PROCESSING....
This is hidden content to make Wave think this is not a heading
Skip to main content
Pikes Peak Regional Building Department
Ensuring life safety and welfare of our community through efficient and consistent application of adopted codes and standards.
Home
Contact
Search
Accessibility
Cart
Sign In
Home
Contact
Search
Accessibility
Cart
Sign In
Plan Details
Clear
Permits
By Address
By Permit Number
Fee Calculator
Plans
By Address
List of Plans
Links
City PlanTrac
Colorado Springs Utilities
Home
Plan #
  
Type
 
Plan
Owner
Address
502 S TEJON ST, COLORADO SPRINGS, CO 80903
Parcel Info
6418319013
Truss P/SF
30 (Elevation: 5,989 Feet)
Project
COMMERCIAL REMODEL (
437
)
Type Of Plan
Normal
Review Type
Electronic
Fire District
COLORADO SPRINGS FIRE DIST
Submit Date
Approval Date
Location
Plan Image
View Plan Image
Download Plan Image
Map
Google Map
Yahoo Maps
Bing Maps
MapQuest
GIS Map
County Map & Data
PPRBD Directions
Required Departments: 12
By checking this box, you agree to the following:
Overtime reviews are billed at $100/hour of review time.
Requesting overtime is optional. If I don’t request it, my plan will still be reviewed in the order submitted.
Overtime reviews are dependent on staff availability, so there is no guarantee that the review will be expedited. You will only be charged overtime fees if we are able to perform those reviews. If no one is available to take that review on an overtime basis, your plan may end up being reviewed in the regular sequence.
Required Departments and Log Entries
Department
Status
Approve Overtime
Overtime
Overtime_2
BoundColumn_2
Department
Construction
D
0
C
Construction
Electrical
D
0
E
Electrical
Energy
D
G
Energy
Enumeration
N
0
N
Enumeration
CO Springs Fire
N
F
CO Springs Fire
Floodplain
N
W
Floodplain
CO Springs Hazmat
N
B
CO Springs Hazmat
Mechanical
D
0
M
Mechanical
Plumbing
D
0
P
Plumbing
CSU Waste Water
N
Y
CSU Waste Water
CSU Water
N
A
CSU Water
CO Springs DRE
A
0
Z
CO Springs DRE
Log Entries: 16
Log Details
View Log
Log
Time Summary
Department
Splice
Status
Date
Reviewer
Reviewer
Comment
username
Department
tid
CO Springs Fire
Original
N
5/27/2025
CSFIRE
CSFIRE
No Fire Final
PERMITS AND DEFERRED SUBMITTALS:
The following deferred submittals may be required depending on your scope of work:
--X-- Fire Alarm
--X-- Fire Sprinkler
Ensure all applicable permits are obtained from the Regional Building Department and the Colorado Springs Fire Department for the work that is being done at this site.
Jacob.Watson
CO Springs Fire
2162851
CO Springs Hazmat
Original
N
5/27/2025
CSFIRE
CSFIRE
No Fire Final
Jacob.Watson
CO Springs Hazmat
2162849
Energy
Original
D
5/22/2025
SYSTEM
SYSTEM
Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews
Energy
2162069
Electrical
Original
D
5/22/2025
DANIELG
DANIELG
Clarify electrical scope of work.
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Electrical
2162068
Electronic Plan
Original
/
5/22/2025
DANIELG
DANIELG
In Current Review by DANIELG
Electronic Plan
2162066
CO Springs DRE
Original
A
5/19/2025
SSADLER
SSADLER
Commercial interior remodel to add restroom approved
CO Springs DRE
2160279
Mechanical
Original
D
5/16/2025
TREVORH
TREVORH
Disapproved; Need to see construction review comments addressed to complete Mechanical review
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Mechanical
2159902
Plumbing
Original
D
5/15/2025
SHANEN
SHANEN
Construction review comments must be addressed. Plumbing plan review stopped and incomplete. Provide separate plumbing plans that comply with PPRBD plumbing plan review requirements. See link: https://www.pprbd.org/File/ByAlias/PlumbingReview
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Plumbing
2158962
CSU Water
Original
N
5/15/2025
CSUREVIEW
CSUREVIEW
No new water service outside of building. mjg
mgackle
CSU Water
2158942
CSU Waste Water
Original
N
5/15/2025
CSUREVIEW
CSUREVIEW
No new wastewater service outside of building. mjg
mgackle
CSU Waste Water
2158941
Zoning/Planning
Original
/
5/15/2025
SSADLER
SSADLER
In Current Review by SSADLER
Zoning/Planning
2158923
Construction
Original
D
5/14/2025
SHELLEY
SHELLEY
Clarify. Scope appears to be creating a restroom in a space not previously used as such. Architectural plans are required.
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Construction
2158878
Enumeration
Original
N
5/14/2025
BECKYA
BECKYA
Enumeration
2158421
Electronic Plan
Original
/
5/14/2025
BECKYA
BECKYA
In Current Review by BECKYA
Electronic Plan
2158420
Energy
Original
/
5/12/2025
SYSTEM
SYSTEM
Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews
Energy
2157492
Floodplain
Original
N
5/12/2025
RBD GIS
RBD GIS
Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6418319013)
Floodplain
2157491