Energy | Original | A | 12/20/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2101269 |
Electrical | Original | A | 12/20/2024 | RICHG | RICHG | | | Electrical | 2101268 |
Electronic Plan | Original | / | 12/20/2024 | RICHG | RICHG | In Current Review by RICHG | | Electronic Plan | 2101267 |
CSU Contract Admin. | Original | D | 12/13/2024 | CSUAPPSPRM | CSUAPPSPRM | Same comment as previously noted - Requires payment of an electric design fee.
AMS | ASweet | CSU Contract Admin. | 2098617 |
Mechanical | Original | A | 12/12/2024 | TREVORH | TREVORH | Approved; | | Mechanical | 2097945 |
Plumbing | Original | A | 12/11/2024 | SHANEN | SHANEN | | | Plumbing | 2097812 |
Construction | Original | A | 12/11/2024 | SHELLEY | SHELLEY | | | Construction | 2097806 |
Enumeration | Original | D | 12/11/2024 | BRENT | BRENT | No wrecking permit has been issued for the existing buildings on the parcel. Enumerations approval pending issuance of wrecking permits * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Enumeration | 2097569 |
Electronic Plan | Original | / | 12/11/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2097557 |
| Original | / | 12/11/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2097469 |
| Original | / | 12/10/2024 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2096735 |
Submittal 3 | Original | / | 12/10/2024 | BRIANNAM | BRIANNAM | Submittal #3 | | Submittal 3 | 2096734 |
Energy | Original | D | 10/30/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2079288 |
Electrical | Original | D | 10/30/2024 | RICHG | RICHG | Panel MDP AIC rating is less than the available. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2079287 |
EPC Health Dept | Original | A | 10/29/2024 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. AB | abrannon | EPC Health Dept | 2078610 |
Mechanical | Original | A | 10/28/2024 | TREVORH | TREVORH | Approved; | | Mechanical | 2078094 |
County Zoning | Original | A | 10/25/2024 | DSDMATHY2 | DSDMATHY2 | This plan will be approved with Road Impact Fees (PPR2413)
The building is 950sf @ $8,800 per 1000sf = $8,360. | | County Zoning | 2077545 |
Plumbing | Original | A | 10/24/2024 | SHANEN | SHANEN | | | Plumbing | 2076938 |
CSU Contract Admin. | Original | D | 10/24/2024 | CSUAPPSPRM | CSUAPPSPRM | Requires payment of electric design fee. Please contact Customer Contract Administration at 719-668-8111 to discuss charges/fees. AMS | ASweet | CSU Contract Admin. | 2076889 |
CSU Contract Admin. | Original | D | 10/24/2024 | CSUAPPSPRM | CSUAPPSPRM | | ASweet | CSU Contract Admin. | 2076888 |
Gas/Elec. Utils | Original | A | 10/23/2024 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. CJS | cjsavage | Gas/Elec. Utils | 2076589 |
Construction | Original | A | 10/23/2024 | SHELLEY | SHELLEY | | | Construction | 2076538 |
Enumeration | Original | D | 10/23/2024 | BRENT | BRENT | See comment 8/30/24 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2076459 |
Electronic Plan | Original | / | 10/23/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2076448 |
Submittal 2 | Original | / | 10/23/2024 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2076274 |
Cimarron Hills Fire | Original | A | 9/18/2024 | CHFIRE | CHFIRE | CHFD has reviewed and approved the plans submitted by Barghausen Consulting Engineers for the Dutch Brothers Coffee Shop on 5810 Omaha Boulevard. Thomas P Joyce Fire Inspector III / Plans Examiner | tjoyce@cimarronhills | Cimarron Hills Fire | 2061987 |
Cimarron Hills Hazmat | Original | N | 9/18/2024 | CHFIRE | CHFIRE | CHFD has reviewed the plans submitted and HazMat is not applicable. Thomas P Joyce Fire Inspector III / Plans Examiner | tjoyce@cimarronhills | Cimarron Hills Hazmat | 2061986 |
Cherokee Water | Original | A | 9/17/2024 | CHEROKEEMETRO | CHEROKEEMETRO | CMD's Bluebeam account is in the process of being renewed and could not sign within the review plan. However, Water plan is Approved. | bzembles | Cherokee Water | 2061152 |
Cherokee Waste Water | Original | A | 9/17/2024 | CHEROKEEMETRO | CHEROKEEMETRO | All waste lines from respective locations are in line with Cherokee Metro Standards.
CMD's Bluebeam account is in the process of being renewed and could not sign within the review plan. However, Wastewater is Approved. | bzembles | Cherokee Waste Water | 2061150 |
Energy | Original | D | 9/13/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2059839 |
Electrical | Original | D | 9/13/2024 | BERTHA | BERTHA | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2059838 |
Electronic Plan | Original | / | 9/9/2024 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2057785 |
County Zoning | Original | D | 9/9/2024 | DSDMATHY2 | DSDMATHY2 | PPR2413 is not closed out or approved. The Site Development Plan must be approved prior to an approved building permit. Please ensure to submit the approved and stamped off SDP. | | County Zoning | 2057461 |
Mechanical | Original | D | 9/9/2024 | TREVORH | TREVORH | Disapproved; pending review comments by Hazmat 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2057312 |
Zoning/Planning | Original | / | 9/9/2024 | DSDMATHY2 | DSDMATHY2 | In Current Review by DSDMATHY2 | | Zoning/Planning | 2057293 |
CSU Contract Admin. | Original | D | 9/6/2024 | CSUAPPSPRM | CSUAPPSPRM | Requires payment of an electric design fee.
AMS | ASweet | CSU Contract Admin. | 2056877 |
Gas/Elec. Utils | Original | D | 9/6/2024 | CSUREVIEW | CSUREVIEW | Approved Development Plan must be attached to the permit set. Contact Utilities Development Services at 719-668-8259 with any questions. SSM | stefanm | Gas/Elec. Utils | 2056478 |
Plumbing | Original | D | 9/5/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2056271 |
Elevators | Original | N | 9/5/2024 | ERIC | ERIC | No conveyance | | Elevators | 2056202 |
Construction | Original | D | 9/5/2024 | SHELLEY | SHELLEY | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2056088 |
Electronic Plan | Original | / | 9/5/2024 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2056063 |
Enumeration | Original | D | 8/30/2024 | BRENT | BRENT | No wrecking permit has been issued for the existing buildings on the parcel. Enumerations approval pending issuance of wrecking permits. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2054403 |
Electronic Plan | Original | / | 8/30/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2054391 |
Health Dept. | Original | D | 8/30/2024 | HEALTHDEPT | HEALTHDEPT | Retail food establishment plan review is in process and not yet approved. If your assigned plan reviewer has questions, they will contact you directly. For questions, contact Environmental Health at 719-578-3199 option 3. AB | abrannon | Health Dept. | 2054121 |
Fire | Original | / | 8/29/2024 | SYSTEM | SYSTEM | You will need to contact Fire department for approval prior to permit. This department will not review the plan electronically. | | Fire | 2053478 |
Hazmat | Original | / | 8/29/2024 | SYSTEM | SYSTEM | You will need to contact Hazmat department for approval prior to permit. This department will not review the plan electronically. | | Hazmat | 2053477 |
Energy | Original | / | 8/29/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2053476 |
Floodplain | Original | N | 8/29/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5406304025) | | Floodplain | 2053475 |