Construction | Original | D | 10/8/2024 | BPHILLIPS | BPHILLIPS | Provide engineer-stamped design for foundation element. Include local climatic design criteria. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2069629 |
Electronic Plan | Original | / | 10/8/2024 | BPHILLIPS | BPHILLIPS | In Current Review by BPHILLIPS | | Electronic Plan | 2069627 |
Enumeration | Original | D | 10/7/2024 | BRENT | BRENT | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2069331 |
Electronic Plan | Original | / | 10/7/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2069307 |
Zoning/Planning | Original | / | 10/4/2024 | SYSTEM | SYSTEM | You will need to contact Zoning/Planning department for approval prior to permit. This department will not review the plan electronically. | | Zoning/Planning | 2068588 |