CSU Water | Original | D | 3/11/2025 | CSUREVIEW | CSUREVIEW | Any plumbing comments pertaining to CSU must be addressed. CJS | cjsavage | CSU Water | 2129668 |
CSU Waste Water | Original | D | 3/11/2025 | CSUREVIEW | CSUREVIEW | Provide calculations demonstrating that existing grease interceptor capacity is sufficiently sized for all existing and proposed tenant spaces.
Requires approved Utility Service Plan (USP) showing all exterior sanitary service lines. Call UDS at 719-668-8259 with questions. CJS | cjsavage | CSU Waste Water | 2129662 |
Mechanical | Original | D | 3/11/2025 | DALEH | DALEH | Show roof access Indicate if roof is pitched or flat Provide cooler/freezer refrigeration calculations Show condensate routing and size from cooler/freezer Provide all manufacturers specs for hoods, fans etc.... Is wall behind hood built of non combustible materials ? Show on plans how shaft will be constructed from hood to fan Waiting on construction review comments All responses to comments must be answered on the plan sheets not just a response letter * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2129424 |
Zoning/Planning | Original | / | 3/11/2025 | MAMBUUL | MAMBUUL | In Current Review by MAMBUUL | | Zoning/Planning | 2129334 |
Construction | Original | D | 3/11/2025 | SHELLEY | SHELLEY | Code discrepancies, LSP components. rated wall details, IECC C505, see plans. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2129250 |
Electronic Plan | Original | / | 3/7/2025 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2128745 |
Plumbing | Original | D | 3/6/2025 | SHANEN | SHANEN | Show compliance with commercial plumbing plan review additional requirements for 2021 IECC. CSU approved construction drawings and utility service plan required to verify the plumbing plans correspond with the CSU approved plans for water service sizing, water entry location, building drain sizing, building drain location, grease interceptor location, etc. Provide a two way fitting or two riser clean-out at the junction of the building drain and building sewer in compliance with CO state amendment to section 708.1.3. All gas piping related items shall be on the mechanical plans. Remove all references to gas piping from the plumbing plans. 3/4"CW is undersized to serve downstream fixtures. Scheduled ET is for residential use only per manufacturer website. Provide required water pipe size analysis data, see 2021 IPC appendix E. Data must include: service pressure, service size, meter size, pressure loss, available pressure, distribution size, WSFU served, developed length, etc. Provide an isometric drawing of the water distribution system. Heated water supply piping must show compliance with 2021 IECC section C404.5.1. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2128018 |
Enumeration | Original | N | 2/28/2025 | AMY | AMY | | | Enumeration | 2125965 |
Electronic Plan | Original | / | 2/28/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2125941 |
Energy | Original | / | 2/27/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2125715 |
Floodplain | Original | N | 2/27/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 5330206016) | | Floodplain | 2125714 |