Construction | Original | D | 10/30/2024 | DOUGC | DOUGC | After further review with mechanical reviewer, Provide structural plans for new RTU 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2079127 |
EPC Health Dept | Original | N | 10/29/2024 | HEALTHDEPT | HEALTHDEPT | Not applicable. Per Stephen White, no food or TCS beverages will be sold. Facility will be distilling vodka and rum only. Discussed requirement for distillery license via CDPHE. Please visit https://cdphe.colorado.gov/food-manufacturing-and-storage for more information. AB | abrannon | EPC Health Dept | 2078597 |
Mechanical | Original | D | 10/29/2024 | TREVORH | TREVORH | Disapproved: Need to update schedule , need to see construction review comments addressed. 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Mechanical | 2078599 |
CO Springs DRE | Original | D | 10/28/2024 | SSADLER | SSADLER | Please add the existing use and the proposed use to the code study form. | | CO Springs DRE | 2078352 |
Elevators | Original | N | 10/28/2024 | ROBERTV | ROBERTV | No Conveyances | | Elevators | 2078349 |
Zoning/Planning | Original | / | 10/28/2024 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2077875 |
CSU Contract Admin. | Original | N | 10/25/2024 | CSUAPPSPRM | CSUAPPSPRM | No applicable fees due this plan set.BS | bschifferstein | CSU Contract Admin. | 2077772 |
City Engr | Original | N | 10/25/2024 | JDAGNILLO | JDAGNILLO | | | City Engr | 2077738 |
CSU Water | Original | N | 10/25/2024 | CSUREVIEW | CSUREVIEW | Backflow okay. DMM | dmakings | CSU Water | 2077717 |
CSU Waste Water | Original | N | 10/25/2024 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. DMM | dmakings | CSU Waste Water | 2077716 |
Gas/Elec. Utils | Original | N | 10/25/2024 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. No apparent conflicts. DMM | dmakings | Gas/Elec. Utils | 2077715 |
Energy | Original | / | 10/25/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2077670 |
Construction | Original | D | 10/25/2024 | DOUGC | DOUGC | Update occupancy load and classification, update accessibility requirements 1. Please see either the "Progress Set" or the "Review Set" for required corrections. 2. The "Review Set" will become available after all department reviews are complete. 3. Electronic Plans may be re-submitted after the "Review Set" has been created. 4. After all reviews are complete, paper plans may be picked up from the same location they were submitted. | | Construction | 2077669 |
Electronic Plan | Original | / | 10/24/2024 | DOUGC | DOUGC | In Current Review by DOUGC | | Electronic Plan | 2076885 |
Enumeration | Original | A | 10/22/2024 | BRENT | BRENT | | | Enumeration | 2075913 |
Electronic Plan | Original | / | 10/22/2024 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2075910 |
Energy | Original | / | 10/21/2024 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2075329 |
Floodplain | Original | N | 10/21/2024 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6433204006) | | Floodplain | 2075328 |