408 |
Mechanical | Original | D | 8/15/2024 | TREVORH | TREVORH | Disapproved; 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2047025 |
CO Springs DRE | Original | D | 8/12/2024 | SSADLER | SSADLER | Upload the approved and stamped development plan | | CO Springs DRE | 2044983 |
Electronic Plan | Original | / | 8/9/2024 | TREVORH | TREVORH | In Current Review by TREVORH | | Electronic Plan | 2044639 |
Zoning/Planning | Original | / | 8/9/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2044253 |
Plumbing | Original | D | 8/9/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2044221 |
CSU Water | Original | D | 8/8/2024 | CSUREVIEW | CSUREVIEW | Provide an Approved Development Plan (If necessary) and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. mjg | mgackle | CSU Water | 2044014 |
CSU Waste Water | Original | D | 8/8/2024 | CSUREVIEW | CSUREVIEW | Provide an Approved Development Plan (If necessary) and CSU-approved Construction Drawings must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. mjg | mgackle | CSU Waste Water | 2044012 |
Construction | Original | D | 8/8/2024 | BPHILLIPS | BPHILLIPS | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2043989 |
Electronic Plan | Original | / | 8/6/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2042916 |
Health Dept. | Original | A | 8/2/2024 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. KB | KBauer | Health Dept. | 2041491 |
Enumeration | Original | D | 8/2/2024 | BECKYA | BECKYA | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2041386 |
Health Dept. | Original | D | 7/29/2024 | HEALTHDEPT | HEALTHDEPT | Retail food establishment plan review is in process and not yet approved. If your assigned plan reviewer has questions, they will contact you directly. For questions, contact Environmental Health at 719-578-3199 option 3. KB | KBauer | Health Dept. | 2039009 |
Energy | Original | / | 7/29/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2038895 |
Floodplain | Original | N | 7/29/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6415209075) | | Floodplain | 2038894 |