CO Springs DRE | Original | A | 11/15/2024 | SSADLER | SSADLER | Previous approval comments still apply. The re striping of the parking lot is not changing the parking calculations or moving any ADA parking stalls. The new signage is not approved and needs to have a separate permit issued. | | CO Springs DRE | 2085905 |
Zoning/Planning | Original | / | 11/12/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2083910 |
Energy | Original | A | 11/12/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2083875 |
Plumbing | Original | A | 11/12/2024 | SHANEN | SHANEN | | | Plumbing | 2083874 |
Construction | Original | A | 11/11/2024 | BPHILLIPS | BPHILLIPS | | | Construction | 2083780 |
Electronic Plan | Original | / | 11/11/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2083766 |
Submittal 2 | Original | / | 11/11/2024 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2083363 |
EPC Health Dept | Original | A | 10/11/2024 | HEALTHDEPT | HEALTHDEPT | Retail food establishment approved in plan review. A pre-operational inspection will be required before final approval for opening is granted. TG | tguerrero | EPC Health Dept | 2071805 |
EPC Health Dept | Original | / | 10/11/2024 | HEALTHDEPT | HEALTHDEPT | | tguerrero | EPC Health Dept | 2071804 |
Energy | Original | D | 10/5/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2068780 |
Electrical | Original | A | 10/5/2024 | BERTHA | BERTHA | | | Electrical | 2068779 |
Electronic Plan | Original | / | 10/5/2024 | BERTHA | BERTHA | In Current Review by BERTHA | | Electronic Plan | 2068778 |
CO Springs Fire | Original | N | 10/2/2024 | CSFIRE | CSFIRE | | chiptaylor | CO Springs Fire | 2067437 |
CO Springs Hazmat | Original | N | 10/2/2024 | CSFIRE | CSFIRE | | chiptaylor | CO Springs Hazmat | 2067436 |
Health Dept. | Original | D | 9/24/2024 | HEALTHDEPT | HEALTHDEPT | Retail food establishment plan review is in process and not yet approved. If your assigned plan reviewer has questions, they will contact you directly. For questions, contact Environmental Health at 719-578-3199 option 3. Per Tom, there will be sinks added to the plans that are new. KB | KBauer | Health Dept. | 2064061 |
CO Springs DRE | Original | A | 9/23/2024 | SSADLER | SSADLER | Interior remodel only. No change in footprint, No change in parking. No change in occupancy. | | CO Springs DRE | 2063181 |
Health Dept. | Original | N | 9/20/2024 | HEALTHDEPT | HEALTHDEPT | Not applicable. Per Tom all refrigeration is either being relocated or exchanged like for like. 3-comps are also like for like. | tguerrero | Health Dept. | 2063042 |
Zoning/Planning | Original | / | 9/19/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2062544 |
Mechanical | Original | A | 9/19/2024 | DALEH | DALEH | | | Mechanical | 2062375 |
Plumbing | Original | D | 9/19/2024 | SHANEN | SHANEN | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2062353 |
CSU Waste Water | Original | N | 9/19/2024 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. DMM | dmakings | CSU Waste Water | 2062315 |
CSU Water | Original | N | 9/19/2024 | CSUREVIEW | CSUREVIEW | Backflow okay. DMM | dmakings | CSU Water | 2062310 |
Construction | Original | D | 9/19/2024 | BPHILLIPS | BPHILLIPS | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2062291 |
Electronic Plan | Original | / | 9/19/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2062194 |
Enumeration | Original | N | 9/17/2024 | AMY | AMY | | | Enumeration | 2061226 |
Electronic Plan | Original | / | 9/17/2024 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2061188 |
Floodplain | Original | N | 9/17/2024 | KEITH | KEITH | | | Floodplain | 2060970 |
Energy | Original | / | 9/16/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2060409 |
Floodplain | Original | / | 9/16/2024 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 7336202004) | | Floodplain | 2060406 |