| Energy | Original | N | 10/31/2025 | SYSTEM | SYSTEM | Energy Department review not required under 2023 PPRBC when IECC is N/A | | Energy | 2231875 |
| WP Zoning | Original | A | 10/27/2025 | DBURGESS | DBURGESS | See 9/30/2025 WP Zoning comment | | WP Zoning | 2229326 |
| WP Enumeration | Original | A | 10/27/2025 | DBURGESS | DBURGESS | See 9/30/2025 WP Enumeration comment | | WP Enumeration | 2229324 |
| Submittal 2 | Original | / | 10/23/2025 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2227903 |
| WP Hazmat (CSFD Commercial) | Original | D | 10/8/2025 | CSFIRE | CSFIRE | see fire comments | phil.valdez | WP Hazmat (CSFD Commercial) | 2220954 |
| WP Fire (CSFD Commercial) | Original | D | 10/8/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | phil.valdez | WP Fire (CSFD Commercial) | 2220953 |
| Energy | Original | D | 10/7/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2220585 |
| Plumbing | Original | D | 10/7/2025 | SHANEN | SHANEN | Provide plumbing plans that comply with PPRBD commercial plumbing plan review requirements. See link: https://www.pprbd.org/File/ByAlias/PlumbingReview * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2220584 |
| Mechanical | Original | D | 10/1/2025 | DALEH | DALEH | Waiting on response to construction plan review comments Provide mechanical plans as needed * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2218157 |
| WP Waste Water | Original | D | 10/1/2025 | DBURGESS | DBURGESS | See WP Water comments - WP Waste Water approval is also dependent upon the water fixture unit count. | | WP Waste Water | 2218134 |
| WP Water | Original | D | 10/1/2025 | DBURGESS | DBURGESS | Utilities Director Kip Wiley is requesting an inventory of the existing water fixture unit count FOR ALL WATER FIXTURES IN THE ENTIRE BUILDING, along with then adding the new fixtures into the count so he can determine if the existing water service line is sized adequately.
There is a worksheet to assist in this on the CWP website located at this URL: https://woodlandpark.gov/DocumentCenter/View/5799/2025-Water-and-Sewer-Tap-Fees-with-Worksheet-for-Commercial | | WP Water | 2218133 |
| Electrical | Original | D | 9/30/2025 | DANIELG | DANIELG | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Electrical | 2217897 |
| Electronic Plan | Original | / | 9/30/2025 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2217890 |
| Construction | Original | D | 9/30/2025 | JUSTINL | JUSTINL | PRELIMINARY REVIEW ONLY. Scope of work unclear if this is a change of occupancy, interior finish to create new suite or an interior remodel. Too much missing information. See architectural sheets and code study for review comments. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2217874 |
| Electronic Plan | Original | / | 9/30/2025 | JUSTINL | JUSTINL | In Current Review by JUSTINL | | Electronic Plan | 2217823 |
| WP Zoning | Original | A | 9/30/2025 | DBURGESS | DBURGESS | Change in Use approved by Senior Planner CJ Gates on November 22, 2024. PLEASE NOTE: PPRBD may require plan submittal be modified to include a Change of Occupancy. | | WP Zoning | 2217717 |
| WP Floodplain | Original | N | 9/30/2025 | DBURGESS | DBURGESS | Verified not in a floodplain | | WP Floodplain | 2217714 |
| WP Enumeration | Original | A | 9/30/2025 | DBURGESS | DBURGESS | Address, owner, parcel number & Tax number matches Teller County Assessor's published online data. Modified PPRBD GIS Mapping Address Point to match. | | WP Enumeration | 2217713 |
| | Original | / | 9/12/2025 | SYSTEM | SYSTEM | Plan Review fees paid 09/12/2025 for plan submitted 09/10/2025. Submit Date updated to now. Plan now open for review. | | | 2210283 |
| Energy | Original | / | 9/10/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2209094 |