| CO Springs DRE | Original | D | 6/26/2026 | SSADLER | SSADLER | Approved for commercial interior remodel. No changes to footprint, use, landscaping, or parking. | | CO Springs DRE | 2327169 |
| Zoning/Planning | Original | / | 6/23/2026 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2325448 |
| Energy | Original | D | 6/23/2026 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2325406 |
| Mechanical | Original | D | 6/23/2026 | DALEH | DALEH | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2325405 |
| CSU Water | Original | A | 6/23/2026 | CSUREVIEW | CSUREVIEW | Backflow okay. CWMSF approved. USP approved 6/2/26.MDA | malcuran | CSU Water | 2325399 |
| CSU Waste Water | Original | A | 6/23/2026 | CSUREVIEW | CSUREVIEW | Backflow okay. CWMSF approved. USP approved 6/2/26.MDA | malcuran | CSU Waste Water | 2325397 |
| Plumbing | Original | D | 6/23/2026 | SHANEN | SHANEN | No plumbing plans provided with this re-submittal. Previous review comments must be addressed. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2325359 |
| Construction | Original | D | 6/23/2026 | DOUGC | DOUGC | IECC // CSF // Life Safety Plan * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2325354 |
| Submittal 2 | Original | / | 6/22/2026 | QUINTONW | QUINTONW | Submittal #2 | | Submittal 2 | 2324644 |
| Energy | Original | D | 10/15/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2224233 |
| Mechanical | Original | D | 10/15/2025 | DALEH | DALEH | * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Mechanical | 2224232 |
| Plumbing | Original | D | 10/9/2025 | SHANEN | SHANEN | CSU comments must be addressed. S occupancy requires a service sink. * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Plumbing | 2221797 |
| CO Springs Fire | Original | D | 10/8/2025 | CSFIRE | CSFIRE | You must have a ACA account in order to view your disapproval comments. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account. | chiptaylor | CO Springs Fire | 2221192 |
| CO Springs Hazmat | Original | N | 10/8/2025 | CSFIRE | CSFIRE | | chiptaylor | CO Springs Hazmat | 2221190 |
| Electrical | Original | A | 10/7/2025 | DANIELG | DANIELG | | | Electrical | 2220611 |
| Electronic Plan | Original | / | 10/7/2025 | DANIELG | DANIELG | In Current Review by DANIELG | | Electronic Plan | 2220599 |
| CO Springs DRE | Original | D | 10/6/2025 | SSADLER | SSADLER | On the code study form, mark the section for the change of occupancy. List the current and proposed business. | | CO Springs DRE | 2219858 |
| CSU Water | Original | D | 10/2/2025 | CSUREVIEW | CSUREVIEW | A Utility Service Plan may be required for this project. Contact Utilities Development Services at (719) 668-8259 to discuss requirements. Refer to 2023 Colorado Springs Utilities WaterLESS details B4-1 through B4-8 and select the correct meter detail to include on the plumbing plans after approval of the Commercial Water Meter Sizing Form. Also refer to details B4-16 through B4-22 and select an appropriate meter clearance detail to include on the plumbing plans. mjg | mgackle | CSU Water | 2218922 |
| CSU Waste Water | Original | D | 10/2/2025 | CSUREVIEW | CSUREVIEW | A Utility Service Plan may be required for this project. Contact Utilities Development Services at (719) 668-8259 to discuss requirements. mjg | mgackle | CSU Waste Water | 2218920 |
| Zoning/Planning | Original | / | 10/2/2025 | SSADLER | SSADLER | In Current Review by SSADLER | | Zoning/Planning | 2218780 |
| Construction | Original | D | 10/2/2025 | DOUGC | DOUGC | IECC // CSF // Life Safety Plan * Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections. Plans cannot be re-submitted until all required departments have completed their review. * | | Construction | 2218627 |
| Electronic Plan | Original | / | 10/1/2025 | DOUGC | DOUGC | In Current Review by DOUGC | | Electronic Plan | 2218199 |
| Enumeration | Original | N | 9/26/2025 | AMY | AMY | | | Enumeration | 2216535 |
| Electronic Plan | Original | / | 9/26/2025 | AMY | AMY | In Current Review by AMY | | Electronic Plan | 2216423 |
| | Original | / | 9/25/2025 | SYSTEM | SYSTEM | Plan Review fees paid 09/25/2025 for plan submitted 09/25/2025. Submit Date updated to now. Plan now open for review. | | | 2215985 |
| Energy | Original | / | 9/25/2025 | SYSTEM | SYSTEM | Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews | | Energy | 2215873 |
| Floodplain | Original | N | 9/25/2025 | RBD GIS | RBD GIS | Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6330307007) | | Floodplain | 2215872 |