Electrical | Original | A | 9/6/2025 | BERTHA | BERTHA | | | Electrical | 2207477 |
Energy | Original | A | 9/6/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2207478 |
| Original | / | 9/2/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee(s) Paid | | | 2205886 |
| Original | / | 8/28/2025 | SYSTEM | SYSTEM | Resubmittal Processing Fee Due | | | 2204785 |
Submittal 3 | Original | / | 8/28/2025 | SIERRAC | SIERRAC | Submittal #3 | | Submittal 3 | 2204784 |
Energy | Original | D | 8/26/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2203512 |
Mechanical | Original | A | 8/26/2025 | DALEH | DALEH | | | Mechanical | 2203511 |
Electrical | Original | D | 8/26/2025 | BERTHA | BERTHA | Provide plans reflecting Mechanical Plan revisions. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2203484 |
Submittal 2 | Original | / | 8/25/2025 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2202221 |
EPC Health Dept | Original | N | 8/11/2025 | HEALTHDEPT | HEALTHDEPT | EPCPH plan review is not required, per Division Director. AM | Amanda Furno | EPC Health Dept | 2195993 |
Energy | Original | D | 8/9/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2195641 |
Electrical | Original | A | 8/9/2025 | DANIELG | DANIELG | | | Electrical | 2195640 |
CO Springs DRE | Original | N | 8/4/2025 | CHUDSPETH | CHUDSPETH | Replace pool heater, no change to footprint | | CO Springs DRE | 2193129 |
Zoning/Planning | Original | / | 8/1/2025 | CHUDSPETH | CHUDSPETH | In Current Review by CHUDSPETH | | Zoning/Planning | 2192666 |
Gas/Elec. Utils | Original | A | 8/1/2025 | CSUREVIEW | CSUREVIEW | CSU Field Engineer to determine final gas/electric meter, transformer and service line locations. Contact Field Engineering at 719-668-4985 (Gas) or 719-668-5564 (Electric) with any questions. mjg | mgackle | Gas/Elec. Utils | 2192256 |
CSU Water | Original | N | 7/31/2025 | CSUREVIEW | CSUREVIEW | No new water service outside of building. MLW | mlwilliams | CSU Water | 2192130 |
CSU Waste Water | Original | N | 7/31/2025 | CSUREVIEW | CSUREVIEW | No new wastewater service outside of building. MLW | mlwilliams | CSU Waste Water | 2192129 |
Mechanical | Original | D | 7/31/2025 | DALEH | DALEH | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2191931 |
Plumbing | Original | N | 7/31/2025 | SHANEN | SHANEN | | | Plumbing | 2191911 |
Construction | Original | N | 7/31/2025 | SHELLEY | SHELLEY | No construction work. | | Construction | 2191893 |
Enumeration | Original | N | 7/30/2025 | BRENT | BRENT | | | Enumeration | 2191440 |
Electronic Plan | Original | / | 7/30/2025 | BRENT | BRENT | In Current Review by BRENT | | Electronic Plan | 2191413 |
Energy | Original | / | 7/30/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2191095 |
Floodplain | Original | N | 7/30/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6321114017) | | Floodplain | 2191093 |