CO Springs DRE | Original | D | 1/30/2025 | KSCHMITT | KSCHMITT | Denied: Thank you for your submittal. Formal review of application requires structural framing of walls and all buildings along with Fuel canopy in the construction phase on the development prior to permitting. Upon inspection site is currently in the grading phase of construction. In addition, all site plans require a minimum of (2) indicated setback dimensions identifying the location of all ground and freestanding signage. Based on the location of the freestanding sign proposal the size and height do not conform to City Code regulations and will need to be reduced in height and square footage. In addition, directional signs deemed way finding and are limited to direction, arrrows or wayfinding information (ie, entrance, exist, parking, drive thru ect.) branding and logo's are limited to 25% of the message.
Please contact this department if you have any questions. Thank you. 719-385-5072 | | CO Springs DRE | 2115549 |