Electrical | Splice 08/25/25 | A | 8/25/2025 | DANIELG | DANIELG | | | Electrical | 2202107 |
Energy | Original | A | 5/6/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2155176 |
Plumbing | Original | A | 5/6/2025 | SHANEN | SHANEN | | | Plumbing | 2155175 |
| Original | / | 5/6/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2155157 |
| Original | / | 5/6/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2155151 |
Submittal 4 | Original | / | 5/6/2025 | QUINTONW | QUINTONW | Submittal #4 | | Submittal 4 | 2155150 |
Energy | Original | D | 5/5/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2154253 |
Plumbing | Original | D | 5/5/2025 | SHANEN | SHANEN | Piping insulation material schedule must include thickness, material (fiberglass, elastomeric foam, etc.) and manufacturer. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2154252 |
| Original | / | 5/5/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2154226 |
| Original | / | 5/5/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2154221 |
Submittal 3 | Original | / | 5/5/2025 | QUINTONW | QUINTONW | Submittal #3 | | Submittal 3 | 2154220 |
CO Springs DRE | Original | A | 5/2/2025 | CVANAPPLEDORN | CVANAPPLEDORN | Commercial interior remodel. No change of use or occupancy. | | CO Springs DRE | 2154179 |
Zoning/Planning | Original | / | 5/2/2025 | CVANAPPLEDORN | CVANAPPLEDORN | In Current Review by CVANAPPLEDORN | | Zoning/Planning | 2153576 |
Energy | Original | D | 5/1/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2153250 |
Plumbing | Original | D | 5/1/2025 | SHANEN | SHANEN | P0.1: Provide a piping insulation schedule, code tables are not an acceptable substitute. P1.1: Label the cold water. Lavatories must show compliance with 2021 IECC section C404.5.1. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2153249 |
Construction | Original | A | 5/1/2025 | SHELLEY | SHELLEY | | | Construction | 2153193 |
Submittal 2 | Original | / | 4/30/2025 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2152760 |
CO Springs Fire | Original | N | 4/14/2025 | CSFIRE | CSFIRE | No Fire Final | Jacob.Watson | CO Springs Fire | 2144311 |
CO Springs Hazmat | Original | N | 4/14/2025 | CSFIRE | CSFIRE | No Fire Final | Jacob.Watson | CO Springs Hazmat | 2144298 |
Energy | Original | D | 4/3/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2140223 |
Electrical | Original | A | 4/3/2025 | DANIELG | DANIELG | | | Electrical | 2140222 |
Electronic Plan | Original | / | 4/3/2025 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2140219 |
Mechanical | Original | A | 4/1/2025 | DALEH | DALEH | | | Mechanical | 2139288 |
CSU Waste Water | Original | N | 3/31/2025 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. DMM | dmakings | CSU Waste Water | 2138345 |
CSU Water | Original | N | 3/31/2025 | CSUREVIEW | CSUREVIEW | No new water service outside of building. DMM | dmakings | CSU Water | 2138344 |
CO Springs DRE | Original | D | 3/31/2025 | SSADLER | SSADLER | On the code study form, describe what type of work is being done. List the current use of the space and the proposed use | | CO Springs DRE | 2138283 |
Zoning/Planning | Original | / | 3/31/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2138262 |
Plumbing | Original | D | 3/31/2025 | SHANEN | SHANEN | See highlighted sections on clouded additional requirements for 2021 IECC block. All gas piping related items shall be on the mechanical plans. Remove all references to gas piping from the plumbing plans. Provide a piping insulation schedule, code sections are not an acceptable substitute. Heated water supply piping shall comply with 2021 IECC section C404.5. Lavatories must show compliance with 2021 IECC section C404.5.1. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2138249 |
Construction | Original | A | 3/31/2025 | SHELLEY | SHELLEY | | | Construction | 2138226 |
Electronic Plan | Original | / | 3/31/2025 | SHELLEY | SHELLEY | In Current Review by SHELLEY | | Electronic Plan | 2138183 |
Enumeration | Original | N | 3/28/2025 | BECKYA | BECKYA | | | Enumeration | 2137772 |
Energy | Original | / | 3/27/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2137357 |
Floodplain | Original | N | 3/27/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6406403006) | | Floodplain | 2137356 |