CO Springs Hazmat | Original | A | 11/22/2024 | CSFIRE | CSFIRE | LPG Cage may be a Defered Submittal. You must submit plans and have them completed bfore requesting a TCO or CO. You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION! The Defers submittal will be trough the Acella ACA - High Pile also Required | mark.stanwood@colora | CO Springs Hazmat | 2088972 |
CO Springs Fire | Original | D | 11/22/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2088745 |
CO Springs DRE | Original | D | 11/15/2024 | KSCHOTT | KSCHOTT | Please better identify on the site plan what the existing use/business is for this space and what the proposed use will be. May require "change of occupancy" permit type | | CO Springs DRE | 2085959 |
Energy | Original | D | 11/13/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2084785 |
Mechanical | Original | D | 11/13/2024 | TREVORH | TREVORH | Disapproved; Still need to see construction review comments addressed. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2084784 |
Electrical | Original | D | 11/12/2024 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2084327 |
Zoning/Planning | Original | / | 11/12/2024 | KSCHOTT | KSCHOTT | In Current Review by KSCHOTT | | Zoning/Planning | 2084123 |
Plumbing | Original | D | 11/12/2024 | SHANEN | SHANEN | Construction review comments must be addressed. Plumbing plans may be required. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Plumbing | 2084040 |
CSU Water | Original | N | 11/12/2024 | CSUREVIEW | CSUREVIEW | No new water service outside of building PER SUBMITTED PLANS.MDA | malcuran | CSU Water | 2084002 |
CSU Waste Water | Original | N | 11/12/2024 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building PER SUBMITED PLANS. MDA | malcuran | CSU Waste Water | 2084000 |
Construction | Original | D | 11/12/2024 | JUSTINL | JUSTINL | Project has been updated to be interior finish to expand suite" and would need all required plans for an interior finish along with new Certificate of occupancy in accordance with RBC110.1.2. Review requirements for interior finish on our website and update plans accordingly 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2083991 |
Electronic Plan | Original | / | 11/11/2024 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2083792 |
Enumeration | Original | D | 11/11/2024 | BRENT | BRENT | This project seems to be the existing tenant space addressed as suite 100 expanding into adjacent space. The combined space needs to be suite 100. Update all plan pages and the code study form to shown the correct suite number. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2083408 |
Electronic Plan | Original | / | 11/11/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2083396 |
Submittal 2 | Original | / | 11/8/2024 | SIERRAC | SIERRAC | Submittal #2 | | Submittal 2 | 2082976 |
Energy | Original | D | 10/23/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2076437 |
Plumbing | Original | N | 10/23/2024 | SHANEN | SHANEN | | | Plumbing | 2076436 |
CO Springs Fire | Original | D | 10/22/2024 | CSFIRE | CSFIRE | Disapproved per request | Jacob.Watson | CO Springs Fire | 2075732 |
CO Springs Hazmat | Original | D | 10/22/2024 | CSFIRE | CSFIRE | Disapproved per request | Jacob.Watson | CO Springs Hazmat | 2075730 |
Electrical | Original | D | 10/17/2024 | DANIELG | DANIELG | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Electrical | 2074069 |
Electronic Plan | Original | / | 10/17/2024 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2074056 |
CO Springs DRE | Original | D | 10/14/2024 | SSADLER | SSADLER | Please list the current business and the propsed business. | | CO Springs DRE | 2071986 |
Mechanical | Original | D | 10/11/2024 | TREVORH | TREVORH | Disapproval; pending Construction review comments 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2071769 |
CSU Water | Original | N | 10/11/2024 | CSUREVIEW | CSUREVIEW | No new water service outside of building.
backflow okay. SSM | stefanm | CSU Water | 2071471 |
CSU Waste Water | Original | N | 10/11/2024 | CSUREVIEW | CSUREVIEW | No new water service outside of building.
Backflow okay. SSM | stefanm | CSU Waste Water | 2071470 |
Zoning/Planning | Original | / | 10/11/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2071436 |
Construction | Original | D | 10/10/2024 | JUSTINL | JUSTINL | 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2071377 |
Electronic Plan | Original | / | 10/10/2024 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2070797 |
Enumeration | Original | D | 10/8/2024 | BRENT | BRENT | Include a site plan showing the entire building with suite numbers and the area of work highlighted. Show the suite number for this project anywhere the address is shown. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Enumeration | 2069500 |
Electronic Plan | Original | / | 10/8/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2069489 |
Energy | Original | / | 10/7/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2069021 |
Floodplain | Original | N | 10/7/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6436103006) | | Floodplain | 2069020 |