CO Springs Fire | Original | D | 10/31/2024 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2079979 |
CO Springs Hazmat | Original | N | 10/31/2024 | CSFIRE | CSFIRE | | chiptaylor | CO Springs Hazmat | 2079978 |
CO Springs DRE | Original | D | 10/23/2024 | MAMBUUL | MAMBUUL | Please provide height of exterior remodel improvements on architectural drawings. Please provide site map that shows setbacks of building for new improvements. (see full review) | | CO Springs DRE | 2076607 |
Mechanical | Original | D | 10/23/2024 | TREVORH | TREVORH | Disapproved; 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2076511 |
CSU Water | Original | N | 10/23/2024 | CSUREVIEW | CSUREVIEW | No new water service outside of building. CJS | cjsavage | CSU Water | 2076367 |
CSU Waste Water | Original | D | 10/23/2024 | CSUREVIEW | CSUREVIEW | Provide a CSU approved Utility Service Plan showing the exterior demolition of the wastewater service lines and grease interceptor. CJS | cjsavage | CSU Waste Water | 2076364 |
Zoning/Planning | Original | / | 10/22/2024 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2076000 |
Construction | Original | D | 10/22/2024 | DOUGC | DOUGC | Missing exit signs, common travel path, max travel distance, and accessible clearances 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2075991 |
Energy | Original | / | 10/22/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2075988 |
Electronic Plan | Original | / | 10/22/2024 | DOUGC | DOUGC | In Current Review by DOUGC | | Electronic Plan | 2075756 |
Enumeration | Original | N | 10/18/2024 | BECKYA | BECKYA | | | Enumeration | 2074479 |
Electronic Plan | Original | / | 10/18/2024 | BECKYA | BECKYA | In Current Review by BECKYA | | Electronic Plan | 2074460 |
Energy | Original | / | 10/17/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2073861 |
Floodplain | Original | N | 10/17/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6325106031) | | Floodplain | 2073860 |