Required Departments: 3
|
|
|
Log Entries: 6
|
|
Submittal 2 | Original | / | 12/20/2024 | RITA | RITA | Submittal #2 | | Submittal 2 | 2101439 | Enumeration | Original | A | 9/24/2024 | BECKYA | BECKYA | | | Enumeration | 2064071 | Electronic Plan | Original | / | 9/24/2024 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2064056 | Construction | Original | D | 9/24/2024 | SHELLEY | SHELLEY | Provide footing engineering. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2063735 | Zoning/Planning | Original | / | 9/24/2024 | SYSTEM | SYSTEM | You will need to contact Zoning/Planning department for approval prior to permit. This department will not review the plan electronically. | | Zoning/Planning | 2063694 | Floodplain | Original | N | 9/24/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5530007013) | | Floodplain | 2063693 |
|
| |
|