Required Departments: 7
|
|
|
Log Entries: 8
|
|
Mechanical | Original | N | 12/3/2024 | TCRIPPEN | TCRIPPEN | No mechanical | | Mechanical | 2093668 | Elevators | Original | A | 11/26/2024 | ERIC | ERIC | Elevator modernization x 2 | | Elevators | 2089883 | Electrical | Original | D | 11/25/2024 | RICHG | RICHG | Provide compliance with 620.62 NEC 2023
Provide floor plan indicating scope of work (show pit, demo, and new gear)
Provide withstand rating for new elevator controllers.
Pending elevator review * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2089388 | Construction | Original | N | 11/25/2024 | DOUGC | DOUGC | | | Construction | 2089325 | Plumbing | Original | N | 11/25/2024 | SHANEN | SHANEN | | | Plumbing | 2089300 | Floodplain | Original | A | 11/25/2024 | BRENT | BRENT | | | Floodplain | 2089294 | Energy | Original | N | 9/18/2024 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2061920 | Floodplain | Original | / | 9/18/2024 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 7425200062) | | Floodplain | 2061919 |
|
| |
|