Floodplain | Original | A | 2/4/2025 | KEITH | KEITH | appraisal , page 10 images $166/SF x 19800 sf=3286800> 2 x Est val of 1,300,000 | | Floodplain | 2117097 |
Zoning/Planning | Original | / | 2/4/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2116972 |
CSU Waste Water | Original | N | 2/4/2025 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. CJS | cjsavage | CSU Waste Water | 2116938 |
CSU Water | Original | D | 2/4/2025 | CSUREVIEW | CSUREVIEW | Requires a Commercial Water Meter Sizing Form for this change of occupancy. Refer to 2023 Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form. Also refer to details B4-16 through B4-22 and select an appropriate meter clearance detail to include on the plumbing plans. CJS | cjsavage | CSU Water | 2116927 |
Plumbing | Original | D | 2/4/2025 | SHANEN | SHANEN | Compliance with 2021 IPC and CO state amendments to 2021 IPC must be stated on the plumbing plans. See highlighted additional requirements for 2021 IECC. All gas piping related items shall be on the mechanical plans.Remove all references to gas piping from the plumbing plans. Provide required water pipe size analysis data, see 2021 IPC appendix E. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. Lavatories must show compliance with 2021 IECC section C404.5.1. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2116861 |
Construction | Original | D | 2/4/2025 | DOUGC | DOUGC | Accessibility // CSF * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2116788 |
Energy | Original | N | 2/3/2025 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2116417 |
Electronic Plan | Original | / | 1/31/2025 | DOUGC | DOUGC | In Current Review by DOUGC | | Electronic Plan | 2116056 |
Floodplain | Original | D | 1/29/2025 | KEITH | KEITH | The estimated valuation of $1,300,000 exceeds the 50% threshold of the structure’s value. The current assessed value of the structure, according to the EPC assessor, is $861,195.
Options:
1 )Provide a revised “estimated valuation” of less than half of $861,195, or $430,597 (see FEMA publication P-758 for clarification on items to be included and excluded from the cost estimate).
2)Provide an appraisal showing the structure’s value is at least 2x the project estimate.
3)Dry floodproof the building and provide a dry floodproofing certificate (FEMA Form FF-206-FY-22-153, formerly 086-0-34) (8/23).
4)Elevate the building to one foot above the Base Flood Elevation. Please direct questions to:
Keith Curtis, PE, CFM 719-327-2898 | E: keith@pprbd.org * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Floodplain | 2115222 |
Enumeration | Original | N | 1/29/2025 | BRENT | BRENT | | | Enumeration | 2114922 |
Electronic Plan | Original | / | 1/29/2025 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2114909 |
Energy | Original | / | 1/29/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2114844 |
Floodplain | Original | / | 1/29/2025 | RBD GIS | RBD GIS | Autogenerated Review: Parcel intersects with 100 Year Floodplain. (Parcel: 7403400021) | | Floodplain | 2114843 |