PROCESSING....
This is hidden content to make Wave think this is not a heading
Skip to main content
Pikes Peak Regional Building Department
Ensuring life safety and welfare of our community through efficient and consistent application of adopted codes and standards.
Home
Contact
Search
Accessibility
Cart
Sign In
Home
Contact
Search
Accessibility
Cart
Sign In
Plan Details
Clear
Permits
By Address
By Permit Number
Fee Calculator
Plans
By Address
List of Plans
Links
City PlanTrac
Colorado Springs Utilities
Home
Plan #
  
Type
 
Plan
Owner
Address
1801 N UNION BLVD, COLORADO SPRINGS, CO 80909
Parcel Info
6404318048
Truss P/SF
30 (Elevation: 6,146 Feet)
Project
COMMERCIAL INTERIOR REMODEL (
437
)
Type Of Plan
Normal
Review Type
Electronic
Fire District
COLORADO SPRINGS FIRE DIST
Submit Date
Approval Date
Location
Plan Image
View Plan Image
Download Plan Image
Map
Google Map
Yahoo Maps
Bing Maps
MapQuest
GIS Map
County Map & Data
PPRBD Directions
Required Departments: 12
By checking this box, you agree to the following:
Overtime reviews are billed at $100/hour of review time.
Requesting overtime is optional. If I don’t request it, my plan will still be reviewed in the order submitted.
Overtime reviews are dependent on staff availability, so there is no guarantee that the review will be expedited. You will only be charged overtime fees if we are able to perform those reviews. If no one is available to take that review on an overtime basis, your plan may end up being reviewed in the regular sequence.
Required Departments and Log Entries
Department
Status
Approve Overtime
Overtime
Overtime_2
BoundColumn_2
Department
Construction
A
0
C
Construction
Electrical
D
0
E
Electrical
Energy
N
G
Energy
Enumeration
N
0
N
Enumeration
CO Springs Fire
A
F
CO Springs Fire
Floodplain
N
W
Floodplain
CO Springs Hazmat
N
B
CO Springs Hazmat
Mechanical
A
0
M
Mechanical
Plumbing
A
0
P
Plumbing
CSU Waste Water
N
Y
CSU Waste Water
CSU Water
N
A
CSU Water
CO Springs DRE
A
0
Z
CO Springs DRE
Log Entries: 17
Log Details
View Log
Log
Time Summary
Department
Splice
Status
Date
Reviewer
Reviewer
Comment
username
Department
tid
CO Springs Fire
Original
A
10/9/2025
CSFIRE
CSFIRE
You are responsible for reviewing the comments through your ACA account. You can find the link to the ACA website and a tutorial video on how to set up an account at: https://coloradosprings.gov/fire-code-resources . If you do not have an ACA account at time of CSFD review you will need to reach out to the CSFD Construction Service staff to link the review to your account.
ALL PLAN APPROVALS SUBJECT TO FINAL INSPECTION!
Jacob.Watson
CO Springs Fire
2222181
CO Springs Hazmat
Original
N
10/9/2025
CSFIRE
CSFIRE
NA
Jacob.Watson
CO Springs Hazmat
2222177
CSU Water
Original
N
10/8/2025
CSUREVIEW
CSUREVIEW
No new water service outside of building.
MAR
MRoberts
CSU Water
2221377
CSU Waste Water
Original
N
10/8/2025
CSUREVIEW
CSUREVIEW
No new wastewater service outside of building.
MAR
MRoberts
CSU Waste Water
2221375
CO Springs DRE
Original
A
10/8/2025
SSADLER
SSADLER
Interior remodel only. No change in footprint, No change in parking. No change in occupancy.
CO Springs DRE
2221353
Zoning/Planning
Original
/
10/8/2025
SSADLER
SSADLER
In Current Review by SSADLER
Zoning/Planning
2221350
Plumbing
Original
A
10/8/2025
SHANEN
SHANEN
Plumbing
2221340
Electrical
Original
D
10/8/2025
BERTHA
BERTHA
Comply with 250.102(C)(1)
Provide footprint (site plan) showing all electrical service equipment and disconnects serving the structure
Verify compliance with 210.25 and 240.24 NEC
Recessed lighting must be shown on the lighting schedule and comply with C402.5.10.
Where applicable, Daylight Zones must be shown on the plans per C405.2.4.2 through C405.2.4.4.
Provide a note on the plans indicating that the Electrical design has a maximum volt drop of 5% per C405.10.
The following general note must be included on the electrical plans: “A Final Commissioning Report
shall be delivered to the building owner per section C408.2.5 of the 2021 IECC.”
Controlled receptacles must be shown on the plan per C405.11 and the symbol used to mark these receptacles must be as shown in article 406.3(E) of the adopted National Electrical Code (NEC). - for work stations / power poles.
.
* Please see either the "Progress Set" or the "Review Set" for complete list of this department's corrections.
Plans cannot be re-submitted until all required departments have completed their review. *
Electrical
2221334
Mechanical
Original
A
10/8/2025
DALEH
DALEH
Mechanical
2221333
Energy
Original
N
10/8/2025
SYSTEM
SYSTEM
Energy Department review not required under 2023 PPRBC when IECC is N/A
Energy
2221301
Construction
Original
A
10/8/2025
JUSTINL
JUSTINL
Construction
2221300
Electronic Plan
Original
/
10/8/2025
JUSTINL
JUSTINL
In Current Review by JUSTINL
Electronic Plan
2221279
Enumeration
Original
N
10/7/2025
BECKYA
BECKYA
Enumeration
2220564
Electronic Plan
Original
/
10/7/2025
BECKYA
BECKYA
In Current Review by BECKYA
Electronic Plan
2220546
Original
/
10/6/2025
SYSTEM
SYSTEM
Plan Review fees paid 10/06/2025 for plan submitted 10/06/2025. Submit Date updated to now. Plan now open for review.
2220117
Energy
Original
/
10/6/2025
SYSTEM
SYSTEM
Energy Department review for 2023 PPRBC (2021 IECC Amended) is based on status of Construction, Electrical, Mechanical and Plumbing reviews
Energy
2220079
Floodplain
Original
N
10/6/2025
RBD GIS
RBD GIS
Autogenerated Review: Outside 100 Year Floodplain. (Parcel: 6404318048)
Floodplain
2220078